Category:E-Mail
MONTHYEARML24309A0552024-11-0101 November 2024 NRR E-mail Capture - Request for Additional Information - TVA LAR to Revised Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2 Re TS Table 3.3.2-1, Function 5 ML24281A0072024-10-0202 October 2024 NRR E-mail Capture - Acceptance Review Results for the Sequoyah License Amendment Request to Modify the FHA Analysis, Tech Spec TS 3.9.4 and Tech Spec 3.3.6 (L-2024-LLA-0117) ML24177A1412024-06-11011 June 2024 NRR E-mail Capture - Audit Plan Related to Review of the Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, LAR to Revise Technical Specification Table 3.3.2-1 Function 5 ML24152A1542024-05-31031 May 2024 Document Request for Sequoyah Nuclear Plant - Radiation Protection Inspection - Inspection Report 2024-03 ML24128A1802024-05-0707 May 2024 NRR E-mail Capture - Acceptance Review for Sequoyah License Amendment Request to Modify TS 3.8.1 and TS 3.8.2 (L-2024-LLA-0047) ML24123A0882024-05-0202 May 2024 NRR E-mail Capture - Correction Acceptance Review Results for the Browns Ferry, Sequoyah, and Watts Bar License Amendment Request to Revise TS 5.4.1 or 5.7.1 (L-2024-LLA-0039) ML24122B4872024-04-30030 April 2024 NRR E-mail Capture - Acceptance Review Results for the Browns Ferry, Sequoyah, and Watts Bar License Amendment Request to Revise TS 5.4.1 or 5.7.1 (L-2024-LLA-0039) ML24144A2322024-04-20020 April 2024 Tennessee Multi-Sector Permit (Tmsp), 2024 Annual Discharge Monitoring Report for Outfalls SW-3, SW-3, and SW-9 ML24116A2012024-04-17017 April 2024 Nrctva ISFSI CBS (RFI) ML24074A4252024-03-14014 March 2024 NRR E-mail Capture - Sequoyah Hydrologic Analysis License Amendment Request - Notification of Change to Estimated Completion and Hours ML24059A4052024-02-28028 February 2024 Document Request for Sequoyah Nuclear Plant - Radiation Protection Inspection - Inspection Report 2024-02 ML24053A0302024-02-21021 February 2024 NRR E-mail Capture - Request for Steam Generator (SG) Tube Inspection Call for Sequoyah, Unit 1 ML24047A2792024-02-15015 February 2024 RAI Related to the Exemption Request for 10 CFR 37.11 ML24045A1002024-02-13013 February 2024 NRR E-mail Capture - Request for Additional Information Related to the Sequoyah Exemption Request for the 10 CFR Part 73 Enhanced Weapons Rule ML24032A0202024-01-31031 January 2024 NPDES Biocide/Corrosion Treatment Plan Annual Report, Cy 2023 ML24036A0132024-01-23023 January 2024 NRR E-mail Capture - Acceptance Review Results for Sequoyah and Watts Bar Nuclear Plants, License Amendment Request to Revise TS Table 3.3.2-1, Function 5, Turbine Trip and Feedwater Isolation ML23319A1662023-11-0202 November 2023 NRR E-mail Capture - Acceptance Review Results for Browns Ferry Nuclear Plant, Sequoyah Nuclear Plant, and Watts Bar Nuclear Plant, Exemption Request Related to 10 CFR 37.11(c)(2) ML23275A0272023-09-29029 September 2023 Submittal of Discharge Monitoring Report (DMR) Quality Assurance Study 43 Final Report 2023 ML23236A2562023-08-24024 August 2023 NRR E-mail Capture - Acceptance Review Results for the Sequoyah and Watts Bar License Amendment Request to Adopt TSTF-567 (L-2023-LLA-0106) ML23165A2862023-06-14014 June 2023 Tennessee Multi-Sector Permit (Tmsp), 2023 Annual Discharge Monitoring Report for Outfalls SW-1, SW-16, SW-17, SW-18, SW-19, and SW-21 ML23072A0722023-03-10010 March 2023 NRR E-mail Capture - (External_Sender) State Consultation - Sequoyah Nuclear Plant, Units 1 and 2; and Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.4.12 (L-2022-LLA-0103) ML23062A5952023-02-27027 February 2023 Staff follow-up Questions to TVAs 12/19/2022 Response of the Staffs Rsi Regarding 08/04/2022 SQN Exemption Request ML23058A1312023-02-27027 February 2023 FW: TVA Intentions on EA-22-129 ML23052A0792023-02-21021 February 2023 NRR E-mail Capture - Acceptance Review for Browns Ferry and Sequoyah License Amendment Request to Adopt TSTF-541 ML23046A3552023-02-15015 February 2023 Annual Water Withdrawal Report 2022 ML23019A3442023-01-19019 January 2023 Tennessee Multi-Sector Permit (Tmsp), 2022 Annual Discharge Monitoring Report for Outfalls SW-1, SW-16, and SW-19 ML23013A0362023-01-12012 January 2023 NRR E-mail Capture - (External_Sender) State Consultation for Alabama - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-554-A, Revision 1 (L-2022-LLA-0100) ML23013A0382023-01-12012 January 2023 NRR E-mail Capture - (External_Sender) State Consultation for Alabama - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-529, Revision 4 (L-2022-LLA-0088) ML23026A0282023-01-12012 January 2023 001 Radiation Safety Baseline Inspection Information Request ML22348A0972022-12-14014 December 2022 NRR E-mail Capture - State Consultation - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-529, Revision 4 (L-2022-LLA-0088) ML22348A0442022-12-13013 December 2022 NRR E-mail Capture - State Consultation - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-554-A, Revision 1 (L-2022-LLA-0100) ML22343A0692022-12-0808 December 2022 NRR E-mail Capture - Request for Additional Information - Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.4.12 (L-2022-LLA-0103) ML22348A0432022-11-28028 November 2022 NRR E-mail Capture - State Consultation - Sequoyah Nuclear Plant, Units 1 and 2, License Amendment Request to Modify the Approved 10 CFR 50.69 Categorization Process (L-2022-LLA-0033) ML22227A0712022-08-15015 August 2022 NRR E-mail Capture - Acceptance Review Results for Sequoyah and Watts Bar License Amendment Request to Revise TS 3.4.12 (EPID L-2022-LLA-0103) - Corrected ML22227A0262022-08-12012 August 2022 NRR E-mail Capture - Acceptance Review Results for Sequoyah and Watts Bar License Amendment Request to Revise TS 3.4.12 ML22227A0272022-08-11011 August 2022 NRR E-mail Capture - Request for Additional Information Related to Alternative Requests RP-11 for Sequoyah Nuclear Plant, Units 1 and 2, and IST-RR-9 for Watts Bar Nuclear Plant, Units 1 and 2 ML22215A2752022-08-0303 August 2022 NRR E-mail Capture - Acceptance Review Results for TVA Fleet License Amendment Request to Adopt TSTF-554 ML22214A1582022-08-0202 August 2022 NRR E-mail Capture - Request for Additional Information for Sequoyah Units 1 and 2 License Amendment Request for Fire and Seismic PRA Modification to 10 CFR 50.69 (L-2022-LLA-0033) ML22196A0732022-07-15015 July 2022 NRR E-mail Capture - (External_Sender) State Notification for Sequoyah Units 1 and 2 Amendment Issuance - TSTF-505 RICT (L-2021-LLA-0145) ML22194A8762022-07-13013 July 2022 NRR E-mail Capture - Acceptance Review Results for TVA Fleet License Amendment Request to Adopt TSTF-529 ML22173A0332022-06-17017 June 2022 NRR E-mail Capture - (External_Sender) State Notification for Sequoyah Units 1 and 2 Amendment Issuance - Reactor Trip System Instrumentation (L-2021-LLA-0200) ML22166A4292022-06-0606 June 2022 NRR E-mail Capture - LAR to Adopt TSTF-577 ML22151A0102022-05-27027 May 2022 NRR E-mail Capture - Revised Request for Additional Information Re Sequoyah Nuclear Plant Alternative Request RV-02 ML22146A3322022-05-26026 May 2022 NRR E-mail Capture - Request for Additional Information Related to Sequoyah Nuclear Plants LAR to Adopt TSTF-505 ML22151A0092022-05-26026 May 2022 NRR E-mail Capture - Request for Additional Information Re Sequoyah Nuclear Plant Alternative Request RV-02 ML22146A3342022-05-25025 May 2022 NRR E-mail Capture - Acceptance Review Results for Browns Ferry Nuclear Plant, Units 1, 2, and 3, Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Relief Requests (EPID L-2022-LLR-0045 - 0047) ML22137A2692022-05-17017 May 2022 Notice of Termination, TNR192066, Gravel Lot Restoration Project ML22136A0182022-05-16016 May 2022 NRR E-mail Capture - Acceptance Review Results for Sequoyah Nuclear Plant, Units 1 and 2, Alternative Request RP-11 and Watts Bar Nuclear Plant, Units 1 and 2, Alternative Request IST-RR-9 ML22144A1002022-05-12012 May 2022 NRR E-mail Capture - Request for Additional Information Related to TVAs Request to Revised the TVA Plants Radiological Emergency Plans ML22132A1762022-05-12012 May 2022 Tennessee Multi-Sector Permit (Tmsp), 2021 Annual Discharge Monitoring Report for Outfalls SW-2, SW-3, SW-4, SW-6, SW-8, SW-9, and SW-13 2024-06-11
[Table view] Category:Environmental Monitoring Report
MONTHYEARML24134A1762024-05-13013 May 2024 Submittal of 2023 Annual Radiological Environmental Operating Report ML24114A0482024-04-23023 April 2024 Annual Radioactive Effluent Release Report for 2023 Monitoring Period ML24144A2362024-04-20020 April 2024 Discharge Monitoring Report (Dmr), March 2024 ML24144A2322024-04-20020 April 2024 Tennessee Multi-Sector Permit (Tmsp), 2024 Annual Discharge Monitoring Report for Outfalls SW-3, SW-3, and SW-9 ML24106A0502024-04-12012 April 2024 Discharge Monitoring Report (Dmr), February 2024 ML24046A2372024-02-15015 February 2024 Annual Water Withdrawal Report 2023 ML24046A2362024-02-15015 February 2024 Discharge Monitoring Report (Dmr), January 2024 ML24032A0202024-01-31031 January 2024 NPDES Biocide/Corrosion Treatment Plan Annual Report, Cy 2023 ML24011A3162024-01-11011 January 2024 Submittal of Discharge Monitoring Report (Dmr), August 2023 ML24011A3202024-01-11011 January 2024 Submittal of Discharge Monitoring Report (Dmr), December 2023 ML24011A3192024-01-11011 January 2024 Submittal of Discharge Monitoring Report (Dmr), November 2023 ML24011A3172024-01-11011 January 2024 Submittal of Discharge Monitoring Report (Dmr), September 2023 ML24011A3182024-01-11011 January 2024 Submittal of Discharge Monitoring Report (Dmr), October 2023 ML23346A1222023-12-12012 December 2023 Annual Non-Radiological Environmental Operating Report - 2023 ML23275A0272023-09-29029 September 2023 Submittal of Discharge Monitoring Report (DMR) Quality Assurance Study 43 Final Report 2023 ML23233A0142023-08-15015 August 2023 Discharge Monitoring Report (Dmr), July 2023 ML23200A0202023-07-13013 July 2023 Discharge Monitoring Report (Dmr), June 2023 ML23165A2852023-06-14014 June 2023 Discharge Monitoring Report (Dmr), May 2023 ML23165A2862023-06-14014 June 2023 Tennessee Multi-Sector Permit (Tmsp), 2023 Annual Discharge Monitoring Report for Outfalls SW-1, SW-16, SW-17, SW-18, SW-19, and SW-21 ML23163A0382023-06-0808 June 2023 Discharge Monitoring Report (Dmr), April 2023 ML23121A0232023-04-27027 April 2023 Tennessee Multi-Sector Permit (Tmsp), 2023 Annual Discharge Monitoring Report for Outfalls SW-2, SW-3, SW-4, SW-6, SW-8, SW-9, and SW-13 ML23121A0182023-04-27027 April 2023 Discharge Monitoring Report (Dmr), March 2023 ML23075A1932023-03-16016 March 2023 Discharge Monitoring Report (Dmr), February 2023 ML23046A3482023-02-15015 February 2023 Discharge Monitoring Report (Dmr), January 2023 ML23046A3552023-02-15015 February 2023 Annual Water Withdrawal Report 2022 ML23019A3442023-01-19019 January 2023 Tennessee Multi-Sector Permit (Tmsp), 2022 Annual Discharge Monitoring Report for Outfalls SW-1, SW-16, and SW-19 ML23017A0182023-01-12012 January 2023 Discharge Monitoring Report (Dmr), October 2022 ML23017A0162023-01-12012 January 2023 Discharge Monitoring Report (Dmr), September 2022 ML23017A0212023-01-12012 January 2023 Discharge Monitoring Report (Dmr), December 2022 ML23017A0202023-01-0505 January 2023 Discharge Monitoring Report (Dmr), November 2022 ML23003A0262022-12-21021 December 2022 Tennessee Multi-Sector Permit (Tmsp), 2022 Annual Discharge Monitoring Report for Outfalls SW-17, SW-19, and SW-21 ML22347A0812022-12-13013 December 2022 Annual Non-Radiological Environmental Operating Report 2022 ML22255A0252022-09-12012 September 2022 Submittal of Discharge Monitoring Report (Dmr), August 2022 ML22251A1192022-09-0808 September 2022 Discharge Monitoring Report (DMR) Quality Assurance Study 42 Final Report 2022 ML22195A2362022-07-14014 July 2022 June 2022 Discharge Monitoring Report ML22166A3572022-06-15015 June 2022 May 2022 Discharge Monitoring Report (DMR) ML22137A2672022-05-17017 May 2022 Discharge Monitoring Report (Dmr), April 2022 ML22132A1912022-05-12012 May 2022 Submittal of Discharge Monitoring Report (Dmr), March 2022 ML22132A1842022-05-12012 May 2022 Submittal of Discharge Monitoring Report (Dmr), February 2022 ML22132A1762022-05-12012 May 2022 Tennessee Multi-Sector Permit (Tmsp), 2021 Annual Discharge Monitoring Report for Outfalls SW-2, SW-3, SW-4, SW-6, SW-8, SW-9, and SW-13 ML22131A1342022-05-11011 May 2022 Annual Radiological Environmental Operating Report for 2021 ML22115A1782022-04-25025 April 2022 Annual Radioactive Effluent Release Report for 2021 Monitoring Period ML22045A0222022-02-11011 February 2022 Discharge Monitoring Report (Dmr), January 2022 ML22018A0422022-01-13013 January 2022 Discharge Monitoring Report (Dmr), December 2021 ML22018A0342022-01-13013 January 2022 Tennessee Multi-Sector Permit (Tmsp), 2021 Annual Discharge Monitoring Report for Outfalls SW-1, SW-16, SW-17, SW-18, and SW-21 ML21348A3372021-12-14014 December 2021 Annual Non-Radiological Environmental Operating Report - 2021 ML21348A7152021-12-14014 December 2021 Discharge Monitoring Report (Dmr), November 2021 ML21347A9022021-12-13013 December 2021 Discharge Monitoring Report (DMR) Quality Assurance Study 41 Follow-up Report 2021 ML21320A0152021-11-15015 November 2021 Discharge Monitoring Report (DMR) Quality Assurance Study 41 Final Report 2021 ML21320A0192021-11-15015 November 2021 Discharge Monitoring Report (Dmr), September 2021 2024-05-13
[Table view] Category:Letter
MONTHYEARML24304A8492024-10-31031 October 2024 December 2024 Requalification Inspection Notification Letter IR 05000327/20250102024-10-29029 October 2024 Notification of Sequoyah, Units 1 and 2 - Comprehensive Engineering Team Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000327/2025010 and 05000328/2025010 ML24298A1172024-10-24024 October 2024 Cycle 26, 180-Day Steam Generator Tube Inspection Report CNL-24-074, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-10-23023 October 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions 05000327/LER-2024-001, Reactor Trip Due to a Turbine Trip2024-10-17017 October 2024 Reactor Trip Due to a Turbine Trip ML24282B0412024-10-15015 October 2024 Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plant, Units 1 and 2 ML24260A1682024-10-0404 October 2024 Regulatory Audit Summary Related to Request to Add and Revise Notes Related to Technical Specification Table 3.3.2-1, Function 5 ML24284A1072024-09-26026 September 2024 Affidavit for Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2 05000328/LER-2024-001, Reactor Trip Due to an Electrical Trouble Turbine Trip2024-09-25025 September 2024 Reactor Trip Due to an Electrical Trouble Turbine Trip CNL-24-060, Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description2024-09-24024 September 2024 Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description CNL-24-047, Decommitment of Flood Mode Mitigation Improvement Systems2024-09-24024 September 2024 Decommitment of Flood Mode Mitigation Improvement Systems ML24262A0602024-09-23023 September 2024 Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the Tennessee Valley Authority Nuclear Quality Assurance Plan ML24267A0402024-09-19019 September 2024 Cycle 27 Core Operating Limits Report Revision 0 CNL-24-065, Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-09-18018 September 2024 Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24185A1742024-09-18018 September 2024 Cover Letter - Issuance of Exemption Related to Non-Destructive Examination Compliance Regarding Sequoyah Nuclear Plant Independent Spent Fuel Storage Installation ML24253A0152024-09-0808 September 2024 Emergency Plan Implementing Procedure Revisions ML24247A2212024-08-29029 August 2024 Notification of Deviation from Pressurized Water Reactor Owners Group (PWROG) Letter OG-21-160, NEI 03-08 Needed Guidance: PWR Lower Radial Support Clevis Insert X-750 Bolt Inspection Requirements, September 1, 2021 ML24247A1802024-08-28028 August 2024 Application to Revise the Fuel Handling Accident Analysis, to Delete Technical Specification 3.9.4, Containment Penetrations, and to Modify Technical Specification 3.3.6, Containment Ventilation Isolation Instrumentation for Sequoyah Nuclea IR 05000327/20240052024-08-26026 August 2024 Updated Inspection Plan for Sequoyah Nuclear Plant, Units 1 and 2 - Report 05000327/2024005 and 05000328/2024005 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 CNL-24-061, Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08),2024-08-19019 August 2024 Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08), IR 05000327/20240022024-07-31031 July 2024 Integrated Inspection Report 05000327/2024002 and 05000328/2024002 ML24211A0572024-07-29029 July 2024 Submittal of Emergency Plan Implementing Procedure Revision ML24211A0542024-07-29029 July 2024 Operator License Examination Report ML24211A0412024-07-26026 July 2024 Unit 1 Cycle 26 Refueling Outage - 90-Day Inservice Inspection Summary Report ML24199A0012024-07-22022 July 2024 Clarification and Correction to Exemption from Requirement of 10 CFR 37.11(c)(2) ML24172A1342024-07-15015 July 2024 Exemptions from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - Letter ML24191A4652024-07-0909 July 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24177A0282024-06-25025 June 2024 Emergency Plan Implementing Procedure Revisions ML24176A0222024-06-24024 June 2024 Retraction of Interim Report of a Deviation or Failure to Comply – Transducer Model 8005N ML24089A1152024-06-21021 June 2024 Transmittal Letter, Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) ML24145A0852024-05-30030 May 2024 1B-B Diesel Generator Failure - Final Significance Determination Letter ML24145A1052024-05-29029 May 2024 301 Exam Approval Letter ML24134A1762024-05-13013 May 2024 Submittal of 2023 Annual Radiological Environmental Operating Report CNL-24-040, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-05-0808 May 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24128A0352024-05-0707 May 2024 Providing Supplemental Information to Apparent Violation ML24120A0582024-04-26026 April 2024 10 CFR 50.46 Annual Report for Sequoyah Nuclear Plant Units 1 and 2 ML24116A2612024-04-25025 April 2024 Interim Report of a Deviation or Failure to Comply - Transducer Model 8005N ML24114A0482024-04-23023 April 2024 Annual Radioactive Effluent Release Report for 2023 Monitoring Period CNL-24-037, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 422024-04-22022 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 42 ML24144A2362024-04-20020 April 2024 Discharge Monitoring Report (Dmr), March 2024 ML24144A2322024-04-20020 April 2024 Tennessee Multi-Sector Permit (Tmsp), 2024 Annual Discharge Monitoring Report for Outfalls SW-3, SW-3, and SW-9 ML24089A0882024-04-18018 April 2024 – Exemption from Select Requirements of 10 CFR Part 73; Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24102A1212024-04-18018 April 2024 Summary of Conference Call with Tennessee Valley Authority Regarding Sequoyah Nuclear Plant, Unit 1 Spring 2024 Steam Generator Tube Inspections CNL-24-024, Hydrologic Engineering Center River Analysis System Project Milestone Status Update2024-04-17017 April 2024 Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000327/20240012024-04-17017 April 2024 Integrated Inspection Report 05000327/2024001 and 05000328/2024001 ML24109A0272024-04-16016 April 2024 Cycle 27 Core Operating Limits Report Revision 0 CNL-23-006, Application to Modify Technical Specifications 3.8.1, AC Sources – Operating, and 3.8.2, AC Sources – Shutdown, for Sequoyah Nuclear Plant (SQN-TSC-22-03)2024-04-15015 April 2024 Application to Modify Technical Specifications 3.8.1, AC Sources – Operating, and 3.8.2, AC Sources – Shutdown, for Sequoyah Nuclear Plant (SQN-TSC-22-03) ML24106A0502024-04-12012 April 2024 Discharge Monitoring Report (Dmr), February 2024 2024-09-08
[Table view] |
Text
TENNESSEE VALLEY m AUTHORITY
Tennessee Valley Authority. Sequoyah Nuclear Plant, P.O. Box 2000. Soddy Daisy, TN 37384
April 20, 2024
ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001
Subject:
Sequoyah Nuclear Plant, Tennessee Multi-SectorPermit (TMSP), 2024 Annual Discharge Monitoring Report for Outfalls SW-3, SW-3, and SW-9 Attached is the 2024 Annual Discharge Monitoring Report for outfalls SW-2, SW-3, and SW-9 for Sequoyah Nuclear Plant.
Respectfully,
Travis R. Markum Environmental Scientist Markum, Travis R
From: Markum, Travis R Sent: Saturday, April 20, 2024 5:55 PM To: Blaine Lindsey Cc: Water Permits
Subject:
TNR050015 - SQN TMSP 2024 SW-2,3,9 Reports Attachments: SQN TMSP 2024 SW-2,3,9 signed 04.15.24.pdf
Mr. Lindsey,
Attached are the annual monitoring results for outfalls SW 2,3 and 9 for CY24. All results were less than benchmark threshold concentrations for Sector O of the TMSP.
Travis R. Markum Env. Scientist (Compliance)
Environmental Operations
TVA Sequoyah Nuclear Plant PO Box 2000, OPS 5N Soddy Daisy, TN 37384
<<: 423-843-6714
[£J: trmarkum@tva.aov
NOTICE: This electronic message transmission contains information that may be TVA SENSITIVE, TVA RESTRICTED, or TVA CONFIDENTIAL.Any misuse or unauthorized disclosure can result in both civil and criminal penalties. If you are not the intended recipient, be aware that any disclosure, copying, distribution, or use of the content of this information is prohibited. If you have received this communication in error, please notify me immediately by email and delete the original message.
Tennessee Department of Environment and Conservation Division of Water Resources William R. Snodgrass Tennessee Tower 312 Rosa L Parks Avenue, 11th Floor, Nashville, Tennessee 37243
ANNUAL STORMWATER MONITORING REPORT for Stormwater Discharges Associated with Industrial Activity under the TENNESSEE MULTI-SECTOR GENERAL PERMIT (TMSP)
Facility Name: TVA - Sequoyah Nuclear Plant TMSP Number: TNR050015
Contact Person: Travis Markum Phone Number: 423-843-6714 This report is submitted for the following calendar year (e.g. 2015): 2024 Outfall Number: SW 2 List all TMSP sectors which apply to discharge from this outfall: 0 Sample Date: 3/15/2024 Low Concentration Waiver (Note 3): list all parameters for which the facility is certifying that there has not been a significant change in industrial activity or the pollution prevention measures in the area of the facility that drains to the outfall for which sampling was waived:
DIRECTIONS:In the spaces below, provide the results of stormwater monitoring for the designated outfall. For each outfall, one Annual Stormwater Monitoring Report must be submitted. The parameters for which monitoring must be conducted depend on which industry sector(s) of the TMSP applies to the discharge. Look up your sector(s) in the TMSP and analyze for the parameters that apply. Ifparameter is not listed below, submit additional sheets. All samples should be grab.
Cut-off Annual Cut-off Annual Parameter Cone. Sample Parameter (continued) Cone. Sample (mg/L) Result (mg/L) (mg/L) Result (mg/L)
Aluminum, Total 0.75Magnesium, Total 0.0636 Ammonia 4.0Mercury, Total 0.0024 Arsenic, Total 0.16854Nickel, Total 0.875 BOD, 5-Day 30Nitrate + Nitrite Nitrogen0.68 Cadmium, Total 0.0159Oil and Grease 15 COD 120pH^0^9.0 Copper, Total 0.018Phosphorus, Total (as P) 2.0 Cyanide, Total 0.064Selenium, Total 0.2385 Fluoride 1_.8_Silver, TotalJ)!032_
Iron, Total 1.895.rJTotal Suspended Solids150
Lead, Total 0.15Zinc, Total 0.395 CERTIFICATIONAND SIGNATURE: (Make all entries in ink, not with a pencil. This report must be signed by a responsible corporate officer for a corporation, a general partner for a partnership, the proprietor for a sole proprietorship, or a principalexecutiveofficer or rankingelected official for a public agency.)
I certify under penalty of law that this documentand all of its attachmentswere prepared under my directionor my supervision in accordance with a system designed to assure qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsiblefor gatheringthe information,the informationsubmitted is, to the best of my knowledge and belief, true, accurate,and complete. I am aware there are significantpenaltiesfor submittingfalse information,includingthe possibilityof fine and imprisonmentfor knowing violations.As specifiedin TennesseeCode AnnotatedSection 39-l6-702(a){4),this declarationis made under penalty of perjury.
Tony McMutuary Sr Manager, Chem/ENV
Printed Name Official Title 7c?y W^WtAA'h \\mJ3JUltSignature jJDate
CN-1115 (Rev 10/18) Page 1 of 2 RDA 2366 Tennessee Department of Environment and Conservation Division of Water Resources William R. Snodgrass Tennessee Tower 312 Rosa L. Parks Avenue, 1 Hh Floor, Nashville. Tennessee 37243
ANNUAL STORMWATER MONITORING REPORT for Stormwater Discharges Associated with Industrial Activity under the TENNESSEE MULTI-SECTOR GENERAL PERMIT (TMSP)
Facility Name: TVA - Sequoyah Nuclear Plant TMSP Number: TNR050015
Contact Person: Travis Markum Phone Number: 423-843-6714 This report is submitted for the following calendar year (e.g. 2015): 2024 Outfall Number: SW 3 List all TMSP sectors which apply to discharge from this outfall: 0 Sample Date: 3/15/2024 Low Concentration Waiver (Note 3): list all parameters for which the facility is certifying that there has not been a significant change in industrial activity or the pollution prevention measures in the area of the facility that drains to the outfall for which sampling was waived:
DIRECTIONS:In the spaces below, provide the results of stormwater monitoring for the designated outfall. For each outfall, one Annual Stormwater Monitoring Report must be submitted. The parameters for which monitoring must be conducted depend on which industry sector(s) of the TMSP applies to the discharge. Look up your sector(s) in the TMSP and analyze for the parameters that apply. If parameter is not listed below, submit additional sheets. All samples should be grab.
Cut-off Annual Annual Parameter Cone. Sample Parameter (continued) Sample (mg/L) Result (mg/L) Result (mg/L)
Aluminum, Total 0.75Magnesium, Total 0.0636 Ammonia 4.0Mercury, Total 0.0024 Arsenic, Total 0.16854Nickel, Total A8ZL BOD, 5-Day 30 iNitrate + Nitrite_Nitrogen^0.68 Cadmium, Total 0.0159Oil and Grease 15 COD 120pH5.0-9.0 Copper, Total 0.018Phosphorus, Total (as P) 2.0 Cyanide, Total 0.064Selenium, Total 0.2385 Fluoride 1.8Silver, Total0^032 Iron, Total 5.0 1.84Total Suspended Solids Lead, Total 0.15Zinc, Total 0395
CERTIFICATIONAND SIGNATURE: (Make all entries in ink, not with a pencil. This report must be signed by a responsible corporate officer for a corporation, a general partner for a partnership, the proprietor for a sole proprietorship, or a principalexecutiveofficer or ranking elected officialfor a public agency.)
I certify under penalty of law that this document and all of its attachments were prepared under my directionor my supervision in accordance with a system designed to assure qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware there are significantpenalties for submitting false information, includingthe possibilityof fine and imprisonment for knowing violations.As specifiedinTennesseeCode AnnotatedSection 39-l6-702(aK4),this declarationis made under penaltyof perjury.
Tony McMutuary Sr Manager, Chem/ENV 7
- 'c 1 u Printed Name Official Title Signature ___ J_! Date
CN-1115 (Rev 10/18) Page 1 of 2 RDA2366 Tennessee Department of Environment and Conservation Division of Water Resources William R. Snodgrass Tennessee Tower 312 Rosa L. Parks Avenue, 11th Floor, Nashville, Tennessee 37243
ANNUAL STORMWATER MONITORING REPORT for Stormwater Discharges Associated with Industrial Activity under the TENNESSEE MULTI-SECTOR GENERAL PERMIT (TMSP)
Facility Name: TVA - Sequoyah Nuclear Plant TMSP Number: TNR050015 contact Person: Travis Markum Phone Number: 423-843-6714 This report is submitted for the following calendar year (e.g. 2015): 2024 Outfall Number: SW 9 List all TMSP sectors which apply to discharge from this outfall: 0 Sample Date: 3/15/2024 Low Concentration Waiver (Note 3): list all parameters for which the facility is certifying that there has not been a significant change in industrial activity or the pollution prevention measures in the area of the facility that drains to the outfall for which sampling was waived:
DIRECTIONS:In the spaces below, provide the results of stormwater monitoring for the designated outfall. For each outfall, one Annual Stormwater Monitoring Report must be submitted. The parameters for which monitoring must be conducted depend on which industry sector(s) of the TMSP applies to the discharge. Look up your sector(s) in the TMSP and analyze for the parameters that apply. If parameter is not listed below, submit additional sheets. All samples should be grab.
Cut-off Annual Cut-off Annual Parameter Cone. Sample Parameter (continued) Cone. Sample (mg/L) Result (mg/L) (mg/L) Result (mg/L)
Aluminum, Total 0.75Magnesium, Total 0.0636 Ammonia 4.0Mercury, Total0.0024 Arsenic, Total 0.16854Nickel, Total 0.875 BOD, 5-Day 30Nitrate + Nitrite Nitrogen0.68 Cadmium, Total 0.0159Oil and Grease 15 COD 120pH5.0-9.0 Copper, Total 0.018Phosphorus, Total (as P) 2.0 Cyanide, Total 0.064Selenium, Total 0.2385 Fluoride 1.8Silver, Total6.032 Iron, Total 5.0 1.19Total Suspended Solids
Lead, Total 0.15Zinc, Total
CERTIFICATIONAND SIGNATURE: (Make all entries in ink, not with a pencil. This report must be signed by a responsible corporate officer for a corporation, a general partner for a partnership, the proprietor for a sole proprietorship, or a principalexecutive officer or ranking elected official for a public agency.)
I certify under penaltyof law that this document and all of its attachments were prepared under my direction or my supervision in accordance with a system designed to assure qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gatheringthe information,the informationsubmitted is, to the best of my knowledge and belief, true, accurate,and complete. I am aware there are significantpenaltiesfor submittingfalse information,including the possibilityof fine and imprisonmentfor knowing violations.As specifiedin TennesseeCode AnnotatedSection 39-l6-702(a){4),this declarationis made under penalty of perjury.
Tony McMutuary Sr Manager, Chem/ENV Vti-Printed Name Official Title SignatureDate
CN-1115 (Rev 10/18) Page 1 of 2 RDA 2366