Summary of May 21, 2018, Pre-submittal Public Teleconference with Southern Nuclear Operating Company, Inc. to Discuss the Upcoming License Amendment Request to Remove the Dedicated Shift Technical Advisor
ML18142B045
Person / Time
Site: Hatch, Vogtle, Farley  Southern Nuclear icon.png
Issue date: 05/24/2018
From: Michael Orenak
Plant Licensing Branch II
To:
Southern Nuclear Operating Co
Orenak M
References
EPID L-2018-LRM-0032
Download: ML18142B045 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 24, 2018 LICENSEE:

Southern Nuclear Operating Company.

FACILITY:

Edwin I. Hatch Nuclear Plant, Units. 1 and 2, Joseph M. Farley Nuclear Plant, Units 1 and 2, and Vogtle Electric Generating Plant, Units 1 and 2

SUBJECT:

SUMMARY

OF MAY 21, 2018, PRE-SUBMITTAL PUBLIC TELECONFERENCE WITH SOUTHERN NUCLEAR OPERATING COMPANY, INC. TO DISCUSS THE PROPOSED LICENSE AMENDMENT REQUEST TO REMOVE THE DEDICATED SHIFT TECHNICAL ADVISOR FROM TECHNICAL SPECIFICATION 5.2.2.G AND FROM THE STANDARD EMERGENCY PLAN SITE ANNEXES (EPID L-2018-LRM-0032)

On May 21, 2018, a Category 1 pre-submittal public teleconference was held between the U.S. Nuclear Regulatory Commission (NRC) staff and representatives of Southern Nuclear Operating Company, Inc. (SNC, the licensee). The purpose of the teleconference was to discuss with the licensee's planned proposed license amendment request (LAR) to remove the dedicated shift technical advisor (STA) position requirement from technical specification (TS) 5.2.2.g and to reduce the required staffing for their respective standard emergency plan site annexes for the Edwin I. Hatch Nuclear Plant, Units 1 and 2 (Hatch), Joseph M. Farley Nuclear Plant, Units 1 and 2 (Farley), the Vogtle Electric Generating Plant, Units 1 and 2 (Vogtle).

The meeting notice and agenda, dated May 4, 2018, are located at Agencywide Documents Access and Management System (ADAMS) Accession No. ML18137A051. A list of meeting attendees is provided in the enclosure to this meeting summary.

Meeting Summary After introductions, the licensee provided an overview of the proposed LAR and how the changes will continue to meet the," Commission Policy Statement on Engineering Expertise on Shift," and other regulations and guidance documents. In particular, the licensee discussed proposed adoption of Option 1 of the Commission Policy Statement that provides for a combined SRO/STA position. The licensee detailed the expected wording changes for TS 5.2.2.g for Hatch, Farley, and Vogtle.

The licensee discussed the emergency plan staffing studies for Hatch and Farley that will be used to justify the changes to TS 5.2.2.g. During this discussion, the NRC staff asked if the STA would be a dedicated position, or a collateral duty, during an emergency. The licensee responded that during emergency situations, there will be no overlap in positions.

The NRC staff questioned if SNC has assigned duties during an emergency drill/event to assure that no staff member will have two roles concurrently. The licensee responded that there will be 5 senior reactor operators (SROs) on every shift and that no SRO will have two roles at the same time.

At the conclusion of the meeting, the NRC staff suggested that the licensee consider providing the full emergency plan staffing studies that were performed in addition to the summary to support the proposed LAR.

One question from the public was received. The member of the pubic asked the NRC staff if the move from a dedicated STA position to a dual-role senior reactor operator/STA function was common in the nuclear industry. The NRC staff responded that guidance exists for these types of LARs and licensees have submitted these types of LARs in the past.

Two members of the public were in attendance. No Public Meeting Feedback Forms were received.

Please direct any inquiries to me at 301-415-3229 or Michael.Orenak@nrc.gov.

Docket Nos. 50-321, 50-366, 50-348, 50-364, 50-424, and 50-425

Enclosure:

List of Attendees Michael D Orenak, Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

LIST OF ATTENDEES MAY 21, 2018, PUBLIC TELECONFERENCE WITH SOUTHERN NUCLEAR OPERATING COMPANY, INC.

REGARDING REMOVING THE SHIFT TECHNICAL ADVISOR FROM TS 5.2.2.G AND FROM THE STANDARD EMERGENCY PLAN SITE ANNEXES EDWIN I. HATCH NUCLEAR PLANT, UNIT NOS. 1 AND 2 JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2 VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2 NAME Michael Orenak Michael Norris DaBin Ki Caroline Tilton Ryan Joyce Jamie Coleman Ernest Bates Ricky Collings Gregg Ellis Charlton Salter Bill Freebairn Greg Richardson ORGANIZATION U.S. Nuclear Regulatory Commission (NRC)

NRC NRC NRC Southern Nuclear Operating Company (SNC)

SNC SNC SNC SNC SNC S&P Global Platts Engineering Planning and Management, Inc.

Enclosure

ML181428045 OFFICE D0RL/LPL2-1 /PM D0RL/LPL2-1/LA D0RL/LPL2-1 /BC D0RL/LPL2-1 /PM NAME MOrenak KGoldstein MMarkley MOrenak DATE 5/22/18 5/22/18 5/22/18 5/24/18