Other: CNL-15-095, Revision to the Reactor Pressure Vessel Surveillance Capsule Withdrawal Schedule for License Renewal, CNL-15-164, Second Annual Update, License Renewal Application, CNL-15-178, License Renewal Application - Clarifications (TAC Nos. MF0481 and MF0482), ML13032A251, ML13057A873, ML13067A201, ML13141A320, ML15236A067
|
MONTHYEARML13024A0042013-01-0707 January 2013 Transmittal of License Renewal Application Project stage: Request ML13032A2512013-01-10010 January 2013 Reactor Pressure Vessel Surveillance Capsule Withdrawal Schedule Revision Due to License Renewal Amendment Project stage: Other ML13057A8732013-03-0808 March 2013 Plan for the Scoping and Screening Regulatory Audit Regarding the Sequoyah Nuclear Plant, Unit 1 and 2, LRA Review Project stage: Other ML13067A2012013-03-11011 March 2013 Plan for the Aging Management Program Regulatory Audit Regarding the Sequoyah Nuclear Plant, Units 1 and 2 License Renewal Application Review (TAC Nos. MF0481 and MF0482) Project stage: Other ML13109A5152013-04-26026 April 2013 Requests for Additional Information for the Review of the Sequoyah Nuclear Plant, Units 1 and 2, License Renewal Application (TAC Nos. MF0481 and MF0482) Project stage: RAI ML13122A3402013-05-0808 May 2013 RAI for the Review of the Sequoyah Nuclear Plant, Units 1 and 2, License Renewal Application (TAC Nos. MF0481 and MF0482) Project stage: RAI ML13119A0972013-05-21021 May 2013 Summary of Telephone Conference Call Held on April 22, 2013 Between the U.S. Nuclear Regulatory Commission and Tva,Concerning Requests for Additional Information Pertaining to the Sequoyah Nuclear Plant, License Renewal Application Project stage: RAI ML13142A3322013-05-21021 May 2013 Requests for Additional Information for the Review of the Sequoyah Nuclear Plant, Units 1 and 2, License Renewal Application (TAC Nos. MF0481 and MF0482) Project stage: RAI ML13128A5192013-05-31031 May 2013 Request for Additional Information for the Review of the Sequoyah Nuclear Plant, Units 1 and 2, License Renewal Application Project stage: RAI ML13134A2012013-06-0505 June 2013 RAI for the Review of the Sequoyah Nuclear Plant, Units 1 and 2, LRA Project stage: RAI ML13163A4422013-06-0707 June 2013 Response to NRC Request for Additional Information Regarding the Scoping and Screening Methodology Review of the License Renewal Application, Set 3 Project stage: Response to RAI ML13144A7122013-06-11011 June 2013 Requests for Additional Information for the Review of the Sequoyah Nuclear Plant, Units 1 and 2, License Renewal Application (Tac Nos. MF0481 and MF0482)- Set 6 Project stage: RAI ML13134A3712013-06-13013 June 2013 5/9/2013 Summary of Telephone Conference Call Between the U.S. Nuclear Regulatory Commission and Tennessee Valley Authority, Concerning Requests for Additional Information Pertaining to the Sequoyah Nuclear Plant, Units 1 and 2, License Ren Project stage: RAI ML13141A3202013-06-13013 June 2013 Letter Aging Management Programs Audit Report Regarding the Sequoyah Nuclear Plant, Units 1 and 2 Project stage: Other ML13150A4122013-06-24024 June 2013 Requests for Additional Information for the Review of the Sequoyah Nuclear Plant, Units 1 and 2, License Renewal Application (TAC Nos. MF0481 and MF0482) - Set 8 Project stage: RAI ML13178A2832013-06-25025 June 2013 Response to NRC Request for Additional Information Regarding the Reactor Vessel Internals Review of the License Renewal Application, Set 1 Project stage: Response to RAI ML13158A0162013-06-25025 June 2013 Requests for Additional Information for the Review of the Sequoyah Nuclear Plant, Units 1 and 2, License Renewal Application (TAC Nos. MF0481 and MF0482) Set 9 Project stage: RAI ML13190A2762013-07-0101 July 2013 Response to NRC Request for Additional Information Regarding the Review of the License Renewal Application, Set 4 Project stage: Response to RAI ML13192A3302013-07-0303 July 2013 Response to NRC Request for Additional Information Regarding the Review of License Renewal Application, Set 5 (TAC Nos. MF0481 and MF0482) Project stage: Response to RAI ML13204A3992013-07-11011 July 2013 Response to NRC Request for Additional Information Re Reactor Vessel Internals Review of the License Renewal Application, Set 6 Project stage: Response to RAI ML13213A0262013-07-25025 July 2013 Response to NRC Request for Additional Information Regarding the Review of License Renewal Application, Set 4/Buried Piping, Set 8, and Set 9 (TAC MF0481 and MF0482) Project stage: Response to RAI ML13213A0272013-07-29029 July 2013 Response to NRC Request for Additional Information Regarding the Review of License Renewal Application, Set 7 (TAC Nos. MF0481 and MF0482) Project stage: Response to RAI ML13213A0142013-07-30030 July 2013 Revised Response to NRC Request for Additional Information Regarding the Review of the License Renewal Application, Sets 1 and 3 (TAC MF0481 and MF0482) Project stage: Response to RAI ML13171A0362013-08-0101 August 2013 Summary of Telephone Conference Call Held on June 13, 2013, Between the NRC and Tennessee Valley Authority, Concerning RAI Pertaining to the Sequoyah Nuclear Plant, Units 1 and 2, LRA Project stage: RAI ML13204A2572013-08-0202 August 2013 Requests for Additional Information for the Review of the Sequoyah Nuclear Plant, Units 1 and 2, License Renewal Application (TAC Nos. MF0481 and MF0482) - Set 10 Project stage: RAI ML13225A3872013-08-0909 August 2013 Response to NRC Request for Additional Information Regarding the Review of the Sequoyah Nuclear Plant, Units I and 2, License Renewal Application, Sets 1, 6, 7, and Revised Responses for 1.4-2, 1.4-3 and 1.4-4 (TAC Nos. MF0481 and MF0482) Project stage: Response to RAI ML13224A1262013-08-22022 August 2013 RAI for Review of Sequoyah, Units 1 & 2 License Renewal Application - Set 11 Project stage: RAI ML13238A2442013-08-30030 August 2013 RAI Set 12 Project stage: RAI ML13252A0362013-09-0303 September 2013 Response to NRC Request for Additional Information Regarding the Review of the License Renewal Application, Set 10 (30-day), B.1.9-1, B.1.4-4 Revised RAI Responses and Revision to LRA Page 2.4-44 (TAC Nos. MF0481 and MF0482) Project stage: Response to RAI ML13226A3712013-09-10010 September 2013 Summary of Telephone Conference Call Held on August 1, 2013, Between the U.S. Nuclear Regulatory Commission and Tennessee Valley Authority, Concerning Requests for Additional Information Pertaining to the Sequoyah Nuclear Plant, Units 1 Project stage: RAI ML13267A1592013-09-20020 September 2013 Response to NRC Request for Additional Information Regarding the Review of the Sequoyah Nuclear Plant, Units 1 and 2, License Renewal Application, Set 11 (30-day), and Revised RAI Responses for B.1.14-1a, 2.5. Project stage: Response to RAI ML13247A4272013-09-23023 September 2013 Summary of Telephone Conference Call Held on August 19, 2013, Between the NRC and Tennessee Valley Authority, Concerning RAI Pertaining to the Sequoyah Nuclear Plant, Units 1 and 2, LRA Project stage: RAI ML13263A3382013-09-26026 September 2013 RAI Set 14 Project stage: RAI ML13268A4922013-09-27027 September 2013 RAI Set 15 Project stage: RAI ML13276A0182013-09-30030 September 2013 Response to NRC Request for Additional Information Regarding the Review of the License Renewal Application, Sets 10 (B.1.23-2a), 11 (4.1-8a), and 12 (30-day) Project stage: Response to RAI CNL-13-103, Response to NRC Request for Additional Information Regarding the Review of the Sequoyah Nuclear Plant, Units 1 and 2, License Renewal Application, Sets 8 (B.1.33-1), 10 (3.0.3-1 Request 1), 12 (B.1.23-2b), 13 (30-day), 14 (B.0.4-1a)2013-10-17017 October 2013 Response to NRC Request for Additional Information Regarding the Review of the Sequoyah Nuclear Plant, Units 1 and 2, License Renewal Application, Sets 8 (B.1.33-1), 10 (3.0.3-1 Request 1), 12 (B.1.23-2b), 13 (30-day), 14 (B.0.4-1a) Project stage: Response to RAI ML13282A3302013-10-18018 October 2013 RAI Set 16 Project stage: RAI CNL-13-104, Response to NRC Request for Additional Information Regarding the Review of License Renewal Application, Sets 11 (B.1.40-4a, B.1.25.1a), 13 (B.1.41-4a),14 (3.5.1-57, 3.5.1-87)2013-10-21021 October 2013 Response to NRC Request for Additional Information Regarding the Review of License Renewal Application, Sets 11 (B.1.40-4a, B.1.25.1a), 13 (B.1.41-4a),14 (3.5.1-57, 3.5.1-87) Project stage: Response to RAI CNL-13-105, Response to NRC Request for Additional Information Regarding Review of the License Renewal Application, Sets 10 (3.0.3-1, Requests 3, 4, 6), 12 (B.1.6-1b, B.1.6-2b), 16 (4.3.1-8a)2013-11-0404 November 2013 Response to NRC Request for Additional Information Regarding Review of the License Renewal Application, Sets 10 (3.0.3-1, Requests 3, 4, 6), 12 (B.1.6-1b, B.1.6-2b), 16 (4.3.1-8a) Project stage: Response to RAI CNL-13-106, Response to NRC Request for Additional Information Regarding the Review of the Sequoyah Nuclear Plant, Units I and 2, License Renewal Application, Sets 13 (B.1.34-5a), 15 (4.2-1a), 16 (B.1.23-2c), 17 (B.1.23-2d), LRA Sections A.1.34 and B2013-11-15015 November 2013 Response to NRC Request for Additional Information Regarding the Review of the Sequoyah Nuclear Plant, Units I and 2, License Renewal Application, Sets 13 (B.1.34-5a), 15 (4.2-1a), 16 (B.1.23-2c), 17 (B.1.23-2d), LRA Sections A.1.34 and B.1 Project stage: Response to RAI ML13323A0972013-12-0606 December 2013 RAI Set 18 Project stage: RAI CNL-13-130, Response to NRC Request for Additional Information Regarding the Review of the License Renewal Application, B.1.41-4b, 3.0.3-1 (Requests La, 3a, 4a, 6a), B.1.23-2e, 3.4.2.1.1-2a, Tables (3.4.1, 3.4.2-3-5, 3.3.1..2013-12-16016 December 2013 Response to NRC Request for Additional Information Regarding the Review of the License Renewal Application, B.1.41-4b, 3.0.3-1 (Requests La, 3a, 4a, 6a), B.1.23-2e, 3.4.2.1.1-2a, Tables (3.4.1, 3.4.2-3-5, 3.3.1.. Project stage: Response to RAI ML13353A5382013-12-23023 December 2013 RAI Set 19 Project stage: RAI ML13338A3332014-01-0808 January 2014 Summary of Telephone Conference Call Held on August 22, 2013, Between the U.S. Nuclear Regulatory Commission and Tennessee Valley Authority, Concerning Requests for Additional Information Pertaining to the Sequoyah Nuclear Plant, Units 1 an Project stage: RAI CNL-14-021, Response to Request for Clarification to NRC Request for Additional Information Re Review of License Renewal Application, LRA B.1.31, B.1.25.1b, B.1.34-8a, B.1.34-9A, LRA Annual Update (TAC MF0481 & MF0482)2014-03-0303 March 2014 Response to Request for Clarification to NRC Request for Additional Information Re Review of License Renewal Application, LRA B.1.31, B.1.25.1b, B.1.34-8a, B.1.34-9A, LRA Annual Update (TAC MF0481 & MF0482) Project stage: Supplement ML14059A3472014-03-0404 March 2014 Schedule Revision for the Review of the Sequoyah Nuclear Plant License Renewal Application (TAC Nos. MF0481 and MF0482) Project stage: Approval ML14063A5422014-03-0404 March 2014 TVA Response to Request for Clarification to NRC Request for Additional Information Regarding the Review of the Sequoyah Nuclear Plant, Units 1 and 2, License Renewal Application, LRA B.1.31, B.1.25.1 B, B.1.34-Sa, B.1.34-9a, LRA Annual ... Project stage: Supplement ML14064A4732014-03-12012 March 2014 Request for Additional Information for the Review of the Sequoyah Nuclear Plant, Units 1 and 2, LRA - Set 20 Project stage: RAI ML14094A2942014-04-11011 April 2014 Project Manager Change for the Safety Review of the Sequoyah Nuclear Plant, Units 1 & 2, License Renewal Application (TAC Nos. MF0481 & MF0482) Project stage: Approval CNL-14-052, TVA Response to NRC Request for Additional Information Regarding the Review of the Sequoyah Nuclear Plant, Units 1 and 2, License Renewal Application: RAIs B.1.13-4 and 3.0.3-1-3c, Commitment 9.G, and 2013 LRA Annual Update (TAC Nos. MF042014-04-22022 April 2014 TVA Response to NRC Request for Additional Information Regarding the Review of the Sequoyah Nuclear Plant, Units 1 and 2, License Renewal Application: RAIs B.1.13-4 and 3.0.3-1-3c, Commitment 9.G, and 2013 LRA Annual Update (TAC Nos. MF0481 Project stage: Response to RAI 2013-07-01
[Table View] |
|
---|
Category:Meeting Summary
MONTHYEARML24008A1592024-01-18018 January 2024 Summary of December 13, 2023, Meeting with Tennessee Valley Authority Regarding a Proposed Change to the Tennessee Valley Authority Nuclear Quality Assurance Plan ML23304A0682023-11-0606 November 2023 Summary of October 24, 2023, Public Mtg W/Tennessee Valley Authority Regarding Proposed License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2, and Sequoyah Nuclear Plant, Units 1 and 2 to Revise Function 5, Turbine Trip and F ML23142A2132023-05-22022 May 2023 Public Meeting Summary - 2022 Annual Assessment Meetings for Browns Ferry, Sequoyah and Watts Bar Nuclear Plants ML22312A3522022-12-0101 December 2022 Revised - Summary of Regulatory Audit for Alternative Request RV-02 ML22207B8302022-07-28028 July 2022 Summary of July 20, 2022, Observation Public Meeting with the Tennessee Valley Authority to Discuss Planned Alternative Request RP-12 to ASME OM Code Testing for the 1B-B Centrifugal Charging Pump at Sequoyah Nuclear Plant, Unit 1 ML22168A1642022-06-27027 June 2022 Summary of June 9, 2022, Meeting with TVA Regarding a Proposed License Amendment Request Related to Low Temperature Overpressure System and Cold Overpressure Mitigation System for Sequoyah and Watts Bar Nuclear Plants ML22109A0042022-04-20020 April 2022 Summary of Meeting with Tennessee Valley Authority Regarding a Proposed Alternative Request Related to Testing of the Motor-Driven Auxiliary Feedwater Pumps at Sequoyah and Watts Bar Nuclear Plants ML22108A1842022-04-18018 April 2022 TVA 2021 Annual Assessment Public Meeting Summary ML22048B7852022-03-0202 March 2022 Summary of February 16, 2022, Public Preapplication Meeting with Tennessee Valley Authority Regarding a Future Submittal of a Request for an Alternative to Requirements for Addressing Pressure Isolation Valve Leakage ML21313A3482021-11-18018 November 2021 Summary of Public Preapplication Meeting with Tennessee Valley Authority Regarding a Future Submittal of a License Amendment Request Regarding Seismic and Fire Probabilistic Risk Assessment (PRA) Modifications to 10 CFR 50.69 ML21291A0092021-11-0303 November 2021 Tennessee Valley Authority Fleet - Summary of October 13, 2021, Teleconference with Tennessee Valley Authority to Discuss Planned License Amendment Requests Related to the Emergency Action Level Scheme ML21265A5142021-10-12012 October 2021 Summary of September 15, 2021, Public Preapplication Meeting with Tennessee Valley Authority Regarding a Future Submittal of a License Amendment Request Regarding Elimination of the High Negative Flux Rate Trip ML21218A1472021-08-11011 August 2021 August 5, 2021 N-769 Relief Pre-Submittal Meeting Summary ML21165A1482021-06-30030 June 2021 Summary of Closed Meeting with Tennessee Valley Authority to Discuss Planned Requests for Exemption from Certain Requirements of 10 CFR Part 37 ML21152A1252021-06-0202 June 2021 Summary of Verbal Authorization of Alternative Request RP-10 for the 1B-B Motor Driven Auxiliary Feedwater Pump ML21137A0022021-05-17017 May 2021 Public Meeting Summary - Browns Ferry, Sequoyah and Watts Bar Nuclear Plants, Docket Nos. 50-259, 50-260, 50-296, 50-327, 50-328, 50-390, and 50-391, Meeting Number 20210392 ML21112A3262021-04-30030 April 2021 Summary of April 21, 2021, Teleconference with Tennessee Valley Authority to Discuss a Planned License Amendment Request for Sequoyah Nuclear Plant, Units 1 and 2 ML21067A2132021-03-23023 March 2021 Summary of March 2, 2021, Teleconference with Tennessee Valley Authority to Discuss a Planned Alternative Request ML20357A0092021-01-19019 January 2021 Summary of December 17, 2020, Teleconference with Tennessee Valley Authority Regarding Planned License Amendment Request Related to Use of Alternate Probability of Detection at Watts Bar Nuclear Plant, Unit 2 ML20293A0802020-10-28028 October 2020 Summary of October 13, 2020, Closed Meeting with TVA on Responses to Requests for Additional Information Updated Final Safety Analysis Report Hydrologic Analysis License Amendment Request ML20175A8012020-08-11011 August 2020 Summary of June 23, 2020, Public Meeting with Tennessee Valley Authority to Discuss a Planned License Amendment ML20203M2292020-08-11011 August 2020 July 16, 2020, Summary of Partially Closed Meeting with Tennessee Valley Authority to Discuss Responses to Requests for Additional Information Regarding Updated Final Safety Analysis Report Hydrologic Analysis License Amendment Request ML20197A2722020-07-15015 July 2020 2020 Beaver Valley, Calvert Cliffs, Limerick Peach Bottom, Susquehanna Annual Assessment Webinar Summary ML20108E9092020-06-22022 June 2020 Summary of April 16, 2020, Virtual Meeting with Tennessee Valley Authority to Discuss Submittal of an Exigent License Amendment Request Operate One Cycle with One Control Rod Removed ML20127H8412020-05-0606 May 2020 Public Meeting Summary - Browns Ferry, Sequoyah and Watts Bar Nuclear Plant, Meeting No. 20200384 ML20055C2312020-03-0505 March 2020 Summary of February 20, 2020 Pre-submittal Meeting - Operation Without Control Rod H8 and Fuel Transition ML20035C8192020-02-12012 February 2020 Summary of January 27, 2020, Public Meeting with Tennessee Valley Authority Regarding the Future Submittal of Steam Generator Tube Inspection Related License Amendment Request ML19325C7142019-12-0202 December 2019 November 15,2019, Summary of Conference Call with Tennessee Valley Authority to Discuss Submittal of Exigent License Request (EPID L-2019-LLA-0239) for Sequoyah Nuclear Plant, Unit 1 ML19142A2772019-05-21021 May 2019 Summary of Public Meeting - Sequoyah Nuclear Plant ML19038A4692019-02-28028 February 2019 Summary of January 31, 2019 Meeting with Tennessee Valley Authority Regarding Presubmittal Licensing Actions - ML18344A5672019-01-15015 January 2019 November 14, 2018, Summary of Public Meeting with Tennessee Valley Authority Regarding Presubmittal Licensing Actions - Sequoyah Nuclear Plant, Units 1 and 2 ML18164A3092018-06-13013 June 2018 June 6, 2018 Summary of Public Meeting - Sequoyah Nuclear Plant - Docket Nos. 50-327 and 50-328 ML17278A8972017-10-17017 October 2017 Summary of Meeting with TVA Regarding Hydrology-Related Licensing Actions, Browns Ferry, Units 1, 2, and 3, Sequoyah Nuclear, Units 1 and 2 and Watts Bar Nuclear Plant, Units 1 and 2(EPID L2016-TOP-0011; CAC Nos. MF8391-MF8397 ML17227A5142017-09-0101 September 2017 Summary of August 1, 2017, Pre-Submittal Public Meeting with TVA Regarding a Class 1E Unbalanced Voltage Relay Licensing Amendment Request for Browns Ferry Nuclear Plant, Sequoyah Nuclear Plant, and Watts Bar Nuclear Plant ML16280A2912016-10-31031 October 2016 September 23, 2016, Summary of Public Meeting with TVA Regarding Hydrology-Related Licensing Actions, Browns Ferry Nuclear Plant, Units 1, 2, and 3, Sequoyah Nuclear Plant, Units 1 & 2 and Watts Bar Nuclear Plant, Units 1 & 2 (CAC Nos. MF83 ML16117A5512016-05-0202 May 2016 04/01/2016 Sequoyah Nuclear Plant, Units 1 and 2 - Summary Of Public Meeting With TVA Regarding Hydrology-Related Licensing Actions (CAC Nos. ME9238 And ME9239) ML16035A4802016-02-12012 February 2016 Jsc Meeting Summary Attachment ML16029A3512016-02-0505 February 2016 Summary of January 19, 2016, Pre-Submittal Meeting with Tennessee Valley Authority Regarding Technical Specifications for Sequoyah Nuclear Plant, Units 1 and 2 ML15238A3422015-09-22022 September 2015 July 22, 2015 Summary of Telecon Between NRC and TVA, Concerning RAI Set 25 Pertaining to SQN, Units 1 and 2 License Renewal Application ML15233A0352015-09-22022 September 2015 July 20, 2015, Summary of Telephone Conference Call Held Between NRC and TVA Concerning RAI, Set 25 Pertaining to the Sequoyah Units 1 and 2 License Renewal Application (TAC Nos. MF0481 and MF0482) ML15236A0672015-09-0909 September 2015 August 20, 2015 Summary of Telephone Conference Call Held Between the U.S. NRC and TVA ML15152A0312015-06-23023 June 2015 Summary of Telephone Conference Call Held on May 13, 2015, Between the U.S. NRC and TVA, Concerning RAI, Set 24 Pertaining to the Sequoyah Nuclear Plant License Renewal Application ML15106A5462015-04-15015 April 2015 Meeting Summary with Public to Discuss Annual Assessment of Sequoyah Nuclear Plant, Unit 1 & 2, in Soddy Daisy, Tn ML15037A1732015-02-13013 February 2015 Summary of January 15, 2015, Meeting with Tennessee Valley Authority Regarding Improved Technical Specifications Conversion for Sequoyah Nuclear Plant, Units 1 and 2 ML14204A2672014-08-15015 August 2014 Summary of July 10, 2014, Meeting Between the Tennessee Valley Authority and the Nuclear Regulatory Commission to Discuss Near-Term Task Force Recommendation 2.1 Flooding Hazard Reevaluation Report and Improved Mitigation System Quarterly U ML14197A6082014-08-0606 August 2014 July 1, 2014, Summary of Category 1 Public Meeting with Tennessee Valley Authority to Discuss Seismic Hazard Reevaluations Associated with Implementation of Japan Lessons-Learned Near-Term Task Force Recommendation 2.1 ML14174A7372014-07-30030 July 2014 June 19, 2014, Summary of Telephone Conference Call Held Between NRC and Tennessee Valley Authority, Concerning Requests for Additional Information Pertaining to the Sequoyah, Units 1 & 2, License Renewal Application ML14107A3352014-04-16016 April 2014 Summary of Meeting with Tennessee Valley Authority to Discuss Nrc'S Reactor Oversight Process (ROP) and Nrc'S Annual Assessment of Plant Safety Performance for Period of January 1, 2013, to December 31, 2013 for Sequoyah Bar Nuclear Plant ML14090A4582014-03-31031 March 2014 Public Meeting Summary TVA Synergy Safety Culture Survey Results ML14049A3372014-02-18018 February 2014 2/4/2014 - Summary of Public Meeting for Sequoyah Nuclear Plant, Docket No. 50-327, and 50-328 2024-01-18
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 23, 2015 LICENSEE: Tennessee Valley Authority FACILITY: Sequoyah Nuclear Plant, Units 1 and 2
SUBJECT:
SUMMARY
OF TELEPHONE CONFERENCE CALL HELD ON MAY 13, 2015, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND TENNESSEE VALLEY AUTHORITY, CONCERNING REQUESTS FOR ADDITIONAL INFORMATION, SET 24 PERTAINING TO THE SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION (TAC NOS. MF0481 AND MF0482)
The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Tennessee Valley Authority (TVA or the applicant) held a telephone conference call on May 13, 2015, to discuss and clarify the staffs draft requests for additional information (DRAIs) provided in concerning the Sequoyah Nuclear Plant, Units 1 and 2, license renewal application.
The telephone conference call was useful in clarifying the intent of the staffs DRAIs. provides a listing of the participants and Enclosure 2 contains the DRAIs discussed with the applicant, including a brief description on the status of the items.
The applicant had an opportunity to comment on this summary.
Sincerely,
/RA by Phyllis Clark for/
Emmanuel Sayoc, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-327 and 50-328
Enclosures:
- 1. List of Participants
- 2. Summary of Telephone Conference Call cc: Listserv
June 23, 2015 LICENSEE: Tennessee Valley Authority FACILITY: Sequoyah Nuclear Plant, Units 1 and 2
SUBJECT:
SUMMARY
OF TELEPHONE CONFERENCE CALL HELD ON MAY 13, 2015, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND TENNESSEE VALLEY AUTHORITY, CONCERNING REQUESTS FOR ADDITIONAL INFORMATION, SET 24 PERTAINING TO THE SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION (TAC NOS. MF0481 AND MF0482)
The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Tennessee Valley Authority (TVA or the applicant) held a telephone conference call on May 13, 2015, to discuss and clarify the staffs draft requests for additional information (DRAIs) provided in concerning the Sequoyah Nuclear Plant, Units 1 and 2, license renewal application.
The telephone conference call was useful in clarifying the intent of the staffs DRAIs. provides a listing of the participants and Enclosure 2 contains the DRAIs discussed with the applicant, including a brief description on the status of the items.
The applicant had an opportunity to comment on this summary.
Sincerely,
/RA by Phyllis Clark for/
Emmanuel Sayoc, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-327 and 50-328
Enclosures:
- 1. List of Participants
- 2. Summary of Telephone Conference Call cc: Listserv DISTRIBUTION:
See next page ADAMS Accession Number: ML15152A031 *Concurred via e-mail OFFICE LA:DLR* PM:RPB1:DLR PM:RPB1:DLR* BC:RPB1:DLR PM:RPB1:DLR NAME YEdmonds PClark JDaily YDiaz-Sanabria PClark DATE 6/10/15 6/ 23 /15 6/ 23 /15 6/ 23 /15 6/ 23 /15 OFFICIAL RECORD COPY
Memo to Tennessee Valley Authority from E. Sayoc dated June 23, 2015
SUBJECT:
SUMMARY
OF TELEPHONE CONFERENCE CALL HELD ON MAY 13, 2015, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND TENNESSEE VALLEY AUTHORITY, CONCERNING REQUESTS FOR ADDITIONAL INFORMATION, SET 24 PERTAINING TO THE SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION (TAC NOS. MF0481 AND MF0482)
DISTRIBUTION:
HARD COPY:
DLR RF E-MAIL:
PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRerb Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrPMSequoyah Ressource
beth.mizuno@nrc.gov jeremy.wachutka@nrc.gov john.pelchat@nrc.gov gena.woodruff@nrc.gov siva.lingam@nrc.gov wesley.deschaine@nrc.gov galen.smith@nrc.gov scott.shaeffer@nrc.gov jeffrey.hamman@nrc.gov craig.kontz@nrc.gov caudle.julian@nrc.gov generette.lloyd@epa.gov gmadkins@tva.gov clwilson@tva.gov ekwest@tva.govdllundy@tva.gov
TELEPHONE CONFERENCE CALL SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS MAY 13, 2015 PARTICIPANTS AFFILIATION Jeffrey Mitchell U.S. Nuclear Regulatory Commission (NRC)
Yoira Diaz-Sanabria NRC Dennis Morey NRC Allen Hiser NRC Seung Min NRC James Medoff NRC Bart Fu NRC Ganesh Cheruvenki NRC Erin Henderson Tennessee Valley Authority (TVA)
Don Goodin TVA William Pierce TVA Michael Henderson TVA Terry Woods TVA Christopher Reneau TVA Gawatha Haliburton TVA Tom Hess TVA Mike McBearty TVA ENCLOSURE 1
SUMMARY
OF TELEPHONE CONFERENCE CALL SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION MAY 13, 2015 The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Tennessee Valley Authority (TVA or the applicant) held a telephone conference call on May 13, 2015, to discuss and clarify the following draft requests for additional information (DRAIs) concerning the Sequoyah Nuclear Plant, Units 1 and 2 license renewal application (LRA).
DRAI B.1.35-2
Background:
In a teleconference call held on April 30, 2015, the applicant indicated that during the Cycle 19 refueling outage (November 2013) at Sequoyah Unit 1, the surveillance capsule at location S was relocated to a high neutron flux region, location T, to support reactor vessel surveillance for license renewal. The applicant indicated that this capsule relocation is consistent with the applicants plan for surveillance capsule withdrawal for license renewal, as described in the applicants letter dated January 10, 2013, and as approved by the staff in its letter dated September 27, 2013.
The applicant further indicated that during the Cycle 20 refueling outage (April 2015) it discovered that the Unit 1 surveillance capsule at location T had been ejected from the surveillance capsule basket. In addition, the applicant indicated that the capsule had broken apart during the last cycle and that the surveillance specimens are no longer useable.
Issue:
The staff noted that the applicant had a capsule withdrawal schedule that would withdraw the Unit 1 capsule at location T during the Cycle 28 refueling outage. Since the capsule was lost, the staff needs additional information to determine the adequacy of the applicants Reactor Vessel Surveillance Program.
Request:
- 1. In order to demonstrate the adequacy of the Reactor Vessel Surveillance Program for license renewal, describe the applicants new plan for surveillance capsule withdrawal now that the Unit 1 capsule at location T is not available.
- 2. Describe corrective actions to prevent similar events impacting the availability of reactor vessel surveillance capsules for withdrawal.
Discussion:
The applicant stated that the above requests would be addressed in a letter to be submitted to the NRC within one week of the date of this telecon. Therefore, the staff determined there is no ENCLOSURE 2
immediate need to issue this Request for Additional Information (RAI). If the letter does not completely address this RAI, the staff will issue a revised RAI in the future.
DRAI B.1.34-10
Background:
The applicants Reactor Vessel Internals (RVI) aging management program (AMP) is given in LRA Section B.1.34 and uses the sample-based inspection and evaluation (I&E) methodology for Westinghouse-designed pressurized water reactors (PWRs) described in EPRI Report MRP-227-A.
During the spring 2015, refueling outage for Sequoyah Unit 1, the applicant determined that two reactor vessel (RV) surveillance capsules had fallen from their surveillance capsule holders and were sufficiently damaged such that a number of capsule parts and surveillance capsule specimens were released as loose parts into the lower plenum region of the reactor vessel.
Issue:
The sampling based I&E methodology in MRP-227-A is predicated on the assumptions that reactor internals assessed in the MRP-191 report are not degraded. The staff needs further demonstration that the loose parts in Sequoyah Unit 1, have not caused damage to these RVI components such that the assumptions for MRP-227-A are still valid for the period of extended operation. Otherwise, if damage has occurred to the reactor internals, the staff will need assessment of its impact on the assumptions that were used to develop the MRP-227-A based inspection plan for reactor internals at Sequoyah Unit 1.
Request:
- 1. For all RVI components inspected during the spring 2015 refueling outage, identify the type of inspection, inspection method, sample size, and summarize the inspection results including any damage to the components.
- 2. Clarify whether the augmented inspection and evaluation methods that apply to the components in MRP-227-A will remain valid and bounding for the RVI components at Sequoyah Unit 1.
- 3. Clarify how applicable inspection and evaluation methods will be adjusted if the bases in MRP-227-A will not remain bounding for Sequoyah Unit 1, during the period of extended operation.
Discussion:
The applicant stated that the above requests would be addressed in a letter to be submitted to the NRC within two weeks of the telecon. Therefore, the staff determined there is no immediate need to issue this RAI. If the letter does not completely address this RAI, the staff will issue a revised RAI in the future.