ML21111A020
| ML21111A020 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 04/21/2021 |
| From: | Tennessee Valley Authority |
| To: | Division of Operating Reactor Licensing |
| References | |
| EPID L-2021-LRM-0041 | |
| Download: ML21111A020 (12) | |
Text
License Amendment Request Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times -
RITSTF Initiative 4b April 21, 2021
Agenda
- Describe future license amendment request (LAR)
Scope of the Request Variations from TSTF-505 PRA Models and CRMP Summary
- LAR Schedule
- Summary
- Questions/Comments?
2
Scope of the Request
- LAR is based on TSTF-505, Revision 2, and NEI 06-09, Risk-Informed Technical Specifications Initiative 4b, Risk-Managed Technical Specifications (RMTS)
Guidelines
- Applicable in Modes 1 and 2
- No loss of function consistent with template
- New TS 5.5 program called the Risk Informed Completion Time Program
- LAR informed by approved precedent and those currently under review 3
Variations Several types of administrative variations are taken Required Actions (RAs) with different numbering and slightly different wording with same intent TSTF-505 RAs that SQN TS does not have Instrumentation RAs invoked for different Functions RICTs not applied since Additional Justifications werent met (e.g., not having a Shutdown PRA)
Miscellaneous site-specific formatting changes 4
Variations (continued)
Five technical variations are being taken SQN Instrumentation RAs that are not in STS meet the criteria for applying a RICT Instrumentation RA revised for consistency with STS Site-specific ERCW System RA that is not in STS which meet the criteria for applying a RICT Site-specific Offsite Power RA that is not in STS which meet the criteria for applying a RICT Site-specific Electrical Distribution RA that is not in STS which meet the criteria for applying a RICT 5
PRA Technical Acceptability Internal Events including Internal Flooding Peer Reviewed Using NEI 05-04 Process Against ASME/ANS RA-Sa-2009 (Parts 2 and 3) with RG 1.200 Rev 2 Exceptions Finding Closure Review Performed Using Appendix X Process No Open Internal Events/Internal Flooding Finding Level F&Os Fire Peer Reviewed Using NEI 07-12 Process Against ASME/ANS RA-Sa-2009 (Part 4) with RG 1.200 Rev 2 Exceptions Finding Closure Review Performed Using Appendix X Process No Open Fire PRA Finding Level F&Os 6
PRA Technical Acceptability (continued)
Seismic Peer Reviewed Using NEI 12-13 Process Against ASME/ANS RA-Sb-2013 (Part 5) with applicable RG 1.200 Rev 2 Exceptions Finding Closure Review Performed Using Appendix X Process No Open Seismic PRA Finding Level F&Os Other External Hazards All Other External Hazards Screened Out in accordance with ASME/ANS RA-Sa-2009 (Part 6) 7
RICT Program Real-Time Model A Real-Time Risk Model similar to existing Maintenance Rule a(4) Configuration Risk Management Program Incorporates Internal Events, Internal Flooding, Fire and Seismic into a One-Top Multi-Hazard Model Uses EPRI Phoenix Risk Analysis Software Incorporates RICT Calculation Based on CDF and LERF for Unit 1 and Unit 2 8
Schedule
- Projected submittal in mid-May 2021 with a requested approval within one year
- A 180-day implementation period is proposed 9
Summary
- RICT process will follow NEI 06-09-A
Questions/
Comments
???
11