ML14262A330

From kanterella
Jump to navigation Jump to search
9/16/2014 Meeting Slide for Sequoyah Nuclear Plant, Units 1 and 2 Regarding AST Presentation
ML14262A330
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 09/16/2014
From:
Tennessee Valley Authority
To:
Office of Nuclear Reactor Regulation
Hon A DORL/LPL2-2 301-415-8480
References
Download: ML14262A330 (17)


Text

ASTPresentation September16,2014 Nuclear SequoyahNuclearPlant (SQN)

TVA Nuclear Power Group 2

Introduction Introduction Purpose of Meeting

  • Discussion of AST as it pertains to RAI KAB-044

- Current Licensing Bases

- Improved Technical Specification Impact

Introductions

  • NRC

TVA Nuclear Power Group 3

Current Licensing Bases Current Licensing Bases

  • TVA-SQN-TS-02-08 submitted to NRC, January 14, 2003

- Request to modify TS 3.9.4 Containment Building Penetrations and Partial scope implementation of the alternate source term

- Modified applicability requirement for the containment building equipment door (CBED)

- CBED closure only required during recently irradiated fuel

  • NRC approval received on October 28, 2003

TVA Nuclear Power Group 4

Current Licensing Basis Current Licensing Basis Current wording for T/S 3.9.4

TVA Nuclear Power Group 5

Current Licensing Basis Current Licensing Basis

  • TVA and NRC recognized that the Fuel Handling Accident (FHA) within containment is the only Design Basis Accident (DBA) affected by the proposed change
  • TVA evaluated a FHA both inside and outside containment
  • NRC found that the change to replace the current accident source term used in the design basis FHA within containment with an AST was acceptable

TVA Nuclear Power Group 6

Current Licensing Basis Current Licensing Basis Excerpt from NRC SE

TVA Nuclear Power Group 7

Current Licensing Basis Current Licensing Basis Excerpt from NRC SE

TVA Nuclear Power Group 8

Current Licensing Basis Current Licensing Basis

  • Analysis done for the FHA with AST assumes that the CBED is open and that ABGTS is out of service (no filtration of releases)
  • TVA revised some of the assumptions in the FHA Analysis of Record (AOR) in June of 2013

- Changed the time of the CVI from 30 to 300 seconds

- Changed the containment air volume for mixing from 5% to 50%

- Change was done under 10 CFR 50.59

- Consequences to the FHA decreased by ~7%

TVA Nuclear Power Group 9

Current Licensing Basis Current Licensing Basis

  • Analysis done for the FHA with AST assumes that the CBED is open and that ABGTS is out of service (no filtration of releases)
  • TVA revised some of the assumptions in the FHA Analysis of Record (AOR) in June of 2013

- Changed the time of the CVI from 30 to 300 seconds

- Changed the containment air volume for mixing from 5% to 50%

- Change was done under 10 CFR 50.59

- Consequences to the FHA decreased by ~7%

TVA Nuclear Power Group 10 Current Licensing Basis Current Licensing Basis

TVA Nuclear Power Group 11 Current Licensing Basis Current Licensing Basis

TVA Nuclear Power Group 12 Current Licensing Basis Current Licensing Basis

TVA Nuclear Power Group 13 Improved Tech Spec Impact Improved Tech Spec Impact

  • Four T/S were changed in this conversation by changing the APPLICABILITY from During movement of irradiated fuel to During movement of recently irradiated fuel

- 3.3.6 Containment Ventilation Isolation Instrumentation

- 3.3.8 Auxiliary Building Gas Treatment System Actuation Instrumentation

- 3.7.12 Auxiliary Building Gas Treatment System

- 3.9.4 Containment Penetrations

TVA Nuclear Power Group 14 Improved Tech Spec Impact Improved Tech Spec Impact

  • 3.3.6 Containment Ventilation Isolation Instrumentation

TVA Nuclear Power Group 15 Improved Tech Spec Impact Improved Tech Spec Impact

TVA Nuclear Power Group 16 Improved Tech Spec Impact Improved Tech Spec Impact

TVA Nuclear Power Group 17 Improved Tech Spec Impact Improved Tech Spec Impact