Letter Sequence RAI |
|---|
|
Results
Other: CNL-15-095, Revision to the Reactor Pressure Vessel Surveillance Capsule Withdrawal Schedule for License Renewal, CNL-15-164, Second Annual Update, License Renewal Application, CNL-15-178, License Renewal Application - Clarifications, ML13032A251, ML13057A873, ML13067A201, ML13119A135, ML13141A320, ML15236A067
|
MONTHYEARML13011A3242013-01-0707 January 2013 Submittal of Discharge Monitoring Report for December 2012 Project stage: Request ML13024A0042013-01-0707 January 2013 Transmittal of License Renewal Application Project stage: Request ML13032A2512013-01-10010 January 2013 Reactor Pressure Vessel Surveillance Capsule Withdrawal Schedule Revision Due to License Renewal Amendment Project stage: Other ML13057A8732013-03-0808 March 2013 Plan for the Scoping and Screening Regulatory Audit Regarding the Sequoyah Nuclear Plant, Unit 1 and 2, LRA Review Project stage: Other ML13067A2012013-03-11011 March 2013 Plan for the Aging Management Program Regulatory Audit Regarding the Sequoyah Nuclear Plant, Units 1 and 2 License Renewal Application Review Project stage: Other ML13109A5152013-04-26026 April 2013 Requests for Additional Information for the Review of the Sequoyah Nuclear Plant, Units 1 and 2, License Renewal Application Project stage: RAI ML13122A3402013-05-0808 May 2013 RAI for the Review of the Sequoyah Nuclear Plant, Units 1 and 2, License Renewal Application Project stage: RAI ML13119A1352013-05-16016 May 2013 Scoping and Screening Methodology Audit Report Regarding the Sequoyah Nuclear Plant, Units 1 and 2 Project stage: Other ML13119A0972013-05-21021 May 2013 Summary of Telephone Conference Call Held on April 22, 2013 Between the U.S. Nuclear Regulatory Commission and Tva,Concerning Requests for Additional Information Pertaining to the Sequoyah Nuclear Plant, License Renewal Application Project stage: RAI ML13142A3322013-05-21021 May 2013 Requests for Additional Information for the Review of the Sequoyah Nuclear Plant, Units 1 and 2, License Renewal Application Project stage: RAI ML13128A5192013-05-31031 May 2013 Request for Additional Information for the Review of the Sequoyah Nuclear Plant, Units 1 and 2, License Renewal Application Project stage: RAI ML13134A2012013-06-0505 June 2013 RAI for the Review of the Sequoyah Nuclear Plant, Units 1 and 2, LRA Project stage: RAI ML13163A4422013-06-0707 June 2013 Response to NRC Request for Additional Information Regarding the Scoping and Screening Methodology Review of the License Renewal Application, Set 3 Project stage: Response to RAI ML13144A7122013-06-11011 June 2013 Requests for Additional Information for the Review of the Sequoyah Nuclear Plant, Units 1 and 2, License Renewal Application (Tac Nos. MF0481 and MF0482)- Set 6 Project stage: RAI ML13141A3202013-06-13013 June 2013 Letter Aging Management Programs Audit Report Regarding the Sequoyah Nuclear Plant, Units 1 and 2 Project stage: Other ML13134A3712013-06-13013 June 2013 5/9/2013 Summary of Telephone Conference Call Between the U.S. Nuclear Regulatory Commission and Tennessee Valley Authority, Concerning Requests for Additional Information Pertaining to the Sequoyah Nuclear Plant, Units 1 and 2, License Ren Project stage: RAI ML13135A0942013-06-13013 June 2013 Summary of Telephone Conference Call Held on May 14, 2013, Between the U.S. Nuclear Regulatory Commission and Tennessee Valley Authority Concerning Requests for Additional Information Pertaining to the Sequoyah Nuclear Plant, Units 1 and 2, Project stage: RAI ML13150A4122013-06-24024 June 2013 Requests for Additional Information for the Review of the Sequoyah Nuclear Plant, Units 1 and 2, License Renewal Application (TAC Nos. MF0481 and MF0482) - Set 8 Project stage: RAI ML13178A2832013-06-25025 June 2013 Response to NRC Request for Additional Information Regarding the Reactor Vessel Internals Review of the License Renewal Application, Set 1 Project stage: Response to RAI ML13158A0162013-06-25025 June 2013 Requests for Additional Information for the Review of the Sequoyah Nuclear Plant, Units 1 and 2, License Renewal Application (TAC Nos. MF0481 and MF0482) Set 9 Project stage: RAI ML13190A2762013-07-0101 July 2013 Response to NRC Request for Additional Information Regarding the Review of the License Renewal Application, Set 4 Project stage: Response to RAI ML13192A3302013-07-0303 July 2013 Response to NRC Request for Additional Information Regarding the Review of License Renewal Application, Set 5 Project stage: Response to RAI ML13204A3992013-07-11011 July 2013 Response to NRC Request for Additional Information Re Reactor Vessel Internals Review of the License Renewal Application, Set 6 Project stage: Response to RAI ML13213A0262013-07-25025 July 2013 Response to NRC Request for Additional Information Regarding the Review of License Renewal Application, Set 4/Buried Piping, Set 8, and Set 9 Project stage: Response to RAI ML13213A0272013-07-29029 July 2013 Response to NRC Request for Additional Information Regarding the Review of License Renewal Application, Set 7 Project stage: Response to RAI ML13213A0142013-07-30030 July 2013 Revised Response to NRC Request for Additional Information Regarding the Review of the License Renewal Application, Sets 1 and 3 Project stage: Response to RAI ML13171A0362013-08-0101 August 2013 Summary of Telephone Conference Call Held on June 13, 2013, Between the NRC and Tennessee Valley Authority, Concerning RAI Pertaining to the Sequoyah Nuclear Plant, Units 1 and 2, LRA Project stage: RAI ML13204A2572013-08-0202 August 2013 Requests for Additional Information for the Review of the Sequoyah Nuclear Plant, Units 1 and 2, License Renewal Application (TAC Nos. MF0481 and MF0482) - Set 10 Project stage: RAI ML13225A3872013-08-0909 August 2013 Response to NRC Request for Additional Information Regarding the Review of the Sequoyah Nuclear Plant, Units I and 2, License Renewal Application, Sets 1, 6, 7, and Revised Responses for 1.4-2, 1.4-3 and 1.4-4 Project stage: Response to RAI ML13224A1262013-08-22022 August 2013 RAI for Review of Sequoyah, Units 1 & 2 License Renewal Application - Set 11 Project stage: RAI ML13238A2442013-08-30030 August 2013 RAI Set 12 Project stage: RAI ML13252A0362013-09-0303 September 2013 Response to NRC Request for Additional Information Regarding the Review of the License Renewal Application, Set 10 (30-day), B.1.9-1, B.1.4-4 Revised RAI Responses and Revision to LRA Page 2.4-44 Project stage: Response to RAI ML13226A3712013-09-10010 September 2013 Summary of Telephone Conference Call Held on August 1, 2013, Between the U.S. Nuclear Regulatory Commission and Tennessee Valley Authority, Concerning Requests for Additional Information Pertaining to the Sequoyah Nuclear Plant, Units 1 Project stage: RAI ML13256A0072013-09-16016 September 2013 Requests for Additional Information for the Review of the Sequoyah Nuclear Plant, Units 1 and 2, License Renewal Application (TAC Nos. MF0481 and MF0482) - Set 13 Project stage: RAI ML13267A1592013-09-20020 September 2013 Response to NRC Request for Additional Information Regarding the Review of the Sequoyah Nuclear Plant, Units 1 and 2, License Renewal Application, Set 11 (30-day), and Revised RAI Responses for B.1.14-1a, 2.5 Project stage: Response to RAI ML13247A4272013-09-23023 September 2013 Summary of Telephone Conference Call Held on August 19, 2013, Between the NRC and Tennessee Valley Authority, Concerning RAI Pertaining to the Sequoyah Nuclear Plant, Units 1 and 2, LRA Project stage: RAI ML13263A3382013-09-26026 September 2013 RAI Set 14 Project stage: RAI ML13268A4922013-09-27027 September 2013 RAI Set 15 Project stage: RAI ML13276A0182013-09-30030 September 2013 Response to NRC Request for Additional Information Regarding the Review of the License Renewal Application, Sets 10 (B.1.23-2a), 11 (4.1-8a), and 12 (30-day) Project stage: Response to RAI CNL-13-103, Response to NRC Request for Additional Information Regarding the Review of the Sequoyah Nuclear Plant, Units 1 and 2, License Renewal Application, Sets 8 (B.1.33-1), 10 (3.0.3-1 Request 1), 12 (B.1.23-2b), 13 (30-day), 14 (B.0.4-1a)2013-10-17017 October 2013 Response to NRC Request for Additional Information Regarding the Review of the Sequoyah Nuclear Plant, Units 1 and 2, License Renewal Application, Sets 8 (B.1.33-1), 10 (3.0.3-1 Request 1), 12 (B.1.23-2b), 13 (30-day), 14 (B.0.4-1a) Project stage: Response to RAI ML13282A3302013-10-18018 October 2013 RAI Set 16 Project stage: RAI CNL-13-104, Response to NRC Request for Additional Information Regarding the Review of License Renewal Application, Sets 11 (B.1.40-4a, B.1.25.1a), 13 (B.1.41-4a),14 (3.5.1-57, 3.5.1-87)2013-10-21021 October 2013 Response to NRC Request for Additional Information Regarding the Review of License Renewal Application, Sets 11 (B.1.40-4a, B.1.25.1a), 13 (B.1.41-4a),14 (3.5.1-57, 3.5.1-87) Project stage: Response to RAI ML13294A3942013-10-25025 October 2013 Requests for Additional Information for the Review of the Sequoyah Nuclear Plant, Units 1 & 2, License Renewal Application (TAC Nos. MF0481 and MF0482) - Set 17 Project stage: RAI CNL-13-105, Response to NRC Request for Additional Information Regarding Review of the License Renewal Application, Sets 10 (3.0.3-1, Requests 3, 4, 6), 12 (B.1.6-1b, B.1.6-2b), 16 (4.3.1-8a)2013-11-0404 November 2013 Response to NRC Request for Additional Information Regarding Review of the License Renewal Application, Sets 10 (3.0.3-1, Requests 3, 4, 6), 12 (B.1.6-1b, B.1.6-2b), 16 (4.3.1-8a) Project stage: Response to RAI CNL-13-106, Response to NRC Request for Additional Information Regarding the Review of the Sequoyah Nuclear Plant, Units I and 2, License Renewal Application, Sets 13 (B.1.34-5a), 15 (4.2-1a), 16 (B.1.23-2c), 17 (B.1.23-2d), LRA Sections A.1.34 and B2013-11-15015 November 2013 Response to NRC Request for Additional Information Regarding the Review of the Sequoyah Nuclear Plant, Units I and 2, License Renewal Application, Sets 13 (B.1.34-5a), 15 (4.2-1a), 16 (B.1.23-2c), 17 (B.1.23-2d), LRA Sections A.1.34 and B.1 Project stage: Response to RAI ML13323A0972013-12-0606 December 2013 RAI Set 18 Project stage: RAI CNL-13-130, Response to NRC Request for Additional Information Regarding the Review of the License Renewal Application, B.1.41-4b, 3.0.3-1 (Requests La, 3a, 4a, 6a), B.1.23-2e, 3.4.2.1.1-2a, Tables (3.4.1, 3.4.2-3-5, 3.3.12013-12-16016 December 2013 Response to NRC Request for Additional Information Regarding the Review of the License Renewal Application, B.1.41-4b, 3.0.3-1 (Requests La, 3a, 4a, 6a), B.1.23-2e, 3.4.2.1.1-2a, Tables (3.4.1, 3.4.2-3-5, 3.3.1 Project stage: Response to RAI ML13353A5382013-12-23023 December 2013 RAI Set 19 Project stage: RAI ML13338A3332014-01-0808 January 2014 Summary of Telephone Conference Call Held on August 22, 2013, Between the U.S. Nuclear Regulatory Commission and Tennessee Valley Authority, Concerning Requests for Additional Information Pertaining to the Sequoyah Nuclear Plant, Units 1 an Project stage: RAI CNL-14-010, Response to NRC Request for Additional Information Regarding the Review of the Sequoyah Nuclear Plant, Units 1 and 2, License Renewal Application, 3.0.3-1 (Requests 3b, -3a, 4b, 6b); B.1.34-8; B.1.34-9; A.1-2; Tables 3.3.1, 3.3.2-11, and2014-01-16016 January 2014 Response to NRC Request for Additional Information Regarding the Review of the Sequoyah Nuclear Plant, Units 1 and 2, License Renewal Application, 3.0.3-1 (Requests 3b, -3a, 4b, 6b); B.1.34-8; B.1.34-9; A.1-2; Tables 3.3.1, 3.3.2-11, and 3 Project stage: Response to RAI 2013-06-05
[Table View] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 23, 2015 LICENSEE:
Tennessee Valley Authority FACILITY:
Sequoyah Nuclear Plant, Units 1 and 2
SUBJECT:
SUMMARY
OF TELEPHONE CONFERENCE CALL HELD ON MAY 13, 2015, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND TENNESSEE VALLEY AUTHORITY, CONCERNING REQUESTS FOR ADDITIONAL INFORMATION, SET 24 PERTAINING TO THE SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION (TAC NOS. MF0481 AND MF0482)
The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Tennessee Valley Authority (TVA or the applicant) held a telephone conference call on May 13, 2015, to discuss and clarify the staffs draft requests for additional information (DRAIs) provided in concerning the Sequoyah Nuclear Plant, Units 1 and 2, license renewal application.
The telephone conference call was useful in clarifying the intent of the staffs DRAIs.
provides a listing of the participants and Enclosure 2 contains the DRAIs discussed with the applicant, including a brief description on the status of the items.
The applicant had an opportunity to comment on this summary.
Sincerely,
/RA by Phyllis Clark for/
Emmanuel Sayoc, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-327 and 50-328
Enclosures:
- 1. List of Participants
- 2. Summary of Telephone Conference Call cc: Listserv
June 23, 2015 LICENSEE:
Tennessee Valley Authority FACILITY:
Sequoyah Nuclear Plant, Units 1 and 2
SUBJECT:
SUMMARY
OF TELEPHONE CONFERENCE CALL HELD ON MAY 13, 2015, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND TENNESSEE VALLEY AUTHORITY, CONCERNING REQUESTS FOR ADDITIONAL INFORMATION, SET 24 PERTAINING TO THE SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION (TAC NOS. MF0481 AND MF0482)
The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Tennessee Valley Authority (TVA or the applicant) held a telephone conference call on May 13, 2015, to discuss and clarify the staffs draft requests for additional information (DRAIs) provided in concerning the Sequoyah Nuclear Plant, Units 1 and 2, license renewal application.
The telephone conference call was useful in clarifying the intent of the staffs DRAIs.
provides a listing of the participants and Enclosure 2 contains the DRAIs discussed with the applicant, including a brief description on the status of the items.
The applicant had an opportunity to comment on this summary.
Sincerely,
/RA by Phyllis Clark for/
Emmanuel Sayoc, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-327 and 50-328
Enclosures:
- 1. List of Participants
- 2. Summary of Telephone Conference Call cc: Listserv DISTRIBUTION:
See next page ADAMS Accession Number: ML15152A031
- Concurred via e-mail OFFICE LA:DLR*
PM:RPB1:DLR PM:RPB1:DLR* BC:RPB1:DLR PM:RPB1:DLR NAME YEdmonds PClark JDaily YDiaz-Sanabria PClark DATE 6/10/15 6/ 23 /15 6/ 23 /15 6/ 23 /15 6/ 23 /15 OFFICIAL RECORD COPY
Memo to Tennessee Valley Authority from E. Sayoc dated June 23, 2015
SUBJECT:
SUMMARY
OF TELEPHONE CONFERENCE CALL HELD ON MAY 13, 2015, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND TENNESSEE VALLEY AUTHORITY, CONCERNING REQUESTS FOR ADDITIONAL INFORMATION, SET 24 PERTAINING TO THE SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION (TAC NOS. MF0481 AND MF0482)
DISTRIBUTION:
HARD COPY:
DLR RF E-MAIL:
PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRerb Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrPMSequoyah Ressource beth.mizuno@nrc.gov jeremy.wachutka@nrc.gov john.pelchat@nrc.gov gena.woodruff@nrc.gov siva.lingam@nrc.gov wesley.deschaine@nrc.gov galen.smith@nrc.gov scott.shaeffer@nrc.gov jeffrey.hamman@nrc.gov craig.kontz@nrc.gov caudle.julian@nrc.gov generette.lloyd@epa.gov gmadkins@tva.gov clwilson@tva.gov ekwest@tva.govdllundy@tva.gov
ENCLOSURE 1 TELEPHONE CONFERENCE CALL SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS MAY 13, 2015 PARTICIPANTS AFFILIATION Jeffrey Mitchell U.S. Nuclear Regulatory Commission (NRC)
Yoira Diaz-Sanabria NRC Dennis Morey NRC Allen Hiser NRC Seung Min NRC James Medoff NRC Bart Fu NRC Ganesh Cheruvenki NRC Erin Henderson Tennessee Valley Authority (TVA)
Don Goodin TVA William Pierce TVA Michael Henderson TVA Terry Woods TVA Christopher Reneau TVA Gawatha Haliburton TVA Tom Hess TVA Mike McBearty TVA
ENCLOSURE 2
SUMMARY
OF TELEPHONE CONFERENCE CALL SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION MAY 13, 2015 The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Tennessee Valley Authority (TVA or the applicant) held a telephone conference call on May 13, 2015, to discuss and clarify the following draft requests for additional information (DRAIs) concerning the Sequoyah Nuclear Plant, Units 1 and 2 license renewal application (LRA).
DRAI B.1.35-2
Background:
In a teleconference call held on April 30, 2015, the applicant indicated that during the Cycle 19 refueling outage (November 2013) at Sequoyah Unit 1, the surveillance capsule at location S was relocated to a high neutron flux region, location T, to support reactor vessel surveillance for license renewal. The applicant indicated that this capsule relocation is consistent with the applicants plan for surveillance capsule withdrawal for license renewal, as described in the applicants letter dated January 10, 2013, and as approved by the staff in its letter dated September 27, 2013.
The applicant further indicated that during the Cycle 20 refueling outage (April 2015) it discovered that the Unit 1 surveillance capsule at location T had been ejected from the surveillance capsule basket. In addition, the applicant indicated that the capsule had broken apart during the last cycle and that the surveillance specimens are no longer useable.
Issue:
The staff noted that the applicant had a capsule withdrawal schedule that would withdraw the Unit 1 capsule at location T during the Cycle 28 refueling outage. Since the capsule was lost, the staff needs additional information to determine the adequacy of the applicants Reactor Vessel Surveillance Program.
Request:
- 1.
In order to demonstrate the adequacy of the Reactor Vessel Surveillance Program for license renewal, describe the applicants new plan for surveillance capsule withdrawal now that the Unit 1 capsule at location T is not available.
- 2.
Describe corrective actions to prevent similar events impacting the availability of reactor vessel surveillance capsules for withdrawal.
Discussion:
The applicant stated that the above requests would be addressed in a letter to be submitted to the NRC within one week of the date of this telecon. Therefore, the staff determined there is no
immediate need to issue this Request for Additional Information (RAI). If the letter does not completely address this RAI, the staff will issue a revised RAI in the future.
DRAI B.1.34-10
Background:
The applicants Reactor Vessel Internals (RVI) aging management program (AMP) is given in LRA Section B.1.34 and uses the sample-based inspection and evaluation (I&E) methodology for Westinghouse-designed pressurized water reactors (PWRs) described in EPRI Report MRP-227-A.
During the spring 2015, refueling outage for Sequoyah Unit 1, the applicant determined that two reactor vessel (RV) surveillance capsules had fallen from their surveillance capsule holders and were sufficiently damaged such that a number of capsule parts and surveillance capsule specimens were released as loose parts into the lower plenum region of the reactor vessel.
Issue:
The sampling based I&E methodology in MRP-227-A is predicated on the assumptions that reactor internals assessed in the MRP-191 report are not degraded. The staff needs further demonstration that the loose parts in Sequoyah Unit 1, have not caused damage to these RVI components such that the assumptions for MRP-227-A are still valid for the period of extended operation. Otherwise, if damage has occurred to the reactor internals, the staff will need assessment of its impact on the assumptions that were used to develop the MRP-227-A based inspection plan for reactor internals at Sequoyah Unit 1.
Request:
- 1.
For all RVI components inspected during the spring 2015 refueling outage, identify the type of inspection, inspection method, sample size, and summarize the inspection results including any damage to the components.
- 2.
Clarify whether the augmented inspection and evaluation methods that apply to the components in MRP-227-A will remain valid and bounding for the RVI components at Sequoyah Unit 1.
- 3.
Clarify how applicable inspection and evaluation methods will be adjusted if the bases in MRP-227-A will not remain bounding for Sequoyah Unit 1, during the period of extended operation.
Discussion:
The applicant stated that the above requests would be addressed in a letter to be submitted to the NRC within two weeks of the telecon. Therefore, the staff determined there is no immediate need to issue this RAI. If the letter does not completely address this RAI, the staff will issue a revised RAI in the future.