MONTHYEARML24313A1052024-11-13013 November 2024 November 13, 2024, Hatch Pre-Submittal Public Meeting Slides (Southern Co.) ML24317A0292024-11-13013 November 2024 November 13, 2024 Hatch Pre-Submittal Public Meeting Slides (NRC Staff Presentation) ML24295A1842024-10-16016 October 2024 SNC Slides - Hatch Public Pre-Submittal Meeting on Oct 30, 2024 - Change EDG SRs 3.8.1.2 & 3.8.1.5 Load Bands ML24278A0012024-09-19019 September 2024 SLR Environmental Pre-Application Meeting - Southern Nuclear Corporation Presentation Slides ML24263A0822024-09-19019 September 2024 SLR Pre-Application Meeting - NRC Presentation Slides ML24123A0502024-05-0202 May 2024 2023 Annual Assessment Public Meeting Summary Meeting Number 20240479 ML23361A1092024-01-0808 January 2024 SNC Slides for Public Meeting on 1-8-24 to Discuss Hatch LAR - Revise TS Table 1.1-1 (Modes) to Relax Required No. of Fully Tensioned RPV Head Closure Studs ML23361A0812024-01-0808 January 2024 SNC Slides - Pre-Submittal Public Meeting on January 8, 2024 Related to Fleet QATR ML23079A2362023-03-20020 March 2023 Annual Assessment Meeting Presentation Slides ML22209A1872022-07-28028 July 2022 Pre-Submittal Meeting on August 1, 2022 Re Plant Hatch LAR: Relaxation of Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs (EPID L-2022-LRM-0052) (Slides) ML22167A1402022-06-22022 June 2022 Pre-Submittal Public Meeting Slides for Rewrite TS-3.7.2 License Amendment ML22080A0192022-03-18018 March 2022 Annual Assessment Meeting Presentation ML21225A0312021-08-31031 August 2021 Pre-Submittal Meeting - Request to Eliminate the Requirement for Automatic Main Steam Isolation on High Turbine Building Area Temperature ML21222A0342021-08-16016 August 2021 SNC Slides - Hatch TSTF-505 LAR - Pre-Submittal Meeting - 08-16-2021 ML20318A1032020-11-12012 November 2020 SNC ERO Staffing LAR RAI Responses ML20217L4312020-08-13013 August 2020 Edwin I Hatch, Units 1 and 2; and Vogtle Electric Plant, Units 1, 2, 3, and 4 - Meeting Slides a License Amendment Request for the Emergency Plan (EPID Nos L-2020-LLA-0150 and L-2020-LLA-051 ML20156A0012020-06-0404 June 2020 Slides - SNC Slides - Pre-Submittal Meeting on June 10, 2020 - Hatch EDG AOT Extension ML20101K6582020-04-10010 April 2020 Annual Assessment ML19025A0242019-01-25025 January 2019 SNC License Amendment Request for Proposed Changes to Emergency Response Organization Staffing and Augmentation ML18234A4712018-08-23023 August 2018 NRC-Pre Submittal Meeting TSTF-51 for Hatch and TSTF-51 and -471 for Farley - August 23, 2018 ML18136A8902018-05-16016 May 2018 May 21, 2018 Slides for Public Teleconference Regarding Changes to Hatch, Farley, and Vogtle TS 5.2.2.g ML18124A0052018-05-0404 May 2018 Summary of Public Meeting - Hatch Nuclear Plant Docket Nos. 50-321, 50-366 ML18066A0302018-03-0101 March 2018 Slides for March 1, 2018 Public Meeting ML17009A3832017-01-0909 January 2017 Degraded Voltage Pre-Submittal Public Meeting Slides ML16174A0272016-06-21021 June 2016 Revised NRC-SNC Hatch NFPA 805 Extension 06212016 ML16169A0612016-06-20020 June 2016 SNC Slides for 6-21-16 Public Meeting on Hatch NFPA 805 Extension ML15191A4872015-07-13013 July 2015 Unit 2: Plant Service Water Piping Replacement Using High Density Polyethylene (Hdpe) Piping Nrc/Snc Meeting July 13, 2015 ML15106A2042015-04-22022 April 2015 April 22, 2015, Meeting with Southern Nuclear Company, Slide Presentation ML14177A0862014-06-26026 June 2014 NRC Presentation Slides for Public Meeting with Southern on Seismic Reevaluation (GMRS) ML14176B2392014-06-26026 June 2014 Southern Nuclear Operating Company Seismic Reevaluation - GMRS NTTF 2.1 Presentation Slides ML14115A4102014-04-25025 April 2014 Summary of Public Meeting to Discuss Annual Assessment of Edwin I. Hatch Nuclear Plant, Units 1 and 2, in Vidalia, Georgia ML13112A2552013-04-22022 April 2013 Summary of Public Meeting to Discuss the Annual Assessment of Edwin I. Hatch Nuclear Plant with the Public for the Period of January 1, 2012, - December 31, 2012 ML13025A3012013-01-29029 January 2013 NRC Comments on Draft Integrated Plans, Hatch ML13015A2682012-12-17017 December 2012 Draft Submittal Order EA-12-049 - February 2013 FLEX Integrated Plan- Hatch ML12115A2572012-04-24024 April 2012 Summary of with Southern Nuclear Operating Co., Inc., to Discuss the Annual Assessment of Edwin I. Hatch for 2011 ML1111900612011-04-28028 April 2011 Summary of Public Meeting with Southern Nuclear Operating Company, Inc., to Discuss the Nrc'S Reactor Oversight Process and the Nrc'S Annual Assessment of Plant Safety Performance at Hatch for the Period of 01/01/210 - 12/31/2010 ML11090A0912011-04-0505 April 2011 Plant Hatch Fire Risk Monitoring ML1028105222010-10-0808 October 2010 September 29, 2010 Summary O Public Meeting with Farley to Discuss Corrective Actions Associated with Two White Regulatory Performance Public Meeting Summary ML1011304442010-04-23023 April 2010 Summary of Public Meeting to Discuss the Annual Assessment of Edwin I. Hatch for the Period of January 1, 2009 Through December 31, 2009 ML0910607322009-04-16016 April 2009 Summary of Meeting with Southern Nuclear Operating Co, Inc., to Provide Opportunities to Discuss Annual Assessment of Edwin I. Hatch for the Period of 01/01/2008 - 12/31/08 ML1019404512008-08-20020 August 2008 RA Drop-In Briefing Sheet - Hatch, Dated August 20, 2008 ML0810704462008-04-0909 April 2008 Annual Assessment Public Meeting, Slides ML0810704522008-04-0909 April 2008 Annual Assessment Public Meeting of Attendee List ML0723505462007-08-23023 August 2007 08/15/2007 Public Meeting Summary - Enclosure 2 ML0715902092007-05-31031 May 2007 Enclosure 7 - Definitions: SSE (Safe Shutdown Earthquake) & OBE (Operating Basis Earthquake) ML0717004662007-05-31031 May 2007 05/2007 Generation Planning Overview. ML0632800652006-11-14014 November 2006 Meeting Summary Handouts, Enclosure 2 (Tac Nos. MD2934 and MD2935) ML0611505512006-04-12012 April 2006 Slides for Annual Assessment Meeting Cy 2005 ML0536202702005-12-12012 December 2005 Enclosure 4 to Summary of Public Meeting with the Boiling Water Reactor Owner'S Group to Discuss 10 CFR Part 21 Report on Safety Limit 2.1.1.1 of NUREG 1433/34 ML0534700922005-11-29029 November 2005 Hatch, Units 1 & 2, Enclosure, Meeting Summary, Generic Letter 2003-01 2024-09-19
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24317A0292024-11-13013 November 2024 November 13, 2024 Hatch Pre-Submittal Public Meeting Slides (NRC Staff Presentation) ML24313A1052024-11-13013 November 2024 November 13, 2024, Hatch Pre-Submittal Public Meeting Slides (Southern Co.) ML24295A1842024-10-16016 October 2024 SNC Slides - Hatch Public Pre-Submittal Meeting on Oct 30, 2024 - Change EDG SRs 3.8.1.2 & 3.8.1.5 Load Bands ML24278A0012024-09-19019 September 2024 SLR Environmental Pre-Application Meeting - Southern Nuclear Corporation Presentation Slides ML24263A0822024-09-19019 September 2024 SLR Pre-Application Meeting - NRC Presentation Slides ML24123A0502024-05-0202 May 2024 2023 Annual Assessment Public Meeting Summary Meeting Number 20240479 ML23361A0812024-01-0808 January 2024 SNC Slides - Pre-Submittal Public Meeting on January 8, 2024 Related to Fleet QATR ML23361A1092024-01-0808 January 2024 SNC Slides for Public Meeting on 1-8-24 to Discuss Hatch LAR - Revise TS Table 1.1-1 (Modes) to Relax Required No. of Fully Tensioned RPV Head Closure Studs ML23206A0412023-08-0202 August 2023 SNC Slides - Public Pre-Submittal Meeting on Aug 02, 2023 - Request for 45-Day Limited Extension of Risk Informed Completion Time (RICT) Program Backstop for TS 3.7.1 & 3.7.2 ML23088A2362023-03-28028 March 2023 SNC Presentation - Public Meeting - 03-28-2023 - Page from ML22231B055 ML23079A2362023-03-20020 March 2023 Annual Assessment Meeting Presentation Slides ML22209A1872022-07-28028 July 2022 Pre-Submittal Meeting on August 1, 2022 Re Plant Hatch LAR: Relaxation of Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs (EPID L-2022-LRM-0052) (Slides) ML22167A1402022-06-22022 June 2022 Pre-Submittal Public Meeting Slides for Rewrite TS-3.7.2 License Amendment ML22080A0192022-03-18018 March 2022 Annual Assessment Meeting Presentation ML21271A2022021-10-0505 October 2021 Pre-Submittal Meeting on October 5, 2021 - Hatch NFPA 805 Supplement LAR (SNC Slides) ML21225A0312021-08-31031 August 2021 Pre-Submittal Meeting - Request to Eliminate the Requirement for Automatic Main Steam Isolation on High Turbine Building Area Temperature ML21222A0342021-08-16016 August 2021 SNC Slides - Hatch TSTF-505 LAR - Pre-Submittal Meeting - 08-16-2021 ML21083A2872021-03-24024 March 2021 Pre-Submittal Meeting - Quality Assurance Topical Report Revision to Allow Application of Remote Assessment Techniques During Exigent Conditions ML21021A2462021-01-21021 January 2021 Slides - SNC Slides - Pre-Submittal Meeting on January 26, 2021 - Hatch NFPA-805 LAR ML20318A1032020-11-12012 November 2020 SNC ERO Staffing LAR RAI Responses ML20156A0012020-06-0404 June 2020 Slides - SNC Slides - Pre-Submittal Meeting on June 10, 2020 - Hatch EDG AOT Extension ML20101K6582020-04-10010 April 2020 Annual Assessment ML19123A3542019-05-0202 May 2019 Public Meeting Summary - Hatch Nuclear Plant, Docket Nos. 50-321 and 50-366 ML19025A0242019-01-25025 January 2019 SNC License Amendment Request for Proposed Changes to Emergency Response Organization Staffing and Augmentation ML18124A0052018-05-0404 May 2018 Summary of Public Meeting - Hatch Nuclear Plant Docket Nos. 50-321, 50-366 ML18066A0302018-03-0101 March 2018 Slides for March 1, 2018 Public Meeting ML17324A3462017-11-15015 November 2017 Meeting Slides for 11/15/2017, Public Meeting Between NRC and SNC Regarding Hatch License Amendment Request - Application of TSTF-423 to Drywell Spray Function Technical Specification End State ML16174A0272016-06-21021 June 2016 Revised NRC-SNC Hatch NFPA 805 Extension 06212016 ML16169A0612016-06-20020 June 2016 SNC Slides for 6-21-16 Public Meeting on Hatch NFPA 805 Extension ML16169A0602016-06-17017 June 2016 SNC Draft Letter to NRC Regarding Hatch NFPA 805 Extension ML15191A4872015-07-13013 July 2015 Unit 2: Plant Service Water Piping Replacement Using High Density Polyethylene (Hdpe) Piping Nrc/Snc Meeting July 13, 2015 ML15106A2042015-04-22022 April 2015 April 22, 2015, Meeting with Southern Nuclear Company, Slide Presentation ML14177A0862014-06-26026 June 2014 NRC Presentation Slides for Public Meeting with Southern on Seismic Reevaluation (GMRS) ML14176B2392014-06-26026 June 2014 Southern Nuclear Operating Company Seismic Reevaluation - GMRS NTTF 2.1 Presentation Slides ML13112A2552013-04-22022 April 2013 Summary of Public Meeting to Discuss the Annual Assessment of Edwin I. Hatch Nuclear Plant with the Public for the Period of January 1, 2012, - December 31, 2012 ML12115A2572012-04-24024 April 2012 Summary of with Southern Nuclear Operating Co., Inc., to Discuss the Annual Assessment of Edwin I. Hatch for 2011 ML1111900612011-04-28028 April 2011 Summary of Public Meeting with Southern Nuclear Operating Company, Inc., to Discuss the Nrc'S Reactor Oversight Process and the Nrc'S Annual Assessment of Plant Safety Performance at Hatch for the Period of 01/01/210 - 12/31/2010 ML1011304442010-04-23023 April 2010 Summary of Public Meeting to Discuss the Annual Assessment of Edwin I. Hatch for the Period of January 1, 2009 Through December 31, 2009 ML1020105352009-10-29029 October 2009 Tritium Meeting, Southern Nuclear, Hatch ML0910607322009-04-16016 April 2009 Summary of Meeting with Southern Nuclear Operating Co, Inc., to Provide Opportunities to Discuss Annual Assessment of Edwin I. Hatch for the Period of 01/01/2008 - 12/31/08 ML0810704462008-04-0909 April 2008 Annual Assessment Public Meeting, Slides ML0723505462007-08-23023 August 2007 08/15/2007 Public Meeting Summary - Enclosure 2 ML0717004662007-05-31031 May 2007 05/2007 Generation Planning Overview. ML0632800652006-11-14014 November 2006 Meeting Summary Handouts, Enclosure 2 (Tac Nos. MD2934 and MD2935) ML0622804942006-08-0909 August 2006 Hatch Tritium Public Meeting Power Point Slide Attachment ML0611505512006-04-12012 April 2006 Slides for Annual Assessment Meeting Cy 2005 ML0610704022006-04-12012 April 2006 Edwin I. Hatch Annual Assessment Meeting Cy 2005- Slides ML0535403442005-12-12012 December 2005 Submittal of Power Point Presentation Proposed Solutions to Part 21 on Safety Limit 2.1.1.1, NUREG-1433/34 ML0511501332005-04-13013 April 2005 Annual Assessment Meeting Cy 2004, Edwin I. Hatch Nuclear Plant - NRC Region II, Vidalia, Ga, April 13, 2005 ML0410406802004-04-0606 April 2004 Meeting Presentation for Edwin I. Hatch Annual Assessment Meeting, Reactor Oversight Program - Cy 2003 2024-09-19
[Table view] |
Text
Hatch Risk-Informed One-Time Technical Specification Completion Time Extension June 10, 2020
2 Agenda Items 1.
Introductions
2.
Meeting Kick-off 3.
Purpose HNP EDG Risk Informed One-Time Completion Time Extension 4.
Overview of HNP Electrical System 5.
Deterministic and Defense in Depth Aspects 6.
HNP PRA 7.
Proposed License Amendment Request Content
Purpose HNP EDG Risk Informed One-Time Completion Time Extension
4 Purpose
- HNP Technical Specifications (TS) currently allow up to 14 days allowable outage time (AOT) for a single EDG.
- Fall and Spring upcoming EDG outages include cylinder liner replacements and a full teardown of each HNP Unit 1 EDG and the swing EDG.
- The current schedules show greater than 75% of the AOT being used to complete the work.
- COVID-19 impacts such as social distancing requirements further increase the chance of exceeding the AOT.
- To be proactive SNC proposes an expedited LAR to support a risk-informed one-time EDG Completion Time extension for both Unit 1 EDGs and the swing EDG instead of processing a risk-informed emergency TS change during an EDG outage.
5 Proposal
- SNC proposes a one-time allowance for each Unit 1 EDG and the swing EDG to extend the AOT.
- Will allow for margin to account for unforeseen EDG material degradations/repairs.
- Risk impact of requested change will be evaluated and shown to meet the risk metrics of RG 1.174 and RG 1.177.
- Will require existing maintenance restrictions to be met and will require swing EDG inhibited from aligning to Unit 2 (for 1A & 1C outages) during extended AOT.
Overview of HNP Electrical System
7 Simplified HNP Electrical System Unit 1 1G 1E 1C LPCI 1B 1D 1D 1E 1F 1A 1C LPCI 1A 1C Unit 2 2G 2E 2C 2D 2D 2E 2F MCC 2F 2A 2C 1B 2C LPCI 2B LPCI 2A MCC 1F MCR 1A MCR 1B N
N N
A A
A N
N N
A A
A N
N N
N
8 HNP Electrical Offsite Power System Overview
- With the recent installation of an additional startup auxiliary transfer (SAT) on each unit, the HNP offsite circuit design is robust and highly reliable.
- Offsite power is supplied to the station from the 230kV ring bus by five electrically and physically separate feeds through startup auxiliary transformers (SATs) 1C and 2C (via a common switchyard feed), 1D, 1E, 2D, and 2E, to the respective unit 4.16 kV ESF buses E, F, and G.
- Each SAT provides the normal source of power to its respective ESF bus.
If any 4.16 kV ESF bus loses power, an automatic transfer occurs from the normal offsite power source to its alternate offsite power source.
9 HNP Electrical Offsite Power System Overview
- By design, no single SAT can supply more than two ESF buses simultaneously.
- The SATs are sized to accommodate the simultaneous starting of all required ESF loads on receipt of an accident signal without the need for load sequencing.
- Only one SAT per unit is required to supply two ESF buses, which are sufficient to provide the required safety functions and support shutdown and cooldown to cold conditions.
10 HNP Electrical Onsite Emergency Power System Overview
- Each HNP unit is designed with three ESF buses (E, F, and G). The E and G buses contain most of the divisional equipment and the F (or swing) bus contains some divisional equipment from both electrical divisions (e.g., an RHR pump from each RHR loop).
- Emergency power is supplied by independent EDGs with the E and G buses supplied by a unit EDG and the swing EDG can be selected to either F bus on either unit. The swing EDG cannot supply both F buses simultaneously.
- Any two of three ESF buses per unit can fully provide the required safety functions and support shutdown and cooldown to cold conditions and remain in cold shutdown conditions for 30 days.
11 4160 V 2E 4160 V 2F 4160 V 2G HNP Unit 1 and 2 Loads 2A PSW Pump 2A RHR Pump 2A Core Spray Pump 2A RHRSW Pump 2A Drywell Chiller Motor 600 V xfrm 2C 2A SGT 2C PSW Pump 2D PSW Pump 2C RHR Pump 2D RHR Pump 2C RHRSW Pump 2B PSW Pump 2B RHR Pump 2B Core Spray Pump 2B RHRSW Pump 2D RHRSW Pump 2B Drywell Chiller Motor 600 V xfrm 2D 2B SGT 4160 V 1E 4160 V 1F 4160 V 1G 1A PSW Pump 1A RHR Pump 1A Core Spray Pump 1A RHRSW Pump 600 V xfrm 1C 1A SGT A MCR Chiller A MCREV 1C PSW Pump 1D PSW Pump 1C RHR Pump 1D RHR Pump 1C RHRSW Pump 1B PSW Pump 1B RHR Pump 1B Core Spray Pump 1B RHRSW Pump 1D RHRSW Pump 600 V xfrm 1D 1B SGT B MCR Chiller B MCREV
Deterministic and Defense in Depth Aspects
13 Reliable Offsite Sources
- Since each ESF bus is supplied by its respective SAT and each SAT has an independent line to the ring bus, except SAT 1C and 2C, which share a common feeder line, it is highly unlikely that a full loss of all offsite power will occur during an extended EDG outage.
- A single feeder line failure will result in loss of no more than one ESF bus per unit thereby relying on the start of one EDG per unit.
- Any two ESF buses per unit are adequate to support shutdown and cooldown of each unit.
- During the EDG extended outage, loss of power to a single offsite feeder line concurrent with an additional EDG failure will not result in loss of more than one ESF bus per unit; two ESF buses per unit will remain available to support unit shutdown and cooldown.
14 Three Onsite EDG Sources
- A typical standard plant electrical system design arrangement consists of two ESF buses with one EDG supplying each bus. With one EDG in an extended outage, an additional EDG failure would result in a loss of both AC electrical power divisions in the event of a full loss of offsite power.
- The HNP electrical power design is such that a single ESF bus provides a portion of at least one electrical power division. Any combination of two ESF buses is adequate to provide the plant safety functions. Two buses provide power to either one electrical power division or a portion of both divisions that is at least equivalent to one division.
- In the highly unlikely event of a full loss of the Georgia grid system during an extended EDG outage with an additional EDG failure, at least one ESF bus per unit will continue to be available to support shutdown and cooldown of each unit.
- In this highly unlikely scenario, at least one RHR pump and one RHRSW pump per unit would be available to cooldown its respective unit to cold conditions, although it would not meet the cooldown time period specified in RG 1.139.
15 Defense in Depth Aspects
- SNC is not planning to acquire and temporarily install an alternate AC source.
- To minimize the likelihood of a full loss of offsite power to a unit, SNC plans to:
- protect all six SATs and maintain in service and aligned to their respective ESF buses for the duration of the extended EDG outage.
- ESF bus automatic transfer capability from the normal to the alternate circuit will be maintained for each ESF bus on both units.
- No maintenance or testing will be scheduled in the HNP 500 kV or 230kV switchyard that could affect the stability of the of the feeder lines to the HNP SATs.
- No maintenance or testing will be scheduled that could affect the availability of the FLEX DGs.
- All remaining HNP EDGs will be protected, available, and maintained OPERABLE for the duration of the extended EDG outage; testing of the remaining EDGs will be limited to that only required by Technical Specifications.
16 Defense in Depth Aspects
- No maintenance will be scheduled on any equipment needed to support shutdown and cooldown of both HNP units in the event of a full loss of offsite power.
- Both HPCI and RCIC will be protected, available, and maintained OPERABLE for the duration of the extended EDG outage.
HNP PRA
18 RG 1.177, Principle 4 When the proposed licensing basis changes result in an increase in risk, the increases should be small and consistent with the intent of the Commissions policy statement on safety goals for the operations of nuclear power plants.
19 Hatch PRA Acceptability
- All Hatch PRA models used for this request reflect the current as-built as-operated plant and have been peer reviewed and all F&Os are closed.
- Screening evaluation for other hazards will be reviewed to confirm that no assumptions about diesels impact the screening.
- The PRA models contain a high level of detail for the safety related electrical power supplies, including common cause groupings and human reliability events.
20 PRA Analysis
- The PRA analysis will demonstrate compliance with RG 1.177.
- Metrics to be used will be total CDF and LERF, and ICCDP/ILERP as discussed for one-time changes in RG 1.177 section 2.4
- It is expected that the results will fall in the range requiring compensatory actions such as prohibited maintenance and additional controls in fire areas.
- Existing restrictions associated with the 14 day LCO will be the starting point for any additional risk management actions.
- Each diesel assessed separately, impacts to both Unit 1 and Unit 2 to be assessed, due to LPCI MCC cross-ties.
21 Risk Management Actions Existing set of risk management actions exist. Additional actions would depend on PRA results analysis.
Additional actions would most likely be needed to address fire risk.
Existing on-line configuration risk management program would be updated to use same base model as LAR risk submittal prior to first diesel outage.
On-line configuration risk process uses all hazards except seismic and uses integrated risk for risk management actions.
Seismic model is present in on-line model but is turned off for quantification time improvements and low contribution to risk. If contribution to diesel risk is high, will be turned on.
22 Monitoring Actions Diesel unavailability is tracked for maintenance rule target and MSPI impact.
Additional diesel unavailability time resulting from extended time will be evaluated against the existing targets for MR and planned unavailability for MSPI.
23 Conclusions Risk Impact evaluations will follow RG 1.177 guidance.
Risk increases will be within acceptable limits Risk management actions will be taken.
Diesel unavailability will remain below maintenance rule and MSPI targets.
License Amendment Request Content
25 License Amendment Request Content :
1.
Summary Description 2.
Detailed Description
- System Design and Operation
- Reason for Proposed Change
Technical Evaluation
- Applicability of Proposed Change
- Deterministic Aspects and Defense in Depth Measures
- Risk Informed Summary including risk metrics 4.
Regulatory Evaluation
Environmental Considerations 6.
References
26 License Amendment Request Content (continued)
Attachments 1.
HNP Unit 1 and Unit 2 Technical Specifications Marked-Up Pages 2.
HNP Unit 1 and Unit 2 Technical Specifications Clean-Typed Pages 3.
HNP Unit 1 and Unit 2 Technical Specifications Bases Marked-Up Pages (Information Only) 4.
HNP PRA Acceptability Report