SUBJECT:

SEQUOYAH, UNITS 1 AND 2 - INTEGRATED INSPECTION REPORT 05000327/2023003 AND 05000328/2023003

Dear Jim Barstow:

On September 30, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Sequoyah, Units 1 and 2. On October 10, 2023, the NRC inspectors discussed the results of this inspection with Mr. Tom Marshall and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Louis J. McKown, II, Chief Reactor Projects Branch 5 Division of Reactor Projects Docket Nos. 05000327 and 05000328 License Nos. DPR-77 and DPR-79

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000327 and 05000328

License Numbers:

DPR-77 and DPR-79

Report Numbers:

05000327/2023003 and 05000328/2023003

Enterprise Identifier:

I-2023-003-0036

Licensee:

Tennessee Valley Authority

Facility:

Sequoyah, Units 1 and 2

Location:

Soddy Daisy, TN 37379

Inspection Dates:

July 01, 2023, to September 30, 2023

Inspectors:

D. Hardage, Senior Resident Inspector

A. Price, Senior Resident Inspector

S. Ninh, Senior Project Engineer

Approved By:

Louis J. McKown, II, Chief

Reactor Projects Branch 5

Division of Reactor Projects

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Sequoyah, Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

PLANT STATUS

Unit 1 operated at or near rated thermal power (RTP) for the entire inspection period.

Unit 2 operated at or near RTP for the entire inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed activities described in IMC 2515, Appendix D, Plant Status, observed risk significant activities, and completed on-site portions of IPs. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (3 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1) Unit 1 emergency core cooling system (ECCS) lineup in the Main Control Room (MCR) during maintenance on centrifugal charging pump (CCP) 1B and Unit 2 ECCS lineup in the MCR following maintenance on CCP 2B on July 26, 2023.
(2) Essential raw cooling water (ERCW) valves servicing Unit 1 Train B safety related equipment during 1A CCP and 1A residual heat removal system (RHR) pump maintenance on August 2, 2023.
(3) Vital Battery V alignment to Battery Board IV during Vital Battery I surveillance testing on August 29, 2023.

71111.05 - Fire Protection

Fire Area Walkdown and Inspection Sample (IP Section 03.01) (5 Samples)

The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:

(1) Unit 1 and Unit 2 Auxiliary Building, Elevation 734 and 759 on July 05, 2023
(2) Unit 1 and Unit 2 Auxiliary Building, Elevation 669 on July 16, 2023
(3) Unit 1 and Unit 2 Auxiliary Building, Elevation 714 on August 10, 2023
(4) Unit 1 and Unit 2 Auxiliary Building, Elevation 734 Electrical Board Rooms on August 16, 2023
(5) Unit 1 and Unit 2 Auxiliary Building, Elevation 749 Electrical Board, Battery, &

Transformer Rooms on September 6, 2023

71111.06 - Flood Protection Measures

Flooding Sample (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated external flooding mitigation protections in the ERCW intake pumping station on July 12, 2023

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)

(1) The inspector observed and evaluated licensed operator performance in the main control room during unplanned 2A component cooling water pump outage including Rod Pattern Adjustment on July 25-26, 2023.

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

(1) The inspectors observed and evaluated a simulator training scenario including a ruptured steam generator on August 21, 2023.

71111.12 - Maintenance Effectiveness

Maintenance Effectiveness (IP Section 03.01) (2 Samples)

The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:

(1) Maintenance rule preventable functional failure of K-A ERCW pump due to overcurrent trip (CDE 3184) on July 19, 2023
(2) Maintenance rule functional failure of Unit 2 B Train Emergency Gas Treatment Air Cleanup due to failed damper mechanical interlock linkage (CDE 3210) on August 9, 2023

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (6 Samples)

The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:

(1) Week of July 17-21, 2023, including protected equipment reviews for scheduled maintenance on 2A motor-driven auxiliary feedwater (MDAFW) pump on July 17, 2023, and during emergent maintenance due to the failure of 1A-A 669 Penetration Room Cooler and on U1 Power Cabinet SCD (Shutdown Banks C and D) due to Rod Control Urgent Failure Alarm with U1 Rod Control in manual on July 19, 2023.
(2) Unit 1 and 2, week of July 30 - August 5, 2023, including protection equipment reviews for scheduled maintenance on the 1A CCP, 1A safety injection pump, and 1A RHR pump.
(3) Unit 1 and 2, week of August 7-11, 2023, including protected equipment reviews for scheduled maintenance on 120V Vital Inverter 0-IV and entry into AOP-N.02 Tornado Watch.
(4) Unit 1 and 2, week of August 27 - September 2, 2023, including protected equipment reviews for dry cask loading operations and scheduled maintenance on vital battery charger I and auxiliary air compressor A.
(5) Week of September 11-15, 2023, including protected equipment reviews for the cutout and replacement of the 1A CCP Discharge Check Valve and review of the associated Risk-Informed Completion Time (RICT) requirements on September 14, 2023.
(6) Week of September 18-22, 2023, including protected equipment reviews for the unplanned 1B emergency diesel generator (EDG) outage and review of the associated RICT requirements on September 27, 2023.

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 03.01) (6 Samples)

The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:

(1) Potential AFW design vulnerability on July 7, 2023.

(2)1B Charging pump increased balance drum flow on July 28, 2023.

(3)1A1/1A2 component cooling system heat exchangers fouling limit exceeded on August 1, 2023.

(4) U2 Post accident sampling system: Documentation of being outside of current licensing basis on August 11, 2023.
(5) Challenge to operability of the 1A CCP if left in a standby condition for an extended period of time based on the voiding upstream of 1-CHK-62-525 on August 22, 2023.
(6) Site response to emergent failure of 1B EDG, including the common cause failure and extent of condition analysis for EDGs 1A, 2A, 2B on September 29, 2023.

71111.18 - Plant Modifications

Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (1 Sample)

The inspectors evaluated the following temporary or permanent modifications:

(1) DEC SQN-19-885, 6.9kV ITE Breaker Replacement Equivalency on July 14, 2023

71111.24 - Testing and Maintenance of Equipment Important to Risk

The inspectors evaluated the following testing and maintenance activities to verify system operability and/or functionality:

Post-Maintenance Testing (PMT) (IP Section 03.01) (6 Samples)

(1) Work Order (WO) 123852417, Replace failed 2-PX-98-6002, single point vulnerability for steam generator level control on July 13, 2023
(2) WO 123093811, Calibrate CCP 2B-B Aux Oil Pump control switches on July 26, 2023
(3) WO 123630250, Replace safety injection pump 1A-A breaker control device on July 31, 2023
(4) WO 123190039, 2-SI-SXP-074-201.B RHR Pump 2B XI Test on August 23, 2023
(5) WO 1123202367, Perform bridge and megger test of component cooling water pump 1B on September 6, 2024
(6) WO 124018372, EDG 1B 24hr Run following EDG 1B unplanned outage on September 27, 2023.

Surveillance Testing (IP Section 03.01) (3 Samples)

(1)0-SI-OPS-092-078.0, Unit 2 Power Range Neutron Flux Channel Calibration by Heat Balance Comparison, on July 12, 2023

(2) WO 123125058, U1 Calibration of Power Range Nuclear Instrumentation Systems following In/Excore Detector Calibration on August 17, 2023
(3) WO 123125097, EDG 1A 24hr Run and Load Rejection Test on September 13,

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

MS05: Safety System Functional Failures (SSFFs) Sample (IP Section 02.04)===

(1) Unit 1 (July 1, 2022, through June 30, 2023)
(2) Unit 2 (July 1, 2022, through June 30, 2023)

MS06: Emergency AC Power Systems (IP Section 02.05) (2 Samples)

(1) Unit 1 (July 1, 2022, through June 30, 2023)
(2) Unit 2 (July 1, 2022, through June 30, 2023)

MS07: High Pressure Injection Systems (IP Section 02.06) (2 Samples)

(1) Unit 1 (July 1, 2022, through June 30, 2023)
(2) Unit 2 (July 1, 2022, through June 30, 2023)

MS08: Heat Removal Systems (IP Section 02.07) (2 Samples)

(1) Unit 1 (July 1, 2022, through June 30, 2023)
(2) Unit 2 (July 1, 2022, through June 30, 2023)

MS09: Residual Heat Removal Systems (IP Section 02.08) (2 Samples)

(1) Unit 1 (July 1, 2022, through June 30, 2023)
(2) Unit 2 (July 1, 2022, through June 30, 2023)

MS10: Cooling Water Support Systems (IP Section 02.09) (2 Samples)

(1) Unit 1 (July 1, 2022, through June 30, 2023)
(2) Unit 2 (July 1, 2022, through June 30, 2023)

71152A - Annual Follow-up Problem Identification and Resolution Annual Follow-up of Selected Issues (Section 03.03)

The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:

(1) Approximately 6 seconds of gas was vented from 1A RHR discharge piping on September 6, 2023.
(2) Seal Injection Flow Lost on Unit 2 during seal injection filter swap on September 11,

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On October 10, 2023, the inspectors presented the integrated inspection results to Mr.

Tom Marshall and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.04

Procedures

0-SO-250-1

25 Volt DC Vital Power System

Revision 87

71111.04

Procedures

1-PI-OPS-000-020.1

Operator at the Controls Duty Station Checklists Modes

1-4

Revision 82

71111.04

Procedures

1-SI-OPS-067-033.B

ERCW Valves Servicing Train B Safety Related

Equipment

Revision 16

71111.04

Procedures

2-PI-OPS-000-022.1

Operator at the Controls Duty Station Checklists Modes

1-4

Revision 73

71111.05

Fire Plans

AUX-0-669-01

Fire Protection Pre-Fire Plans Auxiliary Building - El. 669

(Unit 1 side)

Revision 8

71111.05

Fire Plans

AUX-0-669-02

Fire Protection Pre-Fire Plans Auxiliary Building - El. 669

(Unit 2 side)

Revision 13

71111.05

Fire Plans

AUX-0-669-03

Fire Protection Pre-Fire Plans Auxiliary Building - El. 669

(Common Area U-X)

Revision 8

71111.05

Fire Plans

AUX-0-714-01

Fire Protection Pre-Fire Plans

Auxiliary Building - El. 714 (Col. A1-15, Q-U)

Revision 11

71111.05

Fire Plans

AUX-0-714-02

Fire Protection Pre-Fire Plans

Auxiliary Building - El. 714

(Col. U-X and U1 & U2 Additional Equip. Builds.)

Revision 9

71111.05

Fire Plans

AUX-0-734-01

Fire Protection Pre-Fire Plans Auxiliary Building,

Electrical Board Rooms (El. 734 Unit 1 Side)

Revision 10

71111.05

Fire Plans

AUX-0-734-02

Fire Protection Pre-Fire Plans Auxiliary Building,

Electrical Board Rooms (El. 734 Unit 2 Side)

Revision 10

71111.05

Fire Plans

AUX-0-734-03

Fire Protection Pre-Fire Plans Auxiliary Building - El. 734

(U-X)

Revision 9

71111.05

Fire Plans

AUX-0-749-01

Fire Protection Pre-Fire Plans Auxiliary Building (El. 749

Unit 1 Side, Electrical Board, Battery, & Transformer

Rooms)

Revision 13

71111.05

Fire Plans

AUX-0-749-02

Fire Protection Pre-Fire Plans Auxiliary Building (El. 749

Unit 2 Side, Electrical Board, Battery, & Transformer

Rooms)

Revision 14

71111.05

Fire Plans

AUX-0-759-01

Fire Protection Pre-Fire Plans Auxiliary Building (El. 759

Unit 1 Side)

Revision 6

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.05

Fire Plans

AUX-0-759-02

Fire Protection Pre-Fire Plans Auxiliary Building (El. 759

Unit 2 Side)

Revision 6

71111.06

Procedures

0-FP-MXX-000-016.0

Flood Preparation - Sealing ERCW Building Deck Drain

Revision 8

71111.06

Procedures

0-FP-MXX-000-017.0

Flood Preparation - Installation of Door Flood Barriers at

Diesel Generator Building and ERCW Pumping Station

Revision 1

71111.06

Procedures

AOP-N.03

External Flooding

Revision 62

71111.11Q

Procedures

0-PI-NXX-085-001.0

Resetting Control Rod Fully Withdrawn Position

Revision 31

71111.11Q

Procedures

OPDP-1

Conduct of Operations

Revision 54

71111.12

Corrective Action

Documents

CR 1794551

ERCW pump K-A tripped during end-device test

08/05/2022

71111.12

Corrective Action

Documents

CR 1794752

ERCW pump K-A tripped

08/07/2022

71111.12

Corrective Action

Documents

CR 1795140

Prompt investigation for K-A ERCW motor terminations

08/09/2022

71111.12

Corrective Action

Documents

CR 1796229

Develop standard for positive cable restraint inside

junction box

08/14/2022

71111.12

Corrective Action

Documents

CR 1841617

"B" Train EGTS Pressure Control Malfunction

03/12/2023

71111.12

Miscellaneous

Cause Determination

Evaluation (CDE)

210

B Train EGTS Pressure Control Malfunction

03/12/2023

71111.13

Corrective Action

Documents

CR 1868966

PCR: 0-GO-16, System Operability Checklists

07/19/23

71111.13

Corrective Action

Documents

Resulting from

Inspection

CR 1882253

GO-16 protected equipment recommendations should

specify protecting local equipment (ie. room doors).

09/25/2023

71111.13

Miscellaneous

NPG-SPP-01.12-6

Prompt Investigation Report - 1B Emergency Diesel

Generator Failure

09/21/2023

71111.13

Miscellaneous

NPG-SPP-09.11.4-1

SQN-RICT-23-DA001

PRA Availability Determination

09/24/2023

71111.13

Miscellaneous

SO-23-031

1A CCP Risk Informed Completion Time

09/17/2023

71111.13

Miscellaneous

SO-23-033

1B EDG Risk Informed Completion Time

Revision 3

71111.13

Procedures

0-GO-16

System Operability Checklist

Revision 35

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.13

Procedures

NPG-SPP-07.3-2

High Risk Management Plan

08/2/22

71111.13

Procedures

NPG-SPP-07.3-2

High Risk Management Plan for WO 122554918

08/10/2022

71111.13

Procedures

NPG-SPP-09.11.4

Risk-Managed Technical

Specifications Program

Revision 1

71111.15

Corrective Action

Documents

CR 1852461

1B Charging Pump Balance Drum increased flow

04/25/2023

71111.15

Corrective Action

Documents

CR 1865129

Potential AFW design vulnerability

06/28/23

71111.15

Corrective Action

Documents

CR 1870665

1B CCP continues to have increased balance drum flow

07/26/2023

71111.15

Corrective Action

Documents

CR 1871876

1A1/1A2 CCS heat exchangers fouling limit exceeded

08/01/2023

71111.15

Corrective Action

Documents

CR 1873251

U2 Post accident sampling system: Documentation of

being outside of current licensing basis

08/08/2023

71111.15

Corrective Action

Documents

CR 1881328

Unit 1 received unexpected alarms resulting in

emergency stopping 1B DG

09/19/2023

71111.15

Miscellaneous

ACMP SO-23-21

1A1/1A2 CCS Hx fouling

08/03/2023

71111.15

Operability

Evaluations

EDG 1B Failure common cause evaluation

09/19/2023

71111.15

Operability

Evaluations

PDO for CR 1875562

Prompt Determination of Operability Documentation for

CR 1875562,

Challenge to operability of the 1A CCP if left in a

standby condition.

08/21/2023

71111.18

Calculations

SQN-E3-002

Diesel Generator Loading Analysis

Revision 74

71111.18

Corrective Action

Documents

CR 1829837

Inadequate 50.59 for breaker design change

01/18/2023

71111.18

Corrective Action

Documents

CR 1835666

Breaker modification potentially impacts D/G testing

03/08/2023

71111.24

Corrective Action

Documents

CR 1880528

Data taking during 1-SI-OPS-082-024.A DG 1A 24 Hr

Run

09/14/2023

71111.24

Procedures

0-PI-IXX-092-N45.0

Calibration of Power Range Nuclear Instrumentation

System Following Incore/Excore Detector Calibration

Revision 43

71111.24

Procedures

1-SI-OPS-082-024.A

1A-A D/G 24 Hour Run And Load Rejection Testing

Revision 42

71111.24

Procedures

1-SI-SXP-070-201.B

Component Cooling Pump 1B-B Performance Test

Revision 14

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.24

Procedures

2-SI-SXP-062-201.B

Centrifugal Charging Pump 2B-B Performance Test

Revision 28

71111.24

Procedures

2-SI-SXP-074-201.B

2-SI-SXP-074-201.B RHR Pump 2B XI Test

Revision 20

71111.24

Work Orders

WO 123125058

0-PI-IXX-092-N45.0 U1 Cal Pwr Range NIS Following

In/Excore Detector Cal

08/17/2023

71111.24

Work Orders

WO 123125097

DG 1A 24hr Run And Load Reject Test

09/12/2023

71111.24

Work Orders

WO 123190039

2-SI-SXP-074-201.B RHR Pump 2B XI Test

08/23/2023

71111.24

Work Orders

WO 124018372

EDG 1B 24 hr run following EDG 1B unplanned outage

09/27/2023

71151

Corrective Action

Documents

Resulting from

Inspection

CR 1884441

NRC identified incorrect Jan. 2023 U2 A Train MDAFWP

planned unavailability

10/04/2023

71151

Miscellaneous

MSPI Derivation Reports (UAI, URI, PLE) - Unit 1 and

Unit 2 Residual Heat Removal Systems (July 1, 2022 -

June 30, 2023)

71151

Miscellaneous

MSPI Derivation Reports (UAI, URI, PLE) - Unit 1 and

Unit 2 Cooling Water Support Systems (July 1, 2022 -

June 30, 2023)

71151

Miscellaneous

MSPI Derivation Reports (UAI, URI, PLE) - Unit 1 and

Unit 2

Emergency AC System (July 1, 2022 - June 30, 2023)

71151

Miscellaneous

MSPI Derivation Reports (UAI, URI, PLE) - Unit 1 and

Unit 2

High Pressure Injection System (July 1, 2022 - June 30,

23)

71151

Miscellaneous

MSPI Derivation Reports (UAI, URI, PLE) - Unit 1 and

Unit 2 Heat Removal Systems (July 1, 2022 - June 30,

23)

71152A

Calculations

MDQ00006320100240

Calculation of Effects of Gas Accumulation in ECCS

Piping

Revision 3

71152A

Corrective Action

Documents

CR 1868981

Seal Injection Flow Lost on Unit 2 during seal injection

filter swap

07/19/2023

71152A

Corrective Action

Documents

CR 1875398

Almost six seconds of gas was vented from 'A' RHR

discharge piping

08/18/2023

71152A

Miscellaneous

Operator 4.0 Critique

RCP seal water injection flow was inadvertently isolated

07/19/2023

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

for CR 1868981

twice.