Letter Sequence Meeting |
---|
|
|
MONTHYEARML21229A0122021-07-22022 July 2021, 10 September 2021 Summary of August 16, 2021, Public Meeting with Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Request to Adopt TSTF-505 Project stage: Request PMNS20210976, Pre-Submittal Meeting - Proposed Hatch TSTF-505 Lar(Provide Risk-Informed Extended Completion Times- RITSTF LAR 4b)2021-07-22022 July 2021 Pre-Submittal Meeting - Proposed Hatch TSTF-505 Lar(Provide Risk-Informed Extended Completion Times- RITSTF LAR 4b) Project stage: Meeting ML21222A0342021-08-16016 August 2021 SNC Slides - Hatch TSTF-505 LAR - Pre-Submittal Meeting - 08-16-2021 Project stage: Meeting ML21251A5512021-08-16016 August 2021, 30 August 2021, 20 September 2021 Follow-Up Pre-Submittal Meeting Hatch TSTF-505 LAR Project stage: Request PMNS20211130, Follow-Up Pre-Submittal Meeting - Proposed License Amendment Request to Adopt TSTF-505 for Hatch, Units 1 and 22021-08-30030 August 2021 Follow-Up Pre-Submittal Meeting - Proposed License Amendment Request to Adopt TSTF-505 for Hatch, Units 1 and 2 Project stage: Meeting ML21253A1992021-09-10010 September 2021 NRR E-mail Capture - Clarification Call Summary - Hatch Pre-Submittal Meeting TSTF-505 LAR Project stage: Meeting ML21229A0072021-09-10010 September 2021 Summary of Public Meeting with Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Request to Adopt TSTF-505 Project stage: Meeting ML21251A5372021-09-20020 September 2021 September 7, 2021, Summary of Follow-Up, Public, Pre-Licensing Meeting with Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Request to Adopt TSTF-505 for Edwin I. Hatch Nuclear Plant, Units 1 and 2 Project stage: Meeting 2021-08-30
[Table View] |
Similar Documents at Hatch |
---|
Category:Meeting Briefing Package/Handouts
MONTHYEARML24313A1052024-11-13013 November 2024 November 13, 2024, Hatch Pre-Submittal Public Meeting Slides (Southern Co.) ML24317A0292024-11-13013 November 2024 November 13, 2024 Hatch Pre-Submittal Public Meeting Slides (NRC Staff Presentation) ML24295A1842024-10-16016 October 2024 SNC Slides - Hatch Public Pre-Submittal Meeting on Oct 30, 2024 - Change EDG SRs 3.8.1.2 & 3.8.1.5 Load Bands ML24278A0012024-09-19019 September 2024 SLR Environmental Pre-Application Meeting - Southern Nuclear Corporation Presentation Slides ML24263A0822024-09-19019 September 2024 SLR Pre-Application Meeting - NRC Presentation Slides ML24123A0502024-05-0202 May 2024 2023 Annual Assessment Public Meeting Summary Meeting Number 20240479 ML23361A1092024-01-0808 January 2024 SNC Slides for Public Meeting on 1-8-24 to Discuss Hatch LAR - Revise TS Table 1.1-1 (Modes) to Relax Required No. of Fully Tensioned RPV Head Closure Studs ML23361A0812024-01-0808 January 2024 SNC Slides - Pre-Submittal Public Meeting on January 8, 2024 Related to Fleet QATR ML23079A2362023-03-20020 March 2023 Annual Assessment Meeting Presentation Slides ML22209A1872022-07-28028 July 2022 Pre-Submittal Meeting on August 1, 2022 Re Plant Hatch LAR: Relaxation of Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs (EPID L-2022-LRM-0052) (Slides) ML22167A1402022-06-22022 June 2022 Pre-Submittal Public Meeting Slides for Rewrite TS-3.7.2 License Amendment ML22080A0192022-03-18018 March 2022 Annual Assessment Meeting Presentation ML21225A0312021-08-31031 August 2021 Pre-Submittal Meeting - Request to Eliminate the Requirement for Automatic Main Steam Isolation on High Turbine Building Area Temperature ML21222A0342021-08-16016 August 2021 SNC Slides - Hatch TSTF-505 LAR - Pre-Submittal Meeting - 08-16-2021 ML20318A1032020-11-12012 November 2020 SNC ERO Staffing LAR RAI Responses ML20217L4312020-08-13013 August 2020 Edwin I Hatch, Units 1 and 2; and Vogtle Electric Plant, Units 1, 2, 3, and 4 - Meeting Slides a License Amendment Request for the Emergency Plan (EPID Nos L-2020-LLA-0150 and L-2020-LLA-051 ML20156A0012020-06-0404 June 2020 Slides - SNC Slides - Pre-Submittal Meeting on June 10, 2020 - Hatch EDG AOT Extension ML20101K6582020-04-10010 April 2020 Annual Assessment ML19025A0242019-01-25025 January 2019 SNC License Amendment Request for Proposed Changes to Emergency Response Organization Staffing and Augmentation ML18234A4712018-08-23023 August 2018 NRC-Pre Submittal Meeting TSTF-51 for Hatch and TSTF-51 and -471 for Farley - August 23, 2018 ML18136A8902018-05-16016 May 2018 May 21, 2018 Slides for Public Teleconference Regarding Changes to Hatch, Farley, and Vogtle TS 5.2.2.g ML18124A0052018-05-0404 May 2018 Summary of Public Meeting - Hatch Nuclear Plant Docket Nos. 50-321, 50-366 ML18066A0302018-03-0101 March 2018 Slides for March 1, 2018 Public Meeting ML17009A3832017-01-0909 January 2017 Degraded Voltage Pre-Submittal Public Meeting Slides ML16174A0272016-06-21021 June 2016 Revised NRC-SNC Hatch NFPA 805 Extension 06212016 ML16169A0612016-06-20020 June 2016 SNC Slides for 6-21-16 Public Meeting on Hatch NFPA 805 Extension ML15191A4872015-07-13013 July 2015 Unit 2: Plant Service Water Piping Replacement Using High Density Polyethylene (Hdpe) Piping Nrc/Snc Meeting July 13, 2015 ML15106A2042015-04-22022 April 2015 April 22, 2015, Meeting with Southern Nuclear Company, Slide Presentation ML14177A0862014-06-26026 June 2014 NRC Presentation Slides for Public Meeting with Southern on Seismic Reevaluation (GMRS) ML14176B2392014-06-26026 June 2014 Southern Nuclear Operating Company Seismic Reevaluation - GMRS NTTF 2.1 Presentation Slides ML14115A4102014-04-25025 April 2014 Summary of Public Meeting to Discuss Annual Assessment of Edwin I. Hatch Nuclear Plant, Units 1 and 2, in Vidalia, Georgia ML13112A2552013-04-22022 April 2013 Summary of Public Meeting to Discuss the Annual Assessment of Edwin I. Hatch Nuclear Plant with the Public for the Period of January 1, 2012, - December 31, 2012 ML13025A3012013-01-29029 January 2013 NRC Comments on Draft Integrated Plans, Hatch ML13015A2682012-12-17017 December 2012 Draft Submittal Order EA-12-049 - February 2013 FLEX Integrated Plan- Hatch ML12115A2572012-04-24024 April 2012 Summary of with Southern Nuclear Operating Co., Inc., to Discuss the Annual Assessment of Edwin I. Hatch for 2011 ML1111900612011-04-28028 April 2011 Summary of Public Meeting with Southern Nuclear Operating Company, Inc., to Discuss the Nrc'S Reactor Oversight Process and the Nrc'S Annual Assessment of Plant Safety Performance at Hatch for the Period of 01/01/210 - 12/31/2010 ML11090A0912011-04-0505 April 2011 Plant Hatch Fire Risk Monitoring ML1028105222010-10-0808 October 2010 September 29, 2010 Summary O Public Meeting with Farley to Discuss Corrective Actions Associated with Two White Regulatory Performance Public Meeting Summary ML1011304442010-04-23023 April 2010 Summary of Public Meeting to Discuss the Annual Assessment of Edwin I. Hatch for the Period of January 1, 2009 Through December 31, 2009 ML0910607322009-04-16016 April 2009 Summary of Meeting with Southern Nuclear Operating Co, Inc., to Provide Opportunities to Discuss Annual Assessment of Edwin I. Hatch for the Period of 01/01/2008 - 12/31/08 ML1019404512008-08-20020 August 2008 RA Drop-In Briefing Sheet - Hatch, Dated August 20, 2008 ML0810704462008-04-0909 April 2008 Annual Assessment Public Meeting, Slides ML0810704522008-04-0909 April 2008 Annual Assessment Public Meeting of Attendee List ML0723505462007-08-23023 August 2007 08/15/2007 Public Meeting Summary - Enclosure 2 ML0715902092007-05-31031 May 2007 Enclosure 7 - Definitions: SSE (Safe Shutdown Earthquake) & OBE (Operating Basis Earthquake) ML0717004662007-05-31031 May 2007 05/2007 Generation Planning Overview. ML0632800652006-11-14014 November 2006 Meeting Summary Handouts, Enclosure 2 (Tac Nos. MD2934 and MD2935) ML0611505512006-04-12012 April 2006 Slides for Annual Assessment Meeting Cy 2005 ML0536202702005-12-12012 December 2005 Enclosure 4 to Summary of Public Meeting with the Boiling Water Reactor Owner'S Group to Discuss 10 CFR Part 21 Report on Safety Limit 2.1.1.1 of NUREG 1433/34 ML0534700922005-11-29029 November 2005 Hatch, Units 1 & 2, Enclosure, Meeting Summary, Generic Letter 2003-01 2024-09-19
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24317A0292024-11-13013 November 2024 November 13, 2024 Hatch Pre-Submittal Public Meeting Slides (NRC Staff Presentation) ML24313A1052024-11-13013 November 2024 November 13, 2024, Hatch Pre-Submittal Public Meeting Slides (Southern Co.) ML24295A1842024-10-16016 October 2024 SNC Slides - Hatch Public Pre-Submittal Meeting on Oct 30, 2024 - Change EDG SRs 3.8.1.2 & 3.8.1.5 Load Bands ML24278A0012024-09-19019 September 2024 SLR Environmental Pre-Application Meeting - Southern Nuclear Corporation Presentation Slides ML24263A0822024-09-19019 September 2024 SLR Pre-Application Meeting - NRC Presentation Slides ML24123A0502024-05-0202 May 2024 2023 Annual Assessment Public Meeting Summary Meeting Number 20240479 ML23361A0812024-01-0808 January 2024 SNC Slides - Pre-Submittal Public Meeting on January 8, 2024 Related to Fleet QATR ML23361A1092024-01-0808 January 2024 SNC Slides for Public Meeting on 1-8-24 to Discuss Hatch LAR - Revise TS Table 1.1-1 (Modes) to Relax Required No. of Fully Tensioned RPV Head Closure Studs ML23206A0412023-08-0202 August 2023 SNC Slides - Public Pre-Submittal Meeting on Aug 02, 2023 - Request for 45-Day Limited Extension of Risk Informed Completion Time (RICT) Program Backstop for TS 3.7.1 & 3.7.2 ML23088A2362023-03-28028 March 2023 SNC Presentation - Public Meeting - 03-28-2023 - Page from ML22231B055 ML23079A2362023-03-20020 March 2023 Annual Assessment Meeting Presentation Slides ML22209A1872022-07-28028 July 2022 Pre-Submittal Meeting on August 1, 2022 Re Plant Hatch LAR: Relaxation of Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs (EPID L-2022-LRM-0052) (Slides) ML22167A1402022-06-22022 June 2022 Pre-Submittal Public Meeting Slides for Rewrite TS-3.7.2 License Amendment ML22080A0192022-03-18018 March 2022 Annual Assessment Meeting Presentation ML21271A2022021-10-0505 October 2021 Pre-Submittal Meeting on October 5, 2021 - Hatch NFPA 805 Supplement LAR (SNC Slides) ML21225A0312021-08-31031 August 2021 Pre-Submittal Meeting - Request to Eliminate the Requirement for Automatic Main Steam Isolation on High Turbine Building Area Temperature ML21222A0342021-08-16016 August 2021 SNC Slides - Hatch TSTF-505 LAR - Pre-Submittal Meeting - 08-16-2021 ML21083A2872021-03-24024 March 2021 Pre-Submittal Meeting - Quality Assurance Topical Report Revision to Allow Application of Remote Assessment Techniques During Exigent Conditions ML21021A2462021-01-21021 January 2021 Slides - SNC Slides - Pre-Submittal Meeting on January 26, 2021 - Hatch NFPA-805 LAR ML20318A1032020-11-12012 November 2020 SNC ERO Staffing LAR RAI Responses ML20156A0012020-06-0404 June 2020 Slides - SNC Slides - Pre-Submittal Meeting on June 10, 2020 - Hatch EDG AOT Extension ML20101K6582020-04-10010 April 2020 Annual Assessment ML19123A3542019-05-0202 May 2019 Public Meeting Summary - Hatch Nuclear Plant, Docket Nos. 50-321 and 50-366 ML19025A0242019-01-25025 January 2019 SNC License Amendment Request for Proposed Changes to Emergency Response Organization Staffing and Augmentation ML18124A0052018-05-0404 May 2018 Summary of Public Meeting - Hatch Nuclear Plant Docket Nos. 50-321, 50-366 ML18066A0302018-03-0101 March 2018 Slides for March 1, 2018 Public Meeting ML17324A3462017-11-15015 November 2017 Meeting Slides for 11/15/2017, Public Meeting Between NRC and SNC Regarding Hatch License Amendment Request - Application of TSTF-423 to Drywell Spray Function Technical Specification End State ML16174A0272016-06-21021 June 2016 Revised NRC-SNC Hatch NFPA 805 Extension 06212016 ML16169A0612016-06-20020 June 2016 SNC Slides for 6-21-16 Public Meeting on Hatch NFPA 805 Extension ML16169A0602016-06-17017 June 2016 SNC Draft Letter to NRC Regarding Hatch NFPA 805 Extension ML15191A4872015-07-13013 July 2015 Unit 2: Plant Service Water Piping Replacement Using High Density Polyethylene (Hdpe) Piping Nrc/Snc Meeting July 13, 2015 ML15106A2042015-04-22022 April 2015 April 22, 2015, Meeting with Southern Nuclear Company, Slide Presentation ML14177A0862014-06-26026 June 2014 NRC Presentation Slides for Public Meeting with Southern on Seismic Reevaluation (GMRS) ML14176B2392014-06-26026 June 2014 Southern Nuclear Operating Company Seismic Reevaluation - GMRS NTTF 2.1 Presentation Slides ML13112A2552013-04-22022 April 2013 Summary of Public Meeting to Discuss the Annual Assessment of Edwin I. Hatch Nuclear Plant with the Public for the Period of January 1, 2012, - December 31, 2012 ML12115A2572012-04-24024 April 2012 Summary of with Southern Nuclear Operating Co., Inc., to Discuss the Annual Assessment of Edwin I. Hatch for 2011 ML1111900612011-04-28028 April 2011 Summary of Public Meeting with Southern Nuclear Operating Company, Inc., to Discuss the Nrc'S Reactor Oversight Process and the Nrc'S Annual Assessment of Plant Safety Performance at Hatch for the Period of 01/01/210 - 12/31/2010 ML1011304442010-04-23023 April 2010 Summary of Public Meeting to Discuss the Annual Assessment of Edwin I. Hatch for the Period of January 1, 2009 Through December 31, 2009 ML1020105352009-10-29029 October 2009 Tritium Meeting, Southern Nuclear, Hatch ML0910607322009-04-16016 April 2009 Summary of Meeting with Southern Nuclear Operating Co, Inc., to Provide Opportunities to Discuss Annual Assessment of Edwin I. Hatch for the Period of 01/01/2008 - 12/31/08 ML0810704462008-04-0909 April 2008 Annual Assessment Public Meeting, Slides ML0723505462007-08-23023 August 2007 08/15/2007 Public Meeting Summary - Enclosure 2 ML0717004662007-05-31031 May 2007 05/2007 Generation Planning Overview. ML0632800652006-11-14014 November 2006 Meeting Summary Handouts, Enclosure 2 (Tac Nos. MD2934 and MD2935) ML0622804942006-08-0909 August 2006 Hatch Tritium Public Meeting Power Point Slide Attachment ML0611505512006-04-12012 April 2006 Slides for Annual Assessment Meeting Cy 2005 ML0610704022006-04-12012 April 2006 Edwin I. Hatch Annual Assessment Meeting Cy 2005- Slides ML0535403442005-12-12012 December 2005 Submittal of Power Point Presentation Proposed Solutions to Part 21 on Safety Limit 2.1.1.1, NUREG-1433/34 ML0511501332005-04-13013 April 2005 Annual Assessment Meeting Cy 2004, Edwin I. Hatch Nuclear Plant - NRC Region II, Vidalia, Ga, April 13, 2005 ML0410406802004-04-0606 April 2004 Meeting Presentation for Edwin I. Hatch Annual Assessment Meeting, Reactor Oversight Program - Cy 2003 2024-09-19
[Table view] |
Text
Hatch Pre-Submittal Meeting for TSTF-505 Revision 2 August 16, 2021
2 Meeting Agenda
- PRA Models and Configuration Risk Model Overview
- License Amendment Request Overview
PRA Models and Configuration Risk Model Overview
4 Overview of PRA Portion of HNP TSTF-505 LAR
- PRA models are periodically updated to reflect plant changes and updated data
- Uncertainty analysis performed per NUREG-1855 Rev 1.
- PRA models are peer-reviewed and F&O Closure was independently validated
- Seismic: Penalty applied for CDF and LERF (detailed in Enclosure 4 to LAR)
- Other External Hazards screened per the standard
- High Winds: losses of offsite power (LOOPs) included in internal event (IE) PRA (Other High Wind effects screened)
- Unit-specific PRAs will be used for application
- Sample RICT calculations to be presented in LAR are for Unit 2 configurations.
- A sample of Unit 1 configurations will also have RICTs calculated, to demonstrate the similarity between unit results.
5 Internal Events / Internal Flood PRA November 2009 - HNP IE and internal flooding (IF) PRA model was subject to a full-scope peer review against RG 1.200 Rev. 2 utilizing guidance in NEI-05-04.
IE and IF open findings were reviewed; all but 2 IE and 2 IF closed in April 2017 for the IE and IF PRA models using the process documented in Appendix X to NEI 05-04, NEI 07-12, and NEI 12-13, Close-out of Facts and Observations (F&Os) as accepted by NRC (ML17079A427).
Two IF findings required a focused scope peer review, performed in October 2019 and findings closed.
There are two remaining open IE findings related to documentation. Corrective actions for those have been performed and all applicable supporting requirements are met at capability category II.
IE and IF peer review and finding closures examined by NRC during 50.69 submittal review (see document ML20077J704).
6 Fire PRA May 2016 - HNP Fire PRA was subject to full-scope peer review against RG 1.200 Rev. 2 utilizing guidance in NEI 07-12.
Findings were reviewed and closed in October 2017 for the Fire PRA models using the process documented in Appendix X to NEI 05-04, NEI 07-12, and NEI 12-13.
There are no open findings, and all applicable supporting requirements are met to at least capability category II.
SNC will use as-built Fire PRA, and will only credit implemented NFPA-805 modifications.
Fire PRA peer review and finding closeout reviewed during HNP NFPA-805 submittal review (see document ML20066F592).
7 RICT Program Configuration Risk Model RICT will use Configuration Risk Model as currently used for existing Maintenance Rule a(4) Configuration Risk Management Program (CRMP)
Uses PHOENIX Risk Analysis Software. Operations and Work management familiar with software, and it is integrated with clearance and work scheduling software.
Incorporates RICT calculation features. PHOENIX used for example RICT calculations in submittal.
Utilizes single fault tree, all hazard model, re-quantified for each configuration.
One-Top model has been validated to produce identical results to individual hazards. One-top model is used for all HNP risk-informed applications.
License Amendment Request
9 LAR Discussion
- RICTs apply in Mode 1 only, consistent with PRA model
- Only PRA modeled features (or appropriate surrogate) have RICT proposed
- No Loss of Function RICTs proposed
- Additional administrative (clean-up) items included in LAR
- Variations and administrative items discussed on upcoming slides
10 Administrative Changes
- Remove one-time, temporary changes to Unit 2 TS 3.5.1, ECCS - Operating and Unit 1 and Unit 2 TS 3.8.1, AC Sources - Operating
- These were one-time allowances to extend the CTs, and are no longer applicable
- Remove page 3.4-25 from both Unit 1 and Unit 2 TS
- Page is a duplicate of page 3.4-22 reflecting LCO 3.4.10
- Revise title of LCO 3.3.2.2 Feedwater and Main Turbine Trip High Water Level Instrumentation, by moving Trip to after Level. Also add high water level to LCO statement
- This phrasing will establish consistency with phrasing in the Actions, Surveillance Note, and Bases
- Change is also consistent with NUREG-1433 phrasing
11 Variations
- Industry precedence (Peach Bottom) exists for including a RICT to one inoperable RHR Drywell Spray subsystem
- Re-typed (Clean) TS Pages not included
- SNC proposing to include sample RICTs only for TS 3.8 Required Actions
- TSTF-505 requires identification of risk managed actions (RMAs) for evaluation of electrical power systems; sample RICTs would be included with RMAs
- SNC not aware of a requirement to include identification of RMAs or sample RICTs to other TSs
12
- TS 3.3.6.1, 3.6.1.3, and 3.8.1 are re-formatted to maintain only first level logical connectors in Completion Times.
- Maintains consistency with TS 1.2 requirements for nesting.
- Revised format maintains intent of existing TS.
Current TS 3.3.6.1 Condition A:
Variations (continued)
CONDITION REQUIRED ACTION COMPLETION TIME A.
One or more required channels inoperable.
A.1 Place channel in trip.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> for Functions 2.a, 2.b, 6.b, 7.a, and 7.b AND 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for Functions other than Functions 2.a, 2.b, 6.b, 7.a, and 7.b
13
- Same intent as existing 3.3.6.1 Condition A (i.e.
12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> CT for Functions 2.a, 2.b, 6.b, 7.a, and 7.b; 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> CT for all other Functions)
- Allows use of RICT without nesting logical connectors
- Note excluding RICT for items not modeled in PRA (e.g. Functions 2.c, 2.d, 2.e, 6.a, 6.b, 7.a, and 7.b)
Proposed TS 3.3.6.1 Condition A Variations (continued)
14
- Per PRA success criteria AND design basis success criteria, this is not a LOF Condition
- LCO 3.0.3 provides 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to initiate action to place unit in Mode 2 in 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br />, Mode 3 in 13 hours1.50463e-4 days <br />0.00361 hours <br />2.149471e-5 weeks <br />4.9465e-6 months <br />, and Mode 4 in 37 hours4.282407e-4 days <br />0.0103 hours <br />6.117725e-5 weeks <br />1.40785e-5 months <br />
- Similar to Vogtle and Farley reformatting made during their respective amendment request for risk-informed TS Variations (continued)
Proposed TS 3.5.1 Conditions C and D
15 HNP Electrical Distribution System - Simplified Diagram
16
- TS 3.8.1 Conditions rearranged to avoid Completion Time nesting
- Due to shared systems (e.g. SGT, MCREC), and due to loads being supplied from opposite unit (e.g.
LPCI valve load centers), each Unit requires AC sources (e.g. a required EDG or offsite transmission network) from the opposite Unit
- TS 3.8.1 includes Conditions for required AC sources from opposite unit
- For inoperable Unit DG, TS allow 14 day CT provided swing DG is locked to that unit and provided maintenance restrictions (e.g.
required Operable systems and functions) are met Current Unit 1 RA B.4.1 Variations - Revision to TS 3.8.1 Proposed Unit 1 RA B.4.1
17
- Some Instrumentation Conditions are applicable when one or more channels are inoperable, which could represent a LOF
- Should a LOF exist, TS require entry into a separate Condition that does not have RICT option. Using TS 3.3.1.1 as an example:
- Should LOF exist for Condition A or Condition B, Condition C will also be entered
- Condition C is more restrictive and precludes applying a RICT for LOF TS 3.3.1.1 Loss of Function (LOF) Considerations CONDITION REQUIRED ACTION COMPLETION TIME C.
One or more Functions with RPS trip capability not maintained.
C.1 Restore RPS trip capability.
1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />