ML18017B286: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 20: Line 20:
                                               ~
                                               ~
OSOOOLIOO 50-001 Shearon Harris Nuclear Power Pl antR Unit 2i Carolina                                    05000001 50-403 Shearon Harris Nuclear Power Pl anti Unit 4i Carolina BYNAME                                                                                            05000403 AUTH CHI ANGI N, J.
OSOOOLIOO 50-001 Shearon Harris Nuclear Power Pl antR Unit 2i Carolina                                    05000001 50-403 Shearon Harris Nuclear Power Pl anti Unit 4i Carolina BYNAME                                                                                            05000403 AUTH CHI ANGI N, J.
            <
AUTHOR    AFF11LtiATION Cv r o ti na P owe r 8 Light Co.
AUTHOR    AFF11LtiATION Cv r o ti na P owe r 8 Light Co.
1 0  Nl'T  3, (p~ i i m~  a~%>
1 0  Nl'T  3, (p~ i i m~  a~%>

Latest revision as of 19:13, 3 February 2020

Interim Deficiency Rept Re Omission of Protective Coating & Existence of Damaged Coating on Containment Liner,Initially Reported on 800917.Application of Final Coat of Paint W/Repairs to Damaged Areas & Final Rept Expected by 810301
ML18017B286
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 11/14/1980
From: Chiangi N
CAROLINA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, NUDOCS 8011240388
Download: ML18017B286 (6)


Text

REGULATOR INFORMATION DIS TRI BUT ION "TEM (RIDS)

ACCESSION NBR: 6011200386 DOC DATE; 80/11/1 NOTARIZED: NO DOCKET" N FACIL;50-000 Shearon Harris Nuclear Power Pl anti Unit ii Carolina

~

OSOOOLIOO 50-001 Shearon Harris Nuclear Power Pl antR Unit 2i Carolina 05000001 50-403 Shearon Harris Nuclear Power Pl anti Unit 4i Carolina BYNAME 05000403 AUTH CHI ANGI N, J.

AUTHOR AFF11LtiATION Cv r o ti na P owe r 8 Light Co.

1 0 Nl'T 3, (p~ i i m~ a~%>

RECIP NAME RECAP IEN'T AFFILIATION O'REILLYP J,P ~ Region 4P Dal esp Of f ice of the Director 1

SUBJECT:

Inter1im deficiency rept re omission of>> protective'coating 8 existence of damaged coating on containment lineriinitially reported on 600917 Application of final coat of paint

~

w/repairs to damaged areas 8 final rept expected by 610301,,

DISTRIBUTION CODE': B0100 COPIES RECEIVED:LiTR TITLE; Construction Def ici ency Report (10CFRSO,SSEI)

+ ENCLt Q SIZE:

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE'/NAME LA'T R EN C Li, ID CODE/NAME'OUNGBLOODPB LTTR ENCL ACTIONS A/D LtICENSNG 04 05 RUSHBROOKPM ~ 06 AILSONi JERRY 07 INTERN'AL1; AD/RCI/IE. 17 1 "AEOD 18 1 ASLBP/J ~ HARD 1:- D/DIR HUM FAC15 1 EDO 8 STAFF>> 19 1 EQUIP QUAL) BR11 1 HYD/GEO BR 22 1 l8,Et 09 1 LIC QUALI BR 12 1 MPA 20 1 NRC PDR 02 1 OELD 21 1 V 13 1 QA BR ig 1 EG FILE, 1 1 RUTHERFORDiH,IE 1 21 1 EXTERNAL: ACRS 16 16 1 LPDR 03 NSIC" 08 0 5'g8 TOTAL NUMBER'FT COPIES REQUIRED: LTTR 39'NCL

l P

FORM 21-SOM r

CHAL Carolina Power & Light Company Raleigh, N, o. 27602 gP, j$ ~ Pgs QqIl f mVOV~i @l g a~

Pile: SH N-2/18 Item 49 us 88>

OtSTRfBUT(0N SQQJge MANCH Hoveraber 14, 1980

. James P. O'Reil.ly United States Huclear Regulatory Commission Region II 101 Marietta Street, Northwest Atlanta, Georgia 30303 SHEARON HARRIS NUCLEAR POWER PLAUDIT UNITS 1, 2 ~ 3, AND 4 DOCKET NOS. 50-400, 50-401, 50-402, AND 50-403 OMISSIOH OP PROTECTIVE COATING AND EXISTENCE OP DAMAGED COATING ON THE UNIT 1 CONTAINMENT LINER - INTERIM REPORT Dear Mr. O'Reillyt On September 17, 1980, the NRC (Mr. J. K. Rausch) was notified of the subject deficiency as being a potentially reportable item per the provisions of 10CPR50.55(e). On October 17, 1980, the NRC (Mr. J. K. Rausch) was informed that the sub5ect deficiency was considered reportable per the provisions of 10CFR50.55(e).

The deficiency in question pertains to a section of the Unit 1 Containment Liner Plate, adjacent to the refueling canal slab (a two inch gap exists in this area) not having received the final coat of paint, and in some cases, areas of damaged coating not having been repaired. The section in question is approximately five (5) feet in height and sixteen (16) feet long. The intent of this letter is to inform you that corrective action has not been initiated to date since the formwork in this area has not been completely removed, and.

hence, accessibility is restricted. It is now anticipated that all corrective action will be completed by March 1, 1981, at which time the final 10CPR50.55(e) report will be submitted. When corrective action is implemented, it will consist of application of the final coat of paint and repairs to the damaged areas.

4

,"I) 4 4 4 hlih 4

4 ~ . 44" 4rq<A I'<<(>>

p:jr ) 'ho 'll ~

4 4 444 I 4',Q ~ ~4 too<<g .

gP g'I'Y g 4" 4) 4; 4

44 4 4

44v 4l 4

c JL4(  %>> 2-. I hh '>> 4' Jt < ~ ~ 4Y ~

DO )QC~'i ~ iJ '4 . 44%8 I r 'I 4.4 .V 44.Y 4'It>> l II ~ " '

4, (Y4 'l Yl 4 o ~ "4 ~ Y= -44 4 I l < l h 4 g L 4: L- h44$ 4 ~ i4 ~ h 4$ Al 44 I

,( j(

frh*YI 4 I ~ 4) Q) 4 I Y I 4' 4

~

P 44 Y Io YI'~ Qou 4 h~

414 ~

4 IY h*

4 II 44 II o .

4 4 gl(Y g, ghh, (I ~ hY'PY4u 4,, ( ~ 4 4'k 4 4 II 4 I 4 4 ~ Q p 4 4

~

  • '~ " h aY - ~'4~ gY ) 4'lY I

~ I'4 4 4"

4 'Is ho>>4 'll YP, 4 4 PY 4 YY'Y 4 ' 4 [h 4,, P 4

~ gg~t ( 4 4Y 4 <<J' 4fJo ~ ) Q, 44, L

Mr J P O'Reill November 14, 1980 If-you have any questions regarding the above, please contact me.

Yours very truly, Original Signed Bp N. 3. Chiangi N. J. ChMgi - Manager Engineering 6 Construction Quality Assurance NJC/gea (5390) cc: Mr. G. Haxwell Mr. V. Stello (2)v'

0 V' a'.'

D I'g~ g" 't~ q y'I~ g Q y J

g4"

~(s), .

e r

k+s4'Jw l ti c