ML17059B554: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(6 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 03/31/1997 | | issue date = 03/31/1997 | ||
| title = Revised Monthly Operating Rept for Mar 1997 for Nine Mile Point Nuclear Station,Unit 1 | | title = Revised Monthly Operating Rept for Mar 1997 for Nine Mile Point Nuclear Station,Unit 1 | ||
| author name = | | author name = Coleman D | ||
| author affiliation = NIAGARA MOHAWK POWER CORP. | | author affiliation = NIAGARA MOHAWK POWER CORP. | ||
| addressee name = | | addressee name = | ||
Line 15: | Line 15: | ||
| page count = 2 | | page count = 2 | ||
}} | }} | ||
=Text= | |||
{{#Wiki_filter:OPERATING DATA REPORT DOCKET NO.: 50-220 DATE: 4/03/97 PREPARED BY: D. E. Coleman TELEPHONE: (315) 349-2558 OPERATING STATUS Rev. 1 | |||
: 1. Unit Name: Nine Mile Point Unit //1 | |||
: 2. Reporting Period: March 1997 Notes | |||
: 3. Licensed Thermal Power (MWt): 1850 | |||
: 4. Nameplate Rating (Gross MWe): 642 | |||
: 5. Design Electrical Rating (Net MWe): 613 | |||
: 6. Maximum Dependable Capacity (Gross MWe): 584 | |||
: 7. Maximum Dependable Capacity (Net MWe): 565 | |||
: 8. If Changes Occur in Capacity Ratings (Items Number 3 through 7) Since Last Report, Give Reasons: | |||
: 9. Power Level To Which Restricted, If Any (Net MWe): | |||
: 10. Reasons For Restrictions, If Any: | |||
This Month Yr-to-Date Cumulative | |||
: 11. Hours in Reporting Period 744.0 2160.0 241) 417.2 | |||
: 12. Number of Hours Reactor Was Critical 71.0 1452.9 163729.9 | |||
: 13. Reactor Reserve Shutdown Hours 0 0 1,204.2 | |||
: 14. Hours Generator On-Line 71.0 1445.2 159,801.4 | |||
: 15. Unit Reserve Shutdown Hours 0 0 20.4 | |||
: 16. Gross Thermal Energy Generated (MWH) 116) 233.0 2,613,580.0 271 820 360 0 I | |||
: 17. Gross Electrical Energy Generated (MWH) 39,393.0 893,362.0 90,471,818.0 | |||
: 18. Net Electrical Energy Generated (MWH) 38,226.0 868,938.0 87,730,492.0 | |||
: 19. Unit Service Factor 9.5 66.9 66.2 | |||
: 20. Unit Availability Factor 9.5 66.9 66.2 | |||
: 21. Unit Capacity Factor (Using MDC Net) 9.1 71.2 60.2 | |||
: 22. Unit Capacity Factor (Using DER Net) 8.4 65.6 58.7 | |||
: 23. Unit Forced Outage Rate 0.0 2.8 22.2 | |||
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each): | |||
(35 Day Refuel Outage scheduled for March 3, 1997) | |||
: 25. If shutdown At End of Report Period, Estimated Date of Startup: April 18, 1997 9705220320 970512 PDR ADOCK 05000220 R PDR | |||
i (y L ~ | |||
I 'tg ~ I s() erg I 41 h}} |
Latest revision as of 19:00, 4 February 2020
ML17059B554 | |
Person / Time | |
---|---|
Site: | Nine Mile Point |
Issue date: | 03/31/1997 |
From: | Coleman D NIAGARA MOHAWK POWER CORP. |
To: | |
Shared Package | |
ML17059B552 | List: |
References | |
NUDOCS 9705220320 | |
Download: ML17059B554 (2) | |
Text
OPERATING DATA REPORT DOCKET NO.: 50-220 DATE: 4/03/97 PREPARED BY: D. E. Coleman TELEPHONE: (315) 349-2558 OPERATING STATUS Rev. 1
- 1. Unit Name: Nine Mile Point Unit //1
- 2. Reporting Period: March 1997 Notes
- 3. Licensed Thermal Power (MWt): 1850
- 4. Nameplate Rating (Gross MWe): 642
- 5. Design Electrical Rating (Net MWe): 613
- 6. Maximum Dependable Capacity (Gross MWe): 584
- 7. Maximum Dependable Capacity (Net MWe): 565
- 8. If Changes Occur in Capacity Ratings (Items Number 3 through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted, If Any (Net MWe):
- 10. Reasons For Restrictions, If Any:
This Month Yr-to-Date Cumulative
- 11. Hours in Reporting Period 744.0 2160.0 241) 417.2
- 12. Number of Hours Reactor Was Critical 71.0 1452.9 163729.9
- 13. Reactor Reserve Shutdown Hours 0 0 1,204.2
- 14. Hours Generator On-Line 71.0 1445.2 159,801.4
- 15. Unit Reserve Shutdown Hours 0 0 20.4
- 16. Gross Thermal Energy Generated (MWH) 116) 233.0 2,613,580.0 271 820 360 0 I
- 17. Gross Electrical Energy Generated (MWH) 39,393.0 893,362.0 90,471,818.0
- 18. Net Electrical Energy Generated (MWH) 38,226.0 868,938.0 87,730,492.0
- 19. Unit Service Factor 9.5 66.9 66.2
- 20. Unit Availability Factor 9.5 66.9 66.2
- 21. Unit Capacity Factor (Using MDC Net) 9.1 71.2 60.2
- 22. Unit Capacity Factor (Using DER Net) 8.4 65.6 58.7
- 23. Unit Forced Outage Rate 0.0 2.8 22.2
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
(35 Day Refuel Outage scheduled for March 3, 1997)
- 25. If shutdown At End of Report Period, Estimated Date of Startup: April 18, 1997 9705220320 970512 PDR ADOCK 05000220 R PDR
i (y L ~
I 'tg ~ I s() erg I 41 h