VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH Auoust    YEAR 1978 (Revised 11-05-79)
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH Auoust    YEAR 1978 (Revised 11-05-79)
SUBMITTED:
SUBMITTED:
ND      [A .<&~
ND      [A .<&~
SUPERINTENDENT - OPERATIONS APPROVED:
SUPERINTENDENT - OPERATIONS APPROVED:
  .
      ..
                                            '
                                                     / W MANAGER' 1120056f
                                                     / W MANAGER' 1120056f


                                                                                                                      .  .
b            OPERATING DATA REPORT QOO y \.)                                                                              DOCKET NO.
b            OPERATING DATA REPORT QOO y \.)                                                                              DOCKET NO.
50-338 DATE ll b74 C051PLETED BY      W. R. Madison TELEPHONE        (701)B21-5151 OPER.\ TING STATUS
50-338 DATE ll b74 C051PLETED BY      W. R. Madison TELEPHONE        (701)B21-5151 OPER.\ TING STATUS
Line 43: Line 37:
N/A N/A
N/A N/A
: 9. Power Level To which Restricted,If Any (Net MWe):
: 9. Power Level To which Restricted,If Any (Net MWe):
: 10. Reasons For Restriction.s. If Any:                              N/A
: 10. Reasons For Restriction.s. If Any:                              N/A This Month            Yr to-Date          Cumulative
                                                                                                                    -  .
                                .
This Month            Yr to-Date          Cumulative
: 11. Hours in Reporting Period                                744                  2,088                2.088 2
: 11. Hours in Reporting Period                                744                  2,088                2.088 2
: 12. Numb r Of Hours Reactor Was Critical                    744                  2,036                2,036
: 12. Numb r Of Hours Reactor Was Critical                    744                  2,036                2,036
Line 60: Line 51:
: 22. Unit Capacity Factor (Using DER Net)                      86.1                  82.0                  82.0
: 22. Unit Capacity Factor (Using DER Net)                      86.1                  82.0                  82.0
: 23. Unit Forced Outage Rat,                                    0.0                    0.5                  0.5
: 23. Unit Forced Outage Rat,                                    0.0                    0.5                  0.5
                                                                                                      '
: 24. Shutdowns Scheduled Oser Next 6 Months (Type. Date.and Duration of Each):
: 24. Shutdowns Scheduled Oser Next 6 Months (Type. Date.and Duration of Each):
Scheduled, Sept. 22-29, 1978, Snubber Inspection & Misc. Maint.
Scheduled, Sept. 22-29, 1978, Snubber Inspection & Misc. Maint.
: 25. If Shut Down At End Of Report Period, Estimated Date of Startup:      N/A
: 25. If Shut Down At End Of Report Period, Estimated Date of Startup:      N/A
: 26. Units in Test Status (Prior to Commercial Operation):                      Forecast            Achieved INITIA L CRITICALITY INI TIA L ELECTRICITY COMMERCIAL OPERATION
: 26. Units in Test Status (Prior to Commercial Operation):                      Forecast            Achieved INITIA L CRITICALITY INI TIA L ELECTRICITY COMMERCIAL OPERATION 1367 297}}
                                                                                                              '"""
1367 297}}

Latest revision as of 05:23, 2 February 2020

Revised Monthly Operating Rept for Aug 1978
ML19210D129
Person / Time
Site: North Anna Dominion icon.png
Issue date: 11/05/1979
From: Wil Madison
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML19210D121 List:
References
NUDOCS 7911200564
Download: ML19210D129 (2)


Text

. .

VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH Auoust YEAR 1978 (Revised 11-05-79)

SUBMITTED:

ND [A .<&~

SUPERINTENDENT - OPERATIONS APPROVED:

/ W MANAGER' 1120056f

b OPERATING DATA REPORT QOO y \.) DOCKET NO.

50-338 DATE ll b74 C051PLETED BY W. R. Madison TELEPHONE (701)B21-5151 OPER.\ TING STATUS

1. Unit Name: North Anna Notes , ,
2. Reporting Period:

August 1978 (Revised) 3.. Licensed Thermal Power (51Wt): 2775 ' '

4. Nameplate Rating (GrosiMWe): 947 ' -
5. Design E!cetrical Rating (Net MWe): 907
6. Maximum Depenable Capacity (Gross MWe): 928
7. S'aximum Dependable Capacity (Net MWe):

090

8. If Changes Occur in Capacity Ratings (Items Number 3 Thruugh 7) Since Last Report. Give Reasons:

N/A N/A

9. Power Level To which Restricted,If Any (Net MWe):
10. Reasons For Restriction.s. If Any: N/A This Month Yr to-Date Cumulative
11. Hours in Reporting Period 744 2,088 2.088 2
12. Numb r Of Hours Reactor Was Critical 744 2,036 2,036
13. Reactor Reserve Shutdown Ifours 0 22.4 22.4
14. Ifours Generator On-Line 744 2,027.8 2,027_.8
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross The mal Energy Generated (MWH) l,959,033 5.19L815 5.192.8185
17. Grou Electrical Energy Generated (MWH) 620,088 _ _ . 1.661.403 1.661.401 _

IS. Net Electrical Energy Generated (MWH) 581,045 1,552,923 1.552.923

19. Unit Service Factor 100.0 97.1 97.1
20. Unit Availability Fac:or 100.0 97.1 92,1___
21. Unit Capacity Factor (Using MDC Net) 87.0 82.8 8 t.3_
22. Unit Capacity Factor (Using DER Net) 86.1 82.0 82.0
23. Unit Forced Outage Rat, 0.0 0.5 0.5
24. Shutdowns Scheduled Oser Next 6 Months (Type. Date.and Duration of Each):

Scheduled, Sept. 22-29, 1978, Snubber Inspection & Misc. Maint.

25. If Shut Down At End Of Report Period, Estimated Date of Startup: N/A
26. Units in Test Status (Prior to Commercial Operation): Forecast Achieved INITIA L CRITICALITY INI TIA L ELECTRICITY COMMERCIAL OPERATION 1367 297