| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 April 22, 2013 Mr. D. R. Madison Vice President | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 April 22, 2013 Mr. D. R. Madison Vice President Southern Nuclear Operating Company, Inc. |
| | | Edwin I. Hatch Nuclear Plant 11028 Hatch Parkway North Baxley, GA 31513 |
| Southern Nuclear Operating Company, Inc. Edwin I. Hatch Nuclear Plant 11028 Hatch Parkway North Baxley, GA 31513 | |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
Line 23: |
Line 22: |
|
| |
|
| ==SUMMARY== | | ==SUMMARY== |
| - EDWIN I. HATCH NUCLEAR PLANT DOCKET NOS. 50-321 AND 50-366 | | - EDWIN I. HATCH NUCLEAR PLANT DOCKET NOS. 50-321 AND 50-366 |
|
| |
|
| ==Dear Mr. Madison:== | | ==Dear Mr. Madison:== |
|
| |
|
| This refers to the meeting conducted on April 17, 2013, in Vidalia, Georgia. The purpose of the meeting/open house session was to provide opportunities to discuss the annual assessment of Edwin I. Hatch Nuclear Plant with the public for the period of January 1, 2012, - December 31, 2012. Enclosed are a list of attendees, copies of the poster boards displayed at the meeting, and the meeting handout. | | This refers to the meeting conducted on April 17, 2013, in Vidalia, Georgia. The purpose of the meeting/open house session was to provide opportunities to discuss the annual assessment of Edwin I. Hatch Nuclear Plant with the public for the period of January 1, 2012, - December 31, 2012. Enclosed are a list of attendees, copies of the poster boards displayed at the meeting, and the meeting handout. |
| In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be | | In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room (PDR) or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). |
| | | ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). |
| available electronically for public in spection in the NRC Public Document Room (PDR) or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |
| | |
| Should you have any questions concerning this meeting, please contact me at (404) 997-4611. | | Should you have any questions concerning this meeting, please contact me at (404) 997-4611. |
| Sincerely, | | Sincerely, |
| /RA By Jannette Worosilo For/
| | /RA By Jannette Worosilo For/ |
| | | Frank Ehrhardt, Chief Reactor Projects Branch 2 Division of Reactor Projects Docket Nos.: 50-321 and 50-366 License Nos.: DPR-57 and NPF-5 |
| Frank Ehrhardt, Chief Reactor Projects Branch 2 Division of Reactor Projects Docket Nos.: 50-321 and 50-366 License Nos.: DPR-57 and NPF-5 | |
|
| |
|
| ==Enclosures:== | | ==Enclosures:== |
| : 1. List of Attendees | | : 1. List of Attendees |
| : 2. Poster Boards | | : 2. Poster Boards |
| : 3. Meeting Handout | | : 3. Meeting Handout cc w/encls: (See page 2) |
|
| |
|
| cc w/encls: (See page 2)
| | ____________ X SUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE RII:DRP RII:DRP SIGNATURE Via email /RA/ |
| | NAME EMorris JWorosilo DATE 04/19/2013 4/22/2013 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO |
|
| |
|
| ____________ X SUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE RII:DRP RII:DRP SIGNATURE Via email /RA/ NAME EMorris JWorosilo DATE 04/19/2013 4/22/2013 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO D. Madison 2 cc w/encls: C. Russ Dedrickson Fleet Support Supervisor
| | D. Madison 2 cc w/encls: |
| | C. Russ Dedrickson Dennis R. Madison Fleet Support Supervisor Vice President Southern Nuclear Operating Company, Inc. Edwin I. Hatch Nuclear Plant Electronic Mail Distribution Southern Nuclear Operating Company, Inc. |
| | Electronic Mail Distribution David R. Vineyard Plant Manager T. E. Tynan Edwin I. Hatch Nuclear Plant Site Vice President Southern Nuclear Operating Company, Inc. Vogtle Electric Generating Plant Electronic Mail Distribution Southern Nuclear Operating Company, Inc. |
| | Electronic Mail Distribution S. Kuczynski Chairman, President and CEO C. R. Pierce Southern Nuclear Operating Company, Inc. Nuclear Licensing Director Electronic Mail Distribution Southern Nuclear Operating Company, Inc. |
| | Electronic Mail Distribution Todd L. Youngblood Vice President B. D. McKinney, Jr. |
| | Fleet Oversight Regulatory Response Manager Southern Nuclear Operating Company, Inc. Southern Nuclear Operating Company, Inc. |
| | Electronic Mail Distribution Electronic Mail Distribution Leigh Perry D. W. Daughhetee SVP & General Counsel-Ops & SNC Licensing Engineer Southern Nuclear Operating Company, Inc. Southern Nuclear Operating Company, Inc. |
| | Electronic Mail Distribution Electronic Mail Distribution D. G. Bost T. D. Honeycutt Chief Nuclear Officer Regulatory Response Supervisor Southern Nuclear Operating Company, Inc. Southern Nuclear Operating Company, Inc. |
| | Electronic Mail Distribution Electronic Mail Distribution Paula Marino Bradley J. Adams Vice President Vice President Engineering Fleet Operations Support Southern Nuclear Operating Company, Inc. Southern Nuclear Operating Company, Inc. |
| | Electronic Mail Distribution Electronic Mail Distribution T. A. Lynch N. J. Stringfellow Vice President Licensing Manager Joseph M. Farley Nuclear Plant Southern Nuclear Operating Company, Inc. |
| | Southern Nuclear Operating Company, Inc. Electronic Mail Distribution Electronic Mail Distribution (cc w/encls contd - See page 3) |
|
| |
|
| Southern Nuclear Operating Company, Inc. | | D. Madison 3 cc w/encls contd: Arthur H. Domby, Esq. |
| Electronic Mail Distribution | | L. P. Hill Troutman Sanders Licensing Supervisor Electronic Mail Distribution Southern Nuclear Operating Company, Inc. |
| | Electronic Mail Distribution James C. Hardeman Environmental Radiation Program Manager L. L. Crumpton Environmental Protection Division Administrative Assistant, Sr. Georgia Department of Natural Resources Southern Nuclear Operating Company, Inc. Electronic Mail Distribution Electronic Mail Distribution Chuck Mueller Steven B. Tipps Manager Hatch Principal Engineer - Licensing Policy and Radiation Program Edwin I. Hatch Nuclear Plant Georgia Department of Natural Resources Electronic Mail Distribution Electronic Mail Distribution W. E. Duvall Cynthia A. Sanders Site Support Manager Radioactive Materials Program Manager Edwin I. Hatch Nuclear Plant Environmental Protection Division Electronic Mail Distribution Georgia Department of Natural Resources Electronic Mail Distribution Senior Resident Inspector U.S. Nuclear Regulatory Commission Mr. Steven M. Jackson Edwin I. Hatch Nuclear Plant Senior Engineer - Power Supply U.S. NRC Municipal Electric Authority of Georgia 11030 Hatch Parkway N Electronic Mail Distribution Baxley, GA 31513 Reece McAlister Mr. Ken Rosanski Executive Secretary Resident Manager Georgia Public Service Commission Edwin I. Hatch Nuclear Plant Electronic Mail Distribution Oglethorpe Power Corporation Electronic Mail Distribution Chairman Appling County Commissioners Mark Williams County Courthouse Commissioner 69 Tippins Street, Suite 201 Georgia Department of Natural Resources Baxley, GA 31513 Electronic Mail Distribution Amy Whaley Jerry Ranalli Resident Manager Municipal Electric Authority of Georgia Electronic Mail Distribution Power Electronic Mail Distribution Lee Foley Manager of Contracts Generation Oglethorpe Power Corporation Electronic Mail Distribution |
|
| |
|
| David R. Vineyard Plant Manager Edwin I. Hatch Nuclear Plant
| | D. Madison 4 Letter to Dennis R. Madison from Frank Ehrhardt dated April 22, 2013 |
|
| |
|
| Southern Nuclear Operating Company, Inc.
| | ==SUBJECT:== |
| Electronic Mail Distribution
| | PUBLIC MEETING |
|
| |
|
| S. Kuczynski Chairman, President and CEO
| | ==SUMMARY== |
| | | - EDWIN I. HATCH NUCLEAR PLANT DOCKET NOS. 50-321 AND 50-366 Distribution w/encls: |
| Southern Nuclear Operating Company, Inc.
| | C. Evans, RII L. Douglas, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMHatch Resource |
| Electronic Mail Distribution
| |
| | |
| Todd L. Youngblood Vice President
| |
| | |
| Fleet Oversight
| |
| | |
| Southern Nuclear Operating Company, Inc.
| |
| Electronic Mail Distribution
| |
| | |
| Leigh Perry SVP & General Counsel-Ops & SNC
| |
| | |
| Southern Nuclear Operating Company, Inc.
| |
| Electronic Mail Distribution
| |
| | |
| D. G. Bost Chief Nuclear Officer
| |
| | |
| Southern Nuclear Operating Company, Inc.
| |
| Electronic Mail Distribution
| |
| | |
| Paula Marino Vice President Engineering
| |
| | |
| Southern Nuclear Operating Company, Inc.
| |
| Electronic Mail Distribution
| |
| | |
| T. A. Lynch Vice President
| |
| | |
| Joseph M. Farley Nuclear Plant
| |
| | |
| Southern Nuclear Operating Company, Inc.
| |
| Electronic Mail Distribution Dennis R. Madison Vice President Edwin I. Hatch Nuclear Plant
| |
| | |
| Southern Nuclear Operating Company, Inc.
| |
| Electronic Mail Distribution
| |
| | |
| T. E. Tynan Site Vice President Vogtle Electric Generating Plant
| |
| | |
| Southern Nuclear Operating Company, Inc.
| |
| Electronic Mail Distribution C. R. Pierce Nuclear Licensing Director
| |
| | |
| Southern Nuclear Operating Company, Inc.
| |
| Electronic Mail Distribution B. D. McKinney, Jr.
| |
| Regulatory Response Manager
| |
| | |
| Southern Nuclear Operating Company, Inc.
| |
| Electronic Mail Distribution
| |
| | |
| D. W. Daughhetee Licensing Engineer
| |
| | |
| Southern Nuclear Operating Company, Inc.
| |
| Electronic Mail Distribution
| |
| | |
| T. D. Honeycutt Regulatory Response Supervisor
| |
| | |
| Southern Nuclear Operating Company, Inc.
| |
| Electronic Mail Distribution
| |
| | |
| Bradley J. Adams Vice President Fleet Operations Support
| |
| | |
| Southern Nuclear Operating Company, Inc.
| |
| Electronic Mail Distribution
| |
| | |
| N. J. Stringfellow Licensing Manager
| |
| | |
| Southern Nuclear Operating Company, Inc.
| |
| Electronic Mail Distribution
| |
| | |
| (cc w/encls cont'd - See page 3)
| |
| D. Madison 3 cc w/encls cont'd:
| |
| L. P. Hill Licensing Supervisor
| |
| | |
| Southern Nuclear Operating Company, Inc.
| |
| Electronic Mail Distribution
| |
| | |
| L. L. Crumpton Administrative Assistant, Sr.
| |
| Southern Nuclear Operating Company, Inc.
| |
| Electronic Mail Distribution
| |
| | |
| Steven B. Tipps Hatch Principal Engineer - Licensing Edwin I. Hatch Nuclear Plant Electronic Mail Distribution
| |
|
| |
|
| W. E. Duvall Site Support Manager Edwin I. Hatch Nuclear Plant Electronic Mail Distribution
| | NRC Annual Assessment Summary Edwin I. Hatch Nuclear Plant Southern Nuclear operated the plant safely and in a manner that preserved the public health and safety and protected the environment. |
| | Edwin I. Hatch Nuclear Plant was in the Licensee Response Column of the NRCs ROP Action Matrix for the last quarter of 2012. |
| | Enclosure 2 |
|
| |
|
| Senior Resident Inspector U.S. Nuclear Regulatory Commission Edwin I. Hatch Nuclear Plant U.S. NRC 11030 Hatch Parkway N Baxley, GA 31513
| | 2 NRC Inspection Activities Edwin I. Hatch Nuclear Plant for 2012 Two Resident Inspectors on Site Implemented baseline inspection program Inspected in-plant evolutions and activities Compiled and submitted quarterly inspection reports Two Major Team Inspections Component Design Bases Initial License Examination Enclosure 2 |
|
| |
|
| Mr. Ken Rosanski Resident Manager Edwin I. Hatch Nuclear Plant Oglethorpe Power Corporation Electronic Mail Distribution
| | 3 NRC Plans for 2013 NRC plans baseline inspections at Edwin I. |
| | Hatch Nuclear Plant for the remainder of 2013 Major Team Inspections Include: |
| | Problem Identification and Resolution Initial License Examination Plant Modifications Inspection Emergency Preparedness Exercise Triennial Fire Protection Inspection License Renewal Phase 2 Enclosure 2 |
|
| |
|
| Mark Williams Commissioner
| | 4 Reactor Oversight Process Strategic Performance Areas Safety Cornerstones Baseline Inspection Performance Indicator Results Results Significance Significance Significance Threshold Threshold Threshold Action Matrix Regulatory Response Enclosure 2 |
|
| |
|
| Georgia Department of Natural Resources Electronic Mail Distribution
| | 5 Reactor Oversight Process Regulatory Framework PUBLIC HEALTH AND NRCs Overall SAFETY AS A RESULT OF CIVILIAN Safety Mission NUCLEAR REACTOR OPERATION Strategic Performance REACTOR RADIATION PLANT SAFETY SAFETY SECURITY Areas INITIATING MITIGATING BARRIER EMERGENCY PUBLIC OCCUPATIONAL PHYSICAL Cornerstones EVENTS SYSTEMS INTEGRITY PREPAREDNESS RADIATION RADIATION PROTECTION SAFETY SAFETY Human Performance Safety Conscious Work Problem Identification Environment and Resolution Cross-Cutting Areas Enclosure 2 |
|
| |
|
| Jerry Ranalli Municipal Electric Authority of Georgia Power Electronic Mail Distribution
| | Edwin I. Hatch Nuclear Plant Annual Assessment Meeting 2012 Reactor Oversight Process Nuclear Regulatory Commission - Region II Enclosure 3 |
| | |
| Lee Foley Manager of Contracts Generation Oglethorpe Power Corporation Electronic Mail Distribution
| |
| | |
| Arthur H. Domby, Esq.
| |
| Troutman Sanders Electronic Mail Distribution
| |
| | |
| James C. Hardeman Environmental Radiation Program Manager Environmental Protection Division Georgia Department of Natural Resources Electronic Mail Distribution
| |
| | |
| Chuck Mueller
| |
| | |
| Manager Policy and Radiation Program Georgia Department of Natural Resources Electronic Mail Distribution
| |
| | |
| Cynthia A. Sanders Radioactive Materials Program Manager Environmental Protection Division
| |
| | |
| Georgia Department of Natural Resources Electronic Mail Distribution
| |
| | |
| Mr. Steven M. Jackson Senior Engineer - Power Supply Municipal Electric Authority of Georgia Electronic Mail Distribution
| |
| | |
| Reece McAlister Executive Secretary Georgia Public Service Commission Electronic Mail Distribution
| |
| | |
| Chairman Appling County Commissioners County Courthouse 69 Tippins Street, Suite 201 Baxley, GA 31513
| |
| | |
| Amy Whaley Resident Manager Electronic Mail Distribution
| |
| | |
| D. Madison 4 Letter to Dennis R. Madison from Frank Ehrhardt dated April 22, 2013
| |
| | |
| ==SUBJECT:==
| |
| PUBLIC MEETING
| |
| | |
| ==SUMMARY==
| |
| - EDWIN I. HATCH NUCLEAR PLANT DOCKET NOS. 50-321 AND 50-366 Distribution w/encls
| |
| : C. Evans, RII L. Douglas, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMHatch Resource
| |
|
| |
|
| Enclosure 1 | | 2 Enclosure 3 |
|
| |
|
| Enclosure 2 NRC Annual Assessment SummarySouthern Nuclear operated the plant safely and in a manner that preserved the public health and safety and protected the environment.Edwin I. Hatch Nuclear Plant was in the Licensee Response Column of the NRC's ROP Action Matrix for the last quarter of 2012.Edwin I. Hatch Nuclear Plant 2 Enclosure 2 NRC Inspection ActivitiesTwo Resident Inspectors on SiteImplemented baseline inspection programInspected in-plant evolutions and activitiesCompiled and submitted quarterly inspection reportsTwo Major Team InspectionsComponent Design BasesInitial License ExaminationEdwin I. Hatch Nuclear Plant for 2012
| | 3 Significance Threshold Performance Indicators Green Baseline Inspection White Requires additional NRC oversight Yellow Requires more NRC oversight Red Requires most NRC oversight Inspection Findings Green Very low safety issue White Low to moderate safety issue Yellow Substantial safety issue Red High safety issue Enclosure 3 |
|
| |
|
| 3 Enclosure 2 NRC Plans for 2013NRC plans baseline inspections at Edwin I. Hatch Nuclear Plant for the remainder of 2013 Major Team Inspections Include:Problem Identification and ResolutionInitial License ExaminationPlant Modifications InspectionEmergency Preparedness ExerciseTriennial Fire Protection InspectionLicense Renewal Phase 2 4 Enclosure 2 Reactor Oversight ProcessSafetyCornerstonesBaseline Inspection ResultsSignificance ThresholdAction MatrixSignificance ThresholdPerformance IndicatorResultsStrategicPerformance AreasSafetyCornerstonesBaseline Inspection ResultsSignificance ThresholdAction MatrixSignificance ThresholdPerformance IndicatorResultsRegulatory ResponseStrategicPerformance Areas 5 Enclosure 2 Reactor Oversight Process Regulatory Framework NRC's Overall Safety MissionPUBLIC HEALTH AND SAFETY AS A RESULT OF CIVILIAN NUCLEAR REACTOR OPERATIONREACTOR SAFETY Strategic Performance AreasRADIATION SAFETYPLANT SECURITYCornerstonesINITIATING EVENTSMITIGATING SYSTEMSBARRIER INTEGRITYEMERGENCY PREPAREDNESSPUBLIC RADIATION SAFETYOCCUPATIONAL RADIATION SAFETYPHYSICAL PROTECTIONHuman PerformanceSafety Conscious Work EnvironmentProblem Identification and ResolutionCross-Cutting Areas Enclosure 3 Edwin I. Hatch Nuclear Plant Annual Assessment Meeting2012 Reactor Oversight ProcessNuclear Regulatory Commission -Region II
| | 4 NRC Annual Assessment Summary Edwin I. Hatch Nuclear Plant Southern Nuclear operated the plant safely and in a manner that preserved the public health and safety and protected the environment. |
| | Edwin I. Hatch Nuclear Plant was in the Licensee Response Column of the NRCs ROP Action Matrix for the last quarter of 2012. |
| | Enclosure 3 |
|
| |
|
| 2 Enclosure 3 3 Enclosure 3 Significance ThresholdGreenBaseline InspectionWhiteRequires additional NRC oversightYellowRequires more NRC oversightRedRequires most NRC oversightPerformance Indicators Inspection FindingsGreenVery low safety issueWhiteLow to moderate safety issueYellowSubstantial safety issueRedHigh safety issue 4 Enclosure 3 NRC Annual Assessment SummarySouthern Nuclear operated the plant safely and in a manner that preserved the public health and safety and protected the environment.Edwin I. Hatch Nuclear Plant was in the Licensee Response Column of the NRC's ROP Action Matrix for the last quarter of 2012.Edwin I. Hatch Nuclear Plant
| | 5 NRC Inspection Activities Edwin I. Hatch Nuclear Plant for 2012 Two Resident Inspectors on Site Implemented baseline inspection program Inspected in-plant evolutions and activities Compiled and submitted quarterly inspection reports Two Major Team Inspections Component Design Bases Initial License Examination Enclosure 3 |
|
| |
|
| 5 Enclosure 3 NRC Inspection ActivitiesTwo Resident Inspectors on SiteImplemented baseline inspection programInspected in-plant evolutions and activitiesCompiled and submitted quarterly inspection reportsTwo Major Team InspectionsComponent Design BasesInitial License ExaminationEdwin I. Hatch Nuclear Plant for 2012
| | 6 Edwin I. Hatch Nuclear Plant Performance Indicators and Findings January 1 through December 31, 2012 All Green Performance Indicators All Green / Severity Level IV inspection findings Enclosure 3 |
|
| |
|
| 6 Enclosure 3 Edwin I. Hatch Nuclear Plant Performance Indicators and FindingsAll Green Performance IndicatorsAll Green / Severity Level IV inspection findingsJanuary 1 through December 31, 2012
| | 7 NRC Plans for 2013 NRC plans baseline inspections at Edwin I. |
| | Hatch Nuclear Plant for the remainder of 2013 Additional Major Inspections Include: |
| | Problem Identification and Resolution Initial License Examination Plant Modifications Inspection Emergency Preparedness Exercise Triennial Fire Protection Inspection License Renewal Phase 2 Enclosure 3 |
|
| |
|
| 7 Enclosure 3 NRC Plans for 2013NRC plans baseline inspections at Edwin I. Hatch Nuclear Plant for the remainder of 2013Additional Major Inspections Include:Problem Identification and ResolutionInitial License ExaminationPlant Modifications InspectionEmergency Preparedness ExerciseTriennial Fire Protection InspectionLicense Renewal Phase 2
| | 8 Enclosure 3 |
|
| |
|
| 8 Enclosure 3 9 Enclosure 3}}
| | 9 Enclosure 3}} |
Similar Documents at Hatch |
---|
Category:Letter
MONTHYEARML24299A2222024-10-31031 October 2024 Audit Summary for License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components ML24292A1602024-10-22022 October 2024 Request for Withholding Information from Public Disclosure License Amendment Request to Revise Technical Specification Surveillance Requirements to Increase Safety/Relief Valve Setpoints ML24290A0792024-10-18018 October 2024 SLR Environmental Preapplication Meeting Summary ML24303A4102024-10-17017 October 2024 Dir Results Letter to NRC - Hatch - Hurricane Helene IR 05000321/20244012024-10-10010 October 2024 Security Baseline Inspection Report 05000321-2024401 and 05000366-2024401 ML24256A0282024-09-12012 September 2024 2024 Hatch Requal Inspection Corporate Notification Letter NL-23-0930, Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program2024-09-11011 September 2024 Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program NL-24-0337, Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program2024-09-0909 September 2024 Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 NL-24-0334, 0 to the Updated Final Safety Analysis Report, Technical Specifications Bases Changes, Technical Requirements Manual Changes, License Renewal 10 CFR 54 .37(b) Changes, 10 CFR 50.59 Summary Report & Revised Nrc2024-09-0303 September 2024 0 to the Updated Final Safety Analysis Report, Technical Specifications Bases Changes, Technical Requirements Manual Changes, License Renewal 10 CFR 54 .37(b) Changes, 10 CFR 50.59 Summary Report & Revised Nrc IR 05000321/20240912024-08-27027 August 2024 NRC Investigation Report 2-2023-003 and NOV - NRC Inspection Report 05000321/2024091 and 05000366/2024091 IR 05000321/20240052024-08-26026 August 2024 Updated Inspection Plan for Edwin I. Hatch Nuclear Plant, Units 1 and 2 - Report 05000321/2024005 and 05000366/2024005 NL-24-0313, Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint Response to Request for Additional Information2024-08-23023 August 2024 Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint Response to Request for Additional Information IR 05000321/20240022024-08-0808 August 2024 Edwin I Hatch Nuclear Plants, Units 1 and 2 – Integrated Inspection Report 05000321-2024002 and 05000366-2024002 NL-24-0290, Response to Request for Additional Information Related to Request for Specific Exemption2024-07-26026 July 2024 Response to Request for Additional Information Related to Request for Specific Exemption NL-24-0276, Post-Audit Supplement to License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components2024-07-26026 July 2024 Post-Audit Supplement to License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components NL-24-0261, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20232024-07-19019 July 2024 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2023 ML24198A1252024-07-16016 July 2024 Edwin I Hatch Nuclear Plant Units 1 - 2 Notification of Conduct of Title 10 of the Code of Federal Regulations 50 NL-24-0260, Inservice Inspection Program Owner’S Activity Report (OAR-1) for Refueling Outage 1R312024-07-0909 July 2024 Inservice Inspection Program Owner’S Activity Report (OAR-1) for Refueling Outage 1R31 05000321/LER-2024-003, Reactor Core Isolation Cooling (RCIC) System Inoperable Due to Mispositioned Link2024-07-0303 July 2024 Reactor Core Isolation Cooling (RCIC) System Inoperable Due to Mispositioned Link 05000321/LER-2024-002-01, Incorrectly Installed Temporary Modification Results in Multiple Conditions Prohibited by Plant Technical Specifications2024-07-0303 July 2024 Incorrectly Installed Temporary Modification Results in Multiple Conditions Prohibited by Plant Technical Specifications NL-24-0143, Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in2024-06-27027 June 2024 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in NL-24-0239, Response to Apparent Violation in NRC Inspection Report 05000321, 366/2024090: EA-23-1392024-06-17017 June 2024 Response to Apparent Violation in NRC Inspection Report 05000321, 366/2024090: EA-23-139 ML24163A0532024-06-14014 June 2024 Audit Plan - Alternative Seismic Method LAR ML24149A0492024-06-0404 June 2024 SNC Fleet - Regulatory Audit in Support of Review of the License Amendment Request to Revise TS 1.1, Use and Application Definitions, and Add New Technical Specification 5.5.21 and 5.5.17, Online Monitoring Program, NL-24-0148, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2024-06-0404 June 2024 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-24-0202, SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations2024-05-24024 May 2024 SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations IR 05000321/20240902024-05-15015 May 2024 NRC Inspection Report 05000321-2024090 and 05000366-2024090, Investigation Report 2-2023-003; and Apparent Violation NL-24-0191, Annual Radiological Environmental Operating Reports for 20232024-05-10010 May 2024 Annual Radiological Environmental Operating Reports for 2023 05000321/LER-2024-002, Manual Reactor Trip Due to Loss of Feedwater2024-05-0909 May 2024 Manual Reactor Trip Due to Loss of Feedwater NL-24-0195, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water.2024-05-0707 May 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water. NL-24-0064, Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.52024-05-0303 May 2024 Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.5 IR 05000032/20240112024-04-25025 April 2024 Notification of Edwin I. Hatch Nuclear Plant - Comprehensive Engineering Team Inspection (CETI) Baseline Inspection Report 0500032/2024011 and 05000366/2024011 NL-24-0165, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20232024-04-25025 April 2024 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2023 05000366/LER-2024-002, Incorrectly Installed Temporary Modification Results in a Condition Prohibited by Plant Technical Specifications2024-04-24024 April 2024 Incorrectly Installed Temporary Modification Results in a Condition Prohibited by Plant Technical Specifications IR 05000321/20240012024-04-22022 April 2024 Integrated Inspection Report 05000321/2024001 and 05000366/2024001 NL-24-0026, Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint2024-04-19019 April 2024 Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint 05000321/LER-2024-001, Primary Containment Penetration Exceeded Maximum Allowable Primary Containment Leakage Rate (La)2024-04-0909 April 2024 Primary Containment Penetration Exceeded Maximum Allowable Primary Containment Leakage Rate (La) NL-24-0115, Response to Request for Additional Information Exemption Requests for Physical.2024-04-0404 April 2024 Response to Request for Additional Information Exemption Requests for Physical. NL-24-0116, Nuclear Property Insurance Coverage as of April 1, 2024 and Licensee Guarantees of Payment of Deferred.2024-03-29029 March 2024 Nuclear Property Insurance Coverage as of April 1, 2024 and Licensee Guarantees of Payment of Deferred. NL-24-0062, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2024-03-12012 March 2024 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-24-0089, Correction of Technical Specification Omission2024-03-0909 March 2024 Correction of Technical Specification Omission ML24069A0012024-03-0909 March 2024 – Correction of Amendment No. 266 Regarding License Amendment Request Regarding Relocation of Specific Surveillance Frequencies to a Licensee-Controlled Program (TSTF-425, Revision 3) ML24047A0362024-03-0404 March 2024 Response to Hatch and Vogtle FOF Dates Change Request (2025) NL-24-0061, Cycle 32 Core Operating Limits Report Version 12024-03-0101 March 2024 Cycle 32 Core Operating Limits Report Version 1 IR 05000321/20230062024-02-28028 February 2024 Annual Assessment Letter Edwin I. Hatch Nuclear Plant Units 1 and 2 - Nrc Inspection Report 05000321/2023006 and 05000366/2023006 NL-24-0067, 10 CFR 72.48(d)(2) Biennial Report2024-02-26026 February 2024 10 CFR 72.48(d)(2) Biennial Report NL-24-0051, License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components2024-02-20020 February 2024 License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components NL-24-0042, Response to Request for Additional Information Exemption Requests for Physical Barriers2024-02-13013 February 2024 Response to Request for Additional Information Exemption Requests for Physical Barriers NL-24-0033, Response to Question for Withholding Information from Public Disclosure Exemption Requests for Physical Barriers2024-02-0505 February 2024 Response to Question for Withholding Information from Public Disclosure Exemption Requests for Physical Barriers 2024-09-09
[Table view] Category:Meeting Briefing Package/Handouts
MONTHYEARML24295A1842024-10-16016 October 2024 SNC Slides - Hatch Public Pre-Submittal Meeting on Oct 30, 2024 - Change EDG SRs 3.8.1.2 & 3.8.1.5 Load Bands ML24278A0012024-09-19019 September 2024 SLR Environmental Pre-Application Meeting - Southern Nuclear Corporation Presentation Slides ML24263A0822024-09-19019 September 2024 SLR Pre-Application Meeting - NRC Presentation Slides ML24123A0502024-05-0202 May 2024 2023 Annual Assessment Public Meeting Summary Meeting Number 20240479 ML23361A1092024-01-0808 January 2024 SNC Slides for Public Meeting on 1-8-24 to Discuss Hatch LAR - Revise TS Table 1.1-1 (Modes) to Relax Required No. of Fully Tensioned RPV Head Closure Studs ML23361A0812024-01-0808 January 2024 SNC Slides - Pre-Submittal Public Meeting on January 8, 2024 Related to Fleet QATR ML23079A2362023-03-20020 March 2023 Annual Assessment Meeting Presentation Slides ML22209A1872022-07-28028 July 2022 Pre-Submittal Meeting on August 1, 2022 Re Plant Hatch LAR: Relaxation of Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs (EPID L-2022-LRM-0052) (Slides) ML22167A1402022-06-22022 June 2022 Pre-Submittal Public Meeting Slides for Rewrite TS-3.7.2 License Amendment ML22080A0192022-03-18018 March 2022 Annual Assessment Meeting Presentation ML21225A0312021-08-31031 August 2021 Pre-Submittal Meeting - Request to Eliminate the Requirement for Automatic Main Steam Isolation on High Turbine Building Area Temperature ML21222A0342021-08-16016 August 2021 SNC Slides - Hatch TSTF-505 LAR - Pre-Submittal Meeting - 08-16-2021 ML20318A1032020-11-12012 November 2020 SNC ERO Staffing LAR RAI Responses ML20217L4312020-08-13013 August 2020 Edwin I Hatch, Units 1 and 2; and Vogtle Electric Plant, Units 1, 2, 3, and 4 - Meeting Slides a License Amendment Request for the Emergency Plan (EPID Nos L-2020-LLA-0150 and L-2020-LLA-051 ML20156A0012020-06-0404 June 2020 Slides - SNC Slides - Pre-Submittal Meeting on June 10, 2020 - Hatch EDG AOT Extension ML20101K6582020-04-10010 April 2020 Annual Assessment ML19025A0242019-01-25025 January 2019 SNC License Amendment Request for Proposed Changes to Emergency Response Organization Staffing and Augmentation ML18234A4712018-08-23023 August 2018 NRC-Pre Submittal Meeting TSTF-51 for Hatch and TSTF-51 and -471 for Farley - August 23, 2018 ML18136A8902018-05-16016 May 2018 May 21, 2018 Slides for Public Teleconference Regarding Changes to Hatch, Farley, and Vogtle TS 5.2.2.g ML18124A0052018-05-0404 May 2018 Summary of Public Meeting - Hatch Nuclear Plant Docket Nos. 50-321, 50-366 ML18066A0302018-03-0101 March 2018 Slides for March 1, 2018 Public Meeting ML17009A3832017-01-0909 January 2017 Degraded Voltage Pre-Submittal Public Meeting Slides ML16174A0272016-06-21021 June 2016 Revised NRC-SNC Hatch NFPA 805 Extension 06212016 ML16169A0612016-06-20020 June 2016 SNC Slides for 6-21-16 Public Meeting on Hatch NFPA 805 Extension ML15191A4872015-07-13013 July 2015 Unit 2: Plant Service Water Piping Replacement Using High Density Polyethylene (Hdpe) Piping Nrc/Snc Meeting July 13, 2015 ML15106A2042015-04-22022 April 2015 April 22, 2015, Meeting with Southern Nuclear Company, Slide Presentation ML14176B2392014-06-26026 June 2014 Southern Nuclear Operating Company Seismic Reevaluation - GMRS NTTF 2.1 Presentation Slides ML14177A0862014-06-26026 June 2014 NRC Presentation Slides for Public Meeting with Southern on Seismic Reevaluation (GMRS) ML14115A4102014-04-25025 April 2014 Summary of Public Meeting to Discuss Annual Assessment of Edwin I. Hatch Nuclear Plant, Units 1 and 2, in Vidalia, Georgia ML13112A2552013-04-22022 April 2013 Summary of Public Meeting to Discuss the Annual Assessment of Edwin I. Hatch Nuclear Plant with the Public for the Period of January 1, 2012, - December 31, 2012 ML13025A3012013-01-29029 January 2013 NRC Comments on Draft Integrated Plans, Hatch ML13015A2682012-12-17017 December 2012 Draft Submittal Order EA-12-049 - February 2013 FLEX Integrated Plan- Hatch ML12115A2572012-04-24024 April 2012 Summary of with Southern Nuclear Operating Co., Inc., to Discuss the Annual Assessment of Edwin I. Hatch for 2011 ML1111900612011-04-28028 April 2011 Summary of Public Meeting with Southern Nuclear Operating Company, Inc., to Discuss the Nrc'S Reactor Oversight Process and the Nrc'S Annual Assessment of Plant Safety Performance at Hatch for the Period of 01/01/210 - 12/31/2010 ML11090A0912011-04-0505 April 2011 Plant Hatch Fire Risk Monitoring ML1028105222010-10-0808 October 2010 September 29, 2010 Summary O Public Meeting with Farley to Discuss Corrective Actions Associated with Two White Regulatory Performance Public Meeting Summary ML1011304442010-04-23023 April 2010 Summary of Public Meeting to Discuss the Annual Assessment of Edwin I. Hatch for the Period of January 1, 2009 Through December 31, 2009 ML0910607322009-04-16016 April 2009 Summary of Meeting with Southern Nuclear Operating Co, Inc., to Provide Opportunities to Discuss Annual Assessment of Edwin I. Hatch for the Period of 01/01/2008 - 12/31/08 ML1019404512008-08-20020 August 2008 RA Drop-In Briefing Sheet - Hatch, Dated August 20, 2008 ML0810704462008-04-0909 April 2008 Annual Assessment Public Meeting, Slides ML0810704522008-04-0909 April 2008 Annual Assessment Public Meeting of Attendee List ML0723505462007-08-23023 August 2007 08/15/2007 Public Meeting Summary - Enclosure 2 ML0715902092007-05-31031 May 2007 Enclosure 7 - Definitions: SSE (Safe Shutdown Earthquake) & OBE (Operating Basis Earthquake) ML0717004662007-05-31031 May 2007 05/2007 Generation Planning Overview. ML0632800652006-11-14014 November 2006 Meeting Summary Handouts, Enclosure 2 (Tac Nos. MD2934 and MD2935) ML0611505512006-04-12012 April 2006 Slides for Annual Assessment Meeting Cy 2005 ML0536202702005-12-12012 December 2005 Enclosure 4 to Summary of Public Meeting with the Boiling Water Reactor Owner'S Group to Discuss 10 CFR Part 21 Report on Safety Limit 2.1.1.1 of NUREG 1433/34 ML0534700922005-11-29029 November 2005 Hatch, Units 1 & 2, Enclosure, Meeting Summary, Generic Letter 2003-01 ML0511501292005-04-13013 April 2005 List of Meeting Attendees for the Annual Assessment Meeting Cy 2004, Edwin I. Hatch Nuclear Plant - NRC Region II, Vidalia, Ga, April 13, 2005 ML0331603242003-11-0606 November 2003 Praire Island Meeting Handout Re Planned License Amendment Requests Using Alternate Source Term 2024-09-19
[Table view] Category:Meeting Summary
MONTHYEARML24290A0792024-10-18018 October 2024 SLR Environmental Preapplication Meeting Summary ML24213A2462024-08-0505 August 2024 Summary of Closed Meeting SNC Fleet - Physical Barriers Exemption ML24156A1772024-06-11011 June 2024 Summary of June 6, 2024, Closed Meeting Held with Southern Nuclear Operating Company, Inc., Regarding the Physical Barrier Exemptions for Joseph M. Farley Nuclear Plant, Units 1 and 2, Edwin I. Hatch Nuclear Plant, Units 1 and 2, and Vogtle ML24123A0502024-05-0202 May 2024 2023 Annual Assessment Public Meeting Summary Meeting Number 20240479 ML24019A1932024-01-30030 January 2024 Summary of January 8, 2024, Observation Pre-Submittal Meeting Held with Southern Nuclear Operating Company Regarding a Proposed LAR for Vogtle Electric Generating Plant, Units 1, 2, 3, & 4; Hatch, Units 1 & 2; Farley, Units 1 & 2 ML24012A1592024-01-30030 January 2024 Summary of January 8, 2024, Meeting Held with Southern Nuclear Operating Company, Inc., to Discuss a RAI License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Head Bolts ML23356A0282023-12-27027 December 2023 December 11, 2023, Pre-Application Meeting with SNC Regarding a Proposed Fleet LAR to Revise TS 5.3.1 to Relocate Training Qualification Requirements from TS to Their Qatr/Ndqam ML23338A2592023-12-0808 December 2023 Summary of Observation Public Meeting Held with Southern Nuclear Operating Company, Inc., Regarding a License Amendment Request for the Reactor Pressure Vessel Head Closure Bolts for Hatch, Units 1 & 2 (EPID No. L-2022-LLA- 0120) ML23311A1302023-11-17017 November 2023 Summary of Nov. 6, 2023, - Closed Meeting Held with Southern Nuclear Operating Company, Inc., Regarding Physical Barriers Exemptions for Hatch Units 1 & 2, Farley Units 1 & 2 and Vogtle Units 1, 2, 3 & 4 (EPID L-2023-LLE-0018 & L-2023-LLE-0 ML23244A0312023-09-18018 September 2023 MTS - Meeting Summary - Pre-Submittal Meeting on August 02, 2023 - RICT 45-day Extension for TS 3.7.1 & 3.7.2 ML23136B2942023-05-19019 May 2023 Summary of May 02, 2023, Observation Public Meeting Held with Southern Nuclear Operating Company, Inc., Regarding a LAR for the Reactor Pressure Vessel Head Closure Bolts for Edwin I. Hatch Nuclear Plant, Units 1 and 2 ML23088A3882023-04-0303 April 2023 Summary of March 28, 2023, Observation Public Meeting Held with SNC, Regarding a License Amendment Request Regarding the Reactor Pressure Vessel Head Closure Bolts for Edwin I. Hatch Nuclear Plan, Units 1 and 2 ML23088A2362023-03-28028 March 2023 SNC Presentation - Public Meeting - 03-28-2023 - Page from ML22231B055 ML22243A1912022-09-0707 September 2022 Public Pre-Submittal Meeting on August 1, 2022 - Revise TS Table 1.1-1 Modes to Relax RPV Head Closure Studs ML22200A0432022-07-22022 July 2022 Summary of June 22, 2022, Pre-Submittal Meeting W/Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Request to Re-Write TS 3.7.2, Plant Service Water and Ultimate Heat Sink for Edwin I. Hatch Nuclear ML22108A1382022-04-18018 April 2022 Annual Assessment Public Meeting Summary ML21278A5572021-10-25025 October 2021 Meeting Summary - Pre-Submittal Meeting on October 5, 2021 - Hatch NFPA 805 License Amendment Request ML21251A5372021-09-20020 September 2021 September 7, 2021, Summary of Follow-Up, Public, Pre-Licensing Meeting with Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Request to Adopt TSTF-505 for Edwin I. Hatch Nuclear Plant, Units 1 and 2 ML21229A0072021-09-10010 September 2021 Summary of Public Meeting with Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Request to Adopt TSTF-505 ML21232A2622021-09-0101 September 2021 Summary of Public Meeting with Southern Nuclear Operating Company Regarding Proposed LAR to Remove Function 1.f (Main Steam Line Isolation-Turbine Building Area Temperature-High) from TS Table 3.3.6.1A-7 for Hatch Units 1&2 (L-2021-LRM-0081 ML21124A1232021-05-0404 May 2021 April 27, 2021, Public Meeting Summary Joseph M. Farley Nuclear Plant Units 1 and 2, Edwin I. Hatch Nuclear Plant Units 1 and 2, Docket No. 50-348, 50-364, 50-321, 50-366, Meeting Number ML21117A030 ML21102A3112021-04-19019 April 2021 Corrected - 03/31/2021 Summary of Public Meeting with Southern Nuclear Operating Company, Inc., Regarding a Proposed Licensing Action Request to Change the Quality Assurance Topical Report ML21092A0082021-04-0808 April 2021 Summary of March 31, 2021, Public Meeting with Southern Nuclear Operating Company, Inc., Regarding a Proposed Licensing Action Request to Change the Technical Specification Related to Heat Flux Hot Channel Factor ML21028A0532021-02-0303 February 2021 Summary of Public Meeting with Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Request to Supplement National Fire Protection Association (NFPA)-805, Performance-Based Standard for Fire Protection for ML20318A0752020-11-16016 November 2020 Summary of November 12, 2020, Public Meeting with Southern Nuclear Operating Company, Inc., Regarding a License Amendment Request for the Emergency Plan ML20289A4242020-11-0404 November 2020 Summary of Public Meeting with Southern Nuclear Operating Company, Inc. Regarding Proposed License Amendment Request to Remove Function 1.f from Technical Specification Table 3.3.6.1A-7 for Hatch, Units 1 and 2 ML20217L3692020-08-13013 August 2020 Summary of Meeting Joseph M. Farley Nuclear Plant, Units 1 and 2; Edwin I. Hatch, Units 1 and 2; and Vogtle Electric Generating Plant, Units 1, 2, 3, and 4 a LAR for the Emergency Plan (EPID Nos. L-2020-LLA0150 and L-2020-LLA-015 ML20162A1622020-06-16016 June 2020 June 10, 2020, Summary of Public Mtg with Southern Nuclear Operating Company, Inc., a Proposed License Amendment Request for a One-Time Completion Time for the Emergency Diesel Generator Using a Risk-Informed Approach ML20154K7242020-06-0202 June 2020 EOC Meeting Summary ML19123A3542019-05-0202 May 2019 Public Meeting Summary - Hatch Nuclear Plant, Docket Nos. 50-321 and 50-366 ML19114A0062019-04-30030 April 2019 Summary of July 31, 2018, Pre-Application Meeting with Southern Nuclear to Discuss Proposed Changes to Secondary Containment Technical Specifications (EPID L-2018-LEM-0047 ML19038A3462019-02-15015 February 2019 Summary of Meeting with the Nuclear Regulatory Commission and Southern Nuclear Operating Company, Inc. Regarding Pre-Submittal of a License Amendment Request for Proposed Changes to Emergency Response Organization Staffing and Augmentation ML18284A0222018-10-16016 October 2018 August 23, 2018, Summary of Pre-Application Meeting with Southern Nuclear Operating Company, Inc. to Discuss TSTF-51 and TSTF-471 ML18142B0452018-05-24024 May 2018 Summary of May 21, 2018, Pre-submittal Public Teleconference with Southern Nuclear Operating Company, Inc. to Discuss the Upcoming License Amendment Request to Remove the Dedicated Shift Technical Advisor ML18124A0052018-05-0404 May 2018 Summary of Public Meeting - Hatch Nuclear Plant Docket Nos. 50-321, 50-366 ML17131A1572017-05-11011 May 2017 Summary of Public Meeting Concerning Annual Assessment of Edwin I. Hatch Nuclear Plant, Units 1 and 2 ML17093A9172017-04-21021 April 2017 Summary of 3/23/2017, Pre-Submittal Public Meeting with Southern Nuclear Operating Company, Inc. to Discuss the Proposed License Amendment Requests Regarding TSTF-542, Reactor Pressure Vessel Water Inventory Controls, and SR3.3.1.3 (CAC Nos ML17030A4372017-02-15015 February 2017 Summary of Public Meeting with Southern Nuclear Operating Company, Inc. to Discuss the Degraded Grid Voltage Proposed License Amendment Request ML16179A1862016-06-30030 June 2016 Summary of Public Meeting with Southern Nuclear Operating Company to Discuss Delay of Application Date for NFPA 805 License Amendment Request for Edwin I. Hatch Nuclear Plant, Units Nos. 1 and 2 ML16085A1762016-03-29029 March 2016 Summary of March 24, 2016, Meeting with Southern Nuclear Operating Company Regarding Planned Physical Protection Modifications ML15195A4812015-08-31031 August 2015 July 13, 2015, Summary of Meeting with SNC on High Density Polyethylene Piping for HNP-2 ML15125A0872015-05-26026 May 2015 May 12, 2015 Summary of Meeting with Southern Nuclear Operating Company to Discuss a Future Fleet Standard Emergency Plan Submittal ML15121A0342015-04-30030 April 2015 Summary of Public Meeting to Discuss the 2014 Annual Performance Assessment of the Edwin I. Hatch Nuclear Plant ML15103A0602015-04-30030 April 2015 April 22, 2015, Summary of Meeting with Southern Nuclear Operating Company to Discuss a Future Fleet Standard Emergency Plan Submittal ML14122A0372014-05-0808 May 2014 April 23, 2014 Summary of Meeting with Southern Nuclear Operating Company to Discuss Grid Design Criteria ML14115A4102014-04-25025 April 2014 Summary of Public Meeting to Discuss Annual Assessment of Edwin I. Hatch Nuclear Plant, Units 1 and 2, in Vidalia, Georgia ML13225A2932013-08-12012 August 2013 7/23-24/2013, Summary of Meeting 2013 U.S. Nuclear Regulatory Commission (NRC) Initial Exam Writers' Workshop ML13112A2552013-04-22022 April 2013 Summary of Public Meeting to Discuss the Annual Assessment of Edwin I. Hatch Nuclear Plant with the Public for the Period of January 1, 2012, - December 31, 2012 ML12115A2572012-04-24024 April 2012 Summary of with Southern Nuclear Operating Co., Inc., to Discuss the Annual Assessment of Edwin I. Hatch for 2011 ML11292A1612011-10-20020 October 2011 Summary of Meeting with Beyond Nuclear Regarding Their 10 CFR 2.206 Petition to Suspend Operating Licenses of General Electric Mark I Boiling Water Reactors 2024-08-05
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24295A1842024-10-16016 October 2024 SNC Slides - Hatch Public Pre-Submittal Meeting on Oct 30, 2024 - Change EDG SRs 3.8.1.2 & 3.8.1.5 Load Bands ML24278A0012024-09-19019 September 2024 SLR Environmental Pre-Application Meeting - Southern Nuclear Corporation Presentation Slides ML24263A0822024-09-19019 September 2024 SLR Pre-Application Meeting - NRC Presentation Slides ML24123A0502024-05-0202 May 2024 2023 Annual Assessment Public Meeting Summary Meeting Number 20240479 ML23361A0812024-01-0808 January 2024 SNC Slides - Pre-Submittal Public Meeting on January 8, 2024 Related to Fleet QATR ML23361A1092024-01-0808 January 2024 SNC Slides for Public Meeting on 1-8-24 to Discuss Hatch LAR - Revise TS Table 1.1-1 (Modes) to Relax Required No. of Fully Tensioned RPV Head Closure Studs ML23206A0412023-08-0202 August 2023 SNC Slides - Public Pre-Submittal Meeting on Aug 02, 2023 - Request for 45-Day Limited Extension of Risk Informed Completion Time (RICT) Program Backstop for TS 3.7.1 & 3.7.2 ML23088A2362023-03-28028 March 2023 SNC Presentation - Public Meeting - 03-28-2023 - Page from ML22231B055 ML23079A2362023-03-20020 March 2023 Annual Assessment Meeting Presentation Slides ML22209A1872022-07-28028 July 2022 Pre-Submittal Meeting on August 1, 2022 Re Plant Hatch LAR: Relaxation of Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs (EPID L-2022-LRM-0052) (Slides) ML22167A1402022-06-22022 June 2022 Pre-Submittal Public Meeting Slides for Rewrite TS-3.7.2 License Amendment ML22080A0192022-03-18018 March 2022 Annual Assessment Meeting Presentation ML21271A2022021-10-0505 October 2021 Pre-Submittal Meeting on October 5, 2021 - Hatch NFPA 805 Supplement LAR (SNC Slides) ML21225A0312021-08-31031 August 2021 Pre-Submittal Meeting - Request to Eliminate the Requirement for Automatic Main Steam Isolation on High Turbine Building Area Temperature ML21222A0342021-08-16016 August 2021 SNC Slides - Hatch TSTF-505 LAR - Pre-Submittal Meeting - 08-16-2021 ML21083A2872021-03-24024 March 2021 Pre-Submittal Meeting - Quality Assurance Topical Report Revision to Allow Application of Remote Assessment Techniques During Exigent Conditions ML21021A2462021-01-21021 January 2021 Slides - SNC Slides - Pre-Submittal Meeting on January 26, 2021 - Hatch NFPA-805 LAR ML20318A1032020-11-12012 November 2020 SNC ERO Staffing LAR RAI Responses ML20156A0012020-06-0404 June 2020 Slides - SNC Slides - Pre-Submittal Meeting on June 10, 2020 - Hatch EDG AOT Extension ML20101K6582020-04-10010 April 2020 Annual Assessment ML19123A3542019-05-0202 May 2019 Public Meeting Summary - Hatch Nuclear Plant, Docket Nos. 50-321 and 50-366 ML19025A0242019-01-25025 January 2019 SNC License Amendment Request for Proposed Changes to Emergency Response Organization Staffing and Augmentation ML18124A0052018-05-0404 May 2018 Summary of Public Meeting - Hatch Nuclear Plant Docket Nos. 50-321, 50-366 ML18066A0302018-03-0101 March 2018 Slides for March 1, 2018 Public Meeting ML17324A3462017-11-15015 November 2017 Meeting Slides for 11/15/2017, Public Meeting Between NRC and SNC Regarding Hatch License Amendment Request - Application of TSTF-423 to Drywell Spray Function Technical Specification End State ML16174A0272016-06-21021 June 2016 Revised NRC-SNC Hatch NFPA 805 Extension 06212016 ML16169A0612016-06-20020 June 2016 SNC Slides for 6-21-16 Public Meeting on Hatch NFPA 805 Extension ML16169A0602016-06-17017 June 2016 SNC Draft Letter to NRC Regarding Hatch NFPA 805 Extension ML15191A4872015-07-13013 July 2015 Unit 2: Plant Service Water Piping Replacement Using High Density Polyethylene (Hdpe) Piping Nrc/Snc Meeting July 13, 2015 ML15106A2042015-04-22022 April 2015 April 22, 2015, Meeting with Southern Nuclear Company, Slide Presentation ML14177A0862014-06-26026 June 2014 NRC Presentation Slides for Public Meeting with Southern on Seismic Reevaluation (GMRS) ML14176B2392014-06-26026 June 2014 Southern Nuclear Operating Company Seismic Reevaluation - GMRS NTTF 2.1 Presentation Slides ML13112A2552013-04-22022 April 2013 Summary of Public Meeting to Discuss the Annual Assessment of Edwin I. Hatch Nuclear Plant with the Public for the Period of January 1, 2012, - December 31, 2012 ML12115A2572012-04-24024 April 2012 Summary of with Southern Nuclear Operating Co., Inc., to Discuss the Annual Assessment of Edwin I. Hatch for 2011 ML1111900612011-04-28028 April 2011 Summary of Public Meeting with Southern Nuclear Operating Company, Inc., to Discuss the Nrc'S Reactor Oversight Process and the Nrc'S Annual Assessment of Plant Safety Performance at Hatch for the Period of 01/01/210 - 12/31/2010 ML1011304442010-04-23023 April 2010 Summary of Public Meeting to Discuss the Annual Assessment of Edwin I. Hatch for the Period of January 1, 2009 Through December 31, 2009 ML1020105352009-10-29029 October 2009 Tritium Meeting, Southern Nuclear, Hatch ML0910607322009-04-16016 April 2009 Summary of Meeting with Southern Nuclear Operating Co, Inc., to Provide Opportunities to Discuss Annual Assessment of Edwin I. Hatch for the Period of 01/01/2008 - 12/31/08 ML0810704462008-04-0909 April 2008 Annual Assessment Public Meeting, Slides ML0723505462007-08-23023 August 2007 08/15/2007 Public Meeting Summary - Enclosure 2 ML0717004662007-05-31031 May 2007 05/2007 Generation Planning Overview. ML0632800652006-11-14014 November 2006 Meeting Summary Handouts, Enclosure 2 (Tac Nos. MD2934 and MD2935) ML0622804942006-08-0909 August 2006 Hatch Tritium Public Meeting Power Point Slide Attachment ML0611505512006-04-12012 April 2006 Slides for Annual Assessment Meeting Cy 2005 ML0610704022006-04-12012 April 2006 Edwin I. Hatch Annual Assessment Meeting Cy 2005- Slides ML0535403442005-12-12012 December 2005 Submittal of Power Point Presentation Proposed Solutions to Part 21 on Safety Limit 2.1.1.1, NUREG-1433/34 ML0511501332005-04-13013 April 2005 Annual Assessment Meeting Cy 2004, Edwin I. Hatch Nuclear Plant - NRC Region II, Vidalia, Ga, April 13, 2005 ML0410406802004-04-0606 April 2004 Meeting Presentation for Edwin I. Hatch Annual Assessment Meeting, Reactor Oversight Program - Cy 2003 ML0333003292003-11-19019 November 2003 Summary of Meeting Held on November 3, 2003, Between NOAA Fisheries, U.S.Corps of Engineers, and U.S. Nuclear Regulatory Commission to Discuss Section 7 Consultations Under the Endangered Species Act ML0332202492003-11-0303 November 2003 NRC Usace, NOAA Fisheries Meeting, November 3, 2003, Southeast Regional Office, NOAA Fisheries (Encl.2) 2024-09-19
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 April 22, 2013 Mr. D. R. Madison Vice President Southern Nuclear Operating Company, Inc.
Edwin I. Hatch Nuclear Plant 11028 Hatch Parkway North Baxley, GA 31513
SUBJECT:
PUBLIC MEETING
SUMMARY
- EDWIN I. HATCH NUCLEAR PLANT DOCKET NOS. 50-321 AND 50-366
Dear Mr. Madison:
This refers to the meeting conducted on April 17, 2013, in Vidalia, Georgia. The purpose of the meeting/open house session was to provide opportunities to discuss the annual assessment of Edwin I. Hatch Nuclear Plant with the public for the period of January 1, 2012, - December 31, 2012. Enclosed are a list of attendees, copies of the poster boards displayed at the meeting, and the meeting handout.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room (PDR) or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Should you have any questions concerning this meeting, please contact me at (404) 997-4611.
Sincerely,
/RA By Jannette Worosilo For/
Frank Ehrhardt, Chief Reactor Projects Branch 2 Division of Reactor Projects Docket Nos.: 50-321 and 50-366 License Nos.: DPR-57 and NPF-5
Enclosures:
- 1. List of Attendees
- 2. Poster Boards
- 3. Meeting Handout cc w/encls: (See page 2)
____________ X SUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE RII:DRP RII:DRP SIGNATURE Via email /RA/
NAME EMorris JWorosilo DATE 04/19/2013 4/22/2013 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO
D. Madison 2 cc w/encls:
C. Russ Dedrickson Dennis R. Madison Fleet Support Supervisor Vice President Southern Nuclear Operating Company, Inc. Edwin I. Hatch Nuclear Plant Electronic Mail Distribution Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution David R. Vineyard Plant Manager T. E. Tynan Edwin I. Hatch Nuclear Plant Site Vice President Southern Nuclear Operating Company, Inc. Vogtle Electric Generating Plant Electronic Mail Distribution Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution S. Kuczynski Chairman, President and CEO C. R. Pierce Southern Nuclear Operating Company, Inc. Nuclear Licensing Director Electronic Mail Distribution Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution Todd L. Youngblood Vice President B. D. McKinney, Jr.
Fleet Oversight Regulatory Response Manager Southern Nuclear Operating Company, Inc. Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution Electronic Mail Distribution Leigh Perry D. W. Daughhetee SVP & General Counsel-Ops & SNC Licensing Engineer Southern Nuclear Operating Company, Inc. Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution Electronic Mail Distribution D. G. Bost T. D. Honeycutt Chief Nuclear Officer Regulatory Response Supervisor Southern Nuclear Operating Company, Inc. Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution Electronic Mail Distribution Paula Marino Bradley J. Adams Vice President Vice President Engineering Fleet Operations Support Southern Nuclear Operating Company, Inc. Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution Electronic Mail Distribution T. A. Lynch N. J. Stringfellow Vice President Licensing Manager Joseph M. Farley Nuclear Plant Southern Nuclear Operating Company, Inc.
Southern Nuclear Operating Company, Inc. Electronic Mail Distribution Electronic Mail Distribution (cc w/encls contd - See page 3)
D. Madison 3 cc w/encls contd: Arthur H. Domby, Esq.
L. P. Hill Troutman Sanders Licensing Supervisor Electronic Mail Distribution Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution James C. Hardeman Environmental Radiation Program Manager L. L. Crumpton Environmental Protection Division Administrative Assistant, Sr. Georgia Department of Natural Resources Southern Nuclear Operating Company, Inc. Electronic Mail Distribution Electronic Mail Distribution Chuck Mueller Steven B. Tipps Manager Hatch Principal Engineer - Licensing Policy and Radiation Program Edwin I. Hatch Nuclear Plant Georgia Department of Natural Resources Electronic Mail Distribution Electronic Mail Distribution W. E. Duvall Cynthia A. Sanders Site Support Manager Radioactive Materials Program Manager Edwin I. Hatch Nuclear Plant Environmental Protection Division Electronic Mail Distribution Georgia Department of Natural Resources Electronic Mail Distribution Senior Resident Inspector U.S. Nuclear Regulatory Commission Mr. Steven M. Jackson Edwin I. Hatch Nuclear Plant Senior Engineer - Power Supply U.S. NRC Municipal Electric Authority of Georgia 11030 Hatch Parkway N Electronic Mail Distribution Baxley, GA 31513 Reece McAlister Mr. Ken Rosanski Executive Secretary Resident Manager Georgia Public Service Commission Edwin I. Hatch Nuclear Plant Electronic Mail Distribution Oglethorpe Power Corporation Electronic Mail Distribution Chairman Appling County Commissioners Mark Williams County Courthouse Commissioner 69 Tippins Street, Suite 201 Georgia Department of Natural Resources Baxley, GA 31513 Electronic Mail Distribution Amy Whaley Jerry Ranalli Resident Manager Municipal Electric Authority of Georgia Electronic Mail Distribution Power Electronic Mail Distribution Lee Foley Manager of Contracts Generation Oglethorpe Power Corporation Electronic Mail Distribution
D. Madison 4 Letter to Dennis R. Madison from Frank Ehrhardt dated April 22, 2013
SUBJECT:
PUBLIC MEETING
SUMMARY
- EDWIN I. HATCH NUCLEAR PLANT DOCKET NOS. 50-321 AND 50-366 Distribution w/encls:
C. Evans, RII L. Douglas, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMHatch Resource
NRC Annual Assessment Summary Edwin I. Hatch Nuclear Plant Southern Nuclear operated the plant safely and in a manner that preserved the public health and safety and protected the environment.
Edwin I. Hatch Nuclear Plant was in the Licensee Response Column of the NRCs ROP Action Matrix for the last quarter of 2012.
Enclosure 2
2 NRC Inspection Activities Edwin I. Hatch Nuclear Plant for 2012 Two Resident Inspectors on Site Implemented baseline inspection program Inspected in-plant evolutions and activities Compiled and submitted quarterly inspection reports Two Major Team Inspections Component Design Bases Initial License Examination Enclosure 2
3 NRC Plans for 2013 NRC plans baseline inspections at Edwin I.
Hatch Nuclear Plant for the remainder of 2013 Major Team Inspections Include:
Problem Identification and Resolution Initial License Examination Plant Modifications Inspection Emergency Preparedness Exercise Triennial Fire Protection Inspection License Renewal Phase 2 Enclosure 2
4 Reactor Oversight Process Strategic Performance Areas Safety Cornerstones Baseline Inspection Performance Indicator Results Results Significance Significance Significance Threshold Threshold Threshold Action Matrix Regulatory Response Enclosure 2
5 Reactor Oversight Process Regulatory Framework PUBLIC HEALTH AND NRCs Overall SAFETY AS A RESULT OF CIVILIAN Safety Mission NUCLEAR REACTOR OPERATION Strategic Performance REACTOR RADIATION PLANT SAFETY SAFETY SECURITY Areas INITIATING MITIGATING BARRIER EMERGENCY PUBLIC OCCUPATIONAL PHYSICAL Cornerstones EVENTS SYSTEMS INTEGRITY PREPAREDNESS RADIATION RADIATION PROTECTION SAFETY SAFETY Human Performance Safety Conscious Work Problem Identification Environment and Resolution Cross-Cutting Areas Enclosure 2
Edwin I. Hatch Nuclear Plant Annual Assessment Meeting 2012 Reactor Oversight Process Nuclear Regulatory Commission - Region II Enclosure 3
2 Enclosure 3
3 Significance Threshold Performance Indicators Green Baseline Inspection White Requires additional NRC oversight Yellow Requires more NRC oversight Red Requires most NRC oversight Inspection Findings Green Very low safety issue White Low to moderate safety issue Yellow Substantial safety issue Red High safety issue Enclosure 3
4 NRC Annual Assessment Summary Edwin I. Hatch Nuclear Plant Southern Nuclear operated the plant safely and in a manner that preserved the public health and safety and protected the environment.
Edwin I. Hatch Nuclear Plant was in the Licensee Response Column of the NRCs ROP Action Matrix for the last quarter of 2012.
Enclosure 3
5 NRC Inspection Activities Edwin I. Hatch Nuclear Plant for 2012 Two Resident Inspectors on Site Implemented baseline inspection program Inspected in-plant evolutions and activities Compiled and submitted quarterly inspection reports Two Major Team Inspections Component Design Bases Initial License Examination Enclosure 3
6 Edwin I. Hatch Nuclear Plant Performance Indicators and Findings January 1 through December 31, 2012 All Green Performance Indicators All Green / Severity Level IV inspection findings Enclosure 3
7 NRC Plans for 2013 NRC plans baseline inspections at Edwin I.
Hatch Nuclear Plant for the remainder of 2013 Additional Major Inspections Include:
Problem Identification and Resolution Initial License Examination Plant Modifications Inspection Emergency Preparedness Exercise Triennial Fire Protection Inspection License Renewal Phase 2 Enclosure 3
8 Enclosure 3
9 Enclosure 3