Letter Sequence Meeting |
---|
EPID:L-2020-LRM-0117, Slides - SNC Slides - Pre-Submittal Meeting on January 26, 2021 - Hatch NFPA-805 LAR (Open) |
|
MONTHYEARML20350B7092020-12-15015 December 2020 Pre-Submittal Meeting - Hatch Proposed National Fire Protection Association (NFPA)-805 Supplemental License Amendment Request Project stage: Meeting ML21021A2462021-01-21021 January 2021 Slides - SNC Slides - Pre-Submittal Meeting on January 26, 2021 - Hatch NFPA-805 LAR Project stage: Request ML21028A0532021-02-0303 February 2021 Summary of Public Meeting with Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Request to Supplement National Fire Protection Association (NFPA)-805, Performance-Based Standard for Fire Protection for Project stage: Meeting 2021-01-21
[Table View] |
Similar Documents at Hatch |
---|
Category:Meeting Summary
MONTHYEARML24290A0792024-10-18018 October 2024 SLR Environmental Preapplication Meeting Summary ML24213A2462024-08-0505 August 2024 Summary of Closed Meeting SNC Fleet - Physical Barriers Exemption ML24156A1772024-06-11011 June 2024 Summary of June 6, 2024, Closed Meeting Held with Southern Nuclear Operating Company, Inc., Regarding the Physical Barrier Exemptions for Joseph M. Farley Nuclear Plant, Units 1 and 2, Edwin I. Hatch Nuclear Plant, Units 1 and 2, and Vogtle ML24123A0502024-05-0202 May 2024 2023 Annual Assessment Public Meeting Summary Meeting Number 20240479 ML24019A1932024-01-30030 January 2024 Summary of January 8, 2024, Observation Pre-Submittal Meeting Held with Southern Nuclear Operating Company Regarding a Proposed LAR for Vogtle Electric Generating Plant, Units 1, 2, 3, & 4; Hatch, Units 1 & 2; Farley, Units 1 & 2 ML24012A1592024-01-30030 January 2024 Summary of January 8, 2024, Meeting Held with Southern Nuclear Operating Company, Inc., to Discuss a RAI License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Head Bolts ML23356A0282023-12-27027 December 2023 December 11, 2023, Pre-Application Meeting with SNC Regarding a Proposed Fleet LAR to Revise TS 5.3.1 to Relocate Training Qualification Requirements from TS to Their Qatr/Ndqam ML23338A2592023-12-0808 December 2023 Summary of Observation Public Meeting Held with Southern Nuclear Operating Company, Inc., Regarding a License Amendment Request for the Reactor Pressure Vessel Head Closure Bolts for Hatch, Units 1 & 2 (EPID No. L-2022-LLA- 0120) ML23311A1302023-11-17017 November 2023 Summary of Nov. 6, 2023, - Closed Meeting Held with Southern Nuclear Operating Company, Inc., Regarding Physical Barriers Exemptions for Hatch Units 1 & 2, Farley Units 1 & 2 and Vogtle Units 1, 2, 3 & 4 (EPID L-2023-LLE-0018 & L-2023-LLE-0 ML23244A0312023-09-18018 September 2023 MTS - Meeting Summary - Pre-Submittal Meeting on August 02, 2023 - RICT 45-day Extension for TS 3.7.1 & 3.7.2 ML23136B2942023-05-19019 May 2023 Summary of May 02, 2023, Observation Public Meeting Held with Southern Nuclear Operating Company, Inc., Regarding a LAR for the Reactor Pressure Vessel Head Closure Bolts for Edwin I. Hatch Nuclear Plant, Units 1 and 2 ML23088A3882023-04-0303 April 2023 Summary of March 28, 2023, Observation Public Meeting Held with SNC, Regarding a License Amendment Request Regarding the Reactor Pressure Vessel Head Closure Bolts for Edwin I. Hatch Nuclear Plan, Units 1 and 2 ML23088A2362023-03-28028 March 2023 SNC Presentation - Public Meeting - 03-28-2023 - Page from ML22231B055 ML22243A1912022-09-0707 September 2022 Public Pre-Submittal Meeting on August 1, 2022 - Revise TS Table 1.1-1 Modes to Relax RPV Head Closure Studs ML22200A0432022-07-22022 July 2022 Summary of June 22, 2022, Pre-Submittal Meeting W/Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Request to Re-Write TS 3.7.2, Plant Service Water and Ultimate Heat Sink for Edwin I. Hatch Nuclear ML22108A1382022-04-18018 April 2022 Annual Assessment Public Meeting Summary ML21278A5572021-10-25025 October 2021 Meeting Summary - Pre-Submittal Meeting on October 5, 2021 - Hatch NFPA 805 License Amendment Request ML21251A5372021-09-20020 September 2021 September 7, 2021, Summary of Follow-Up, Public, Pre-Licensing Meeting with Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Request to Adopt TSTF-505 for Edwin I. Hatch Nuclear Plant, Units 1 and 2 ML21229A0072021-09-10010 September 2021 Summary of Public Meeting with Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Request to Adopt TSTF-505 ML21232A2622021-09-0101 September 2021 Summary of Public Meeting with Southern Nuclear Operating Company Regarding Proposed LAR to Remove Function 1.f (Main Steam Line Isolation-Turbine Building Area Temperature-High) from TS Table 3.3.6.1A-7 for Hatch Units 1&2 (L-2021-LRM-0081 ML21124A1232021-05-0404 May 2021 April 27, 2021, Public Meeting Summary Joseph M. Farley Nuclear Plant Units 1 and 2, Edwin I. Hatch Nuclear Plant Units 1 and 2, Docket No. 50-348, 50-364, 50-321, 50-366, Meeting Number ML21117A030 ML21102A3112021-04-19019 April 2021 Corrected - 03/31/2021 Summary of Public Meeting with Southern Nuclear Operating Company, Inc., Regarding a Proposed Licensing Action Request to Change the Quality Assurance Topical Report ML21092A0082021-04-0808 April 2021 Summary of March 31, 2021, Public Meeting with Southern Nuclear Operating Company, Inc., Regarding a Proposed Licensing Action Request to Change the Technical Specification Related to Heat Flux Hot Channel Factor ML21028A0532021-02-0303 February 2021 Summary of Public Meeting with Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Request to Supplement National Fire Protection Association (NFPA)-805, Performance-Based Standard for Fire Protection for ML20318A0752020-11-16016 November 2020 Summary of November 12, 2020, Public Meeting with Southern Nuclear Operating Company, Inc., Regarding a License Amendment Request for the Emergency Plan ML20289A4242020-11-0404 November 2020 Summary of Public Meeting with Southern Nuclear Operating Company, Inc. Regarding Proposed License Amendment Request to Remove Function 1.f from Technical Specification Table 3.3.6.1A-7 for Hatch, Units 1 and 2 ML20217L3692020-08-13013 August 2020 Summary of Meeting Joseph M. Farley Nuclear Plant, Units 1 and 2; Edwin I. Hatch, Units 1 and 2; and Vogtle Electric Generating Plant, Units 1, 2, 3, and 4 a LAR for the Emergency Plan (EPID Nos. L-2020-LLA0150 and L-2020-LLA-015 ML20162A1622020-06-16016 June 2020 June 10, 2020, Summary of Public Mtg with Southern Nuclear Operating Company, Inc., a Proposed License Amendment Request for a One-Time Completion Time for the Emergency Diesel Generator Using a Risk-Informed Approach ML20154K7242020-06-0202 June 2020 EOC Meeting Summary ML19123A3542019-05-0202 May 2019 Public Meeting Summary - Hatch Nuclear Plant, Docket Nos. 50-321 and 50-366 ML19114A0062019-04-30030 April 2019 Summary of July 31, 2018, Pre-Application Meeting with Southern Nuclear to Discuss Proposed Changes to Secondary Containment Technical Specifications (EPID L-2018-LEM-0047 ML19038A3462019-02-15015 February 2019 Summary of Meeting with the Nuclear Regulatory Commission and Southern Nuclear Operating Company, Inc. Regarding Pre-Submittal of a License Amendment Request for Proposed Changes to Emergency Response Organization Staffing and Augmentation ML18284A0222018-10-16016 October 2018 August 23, 2018, Summary of Pre-Application Meeting with Southern Nuclear Operating Company, Inc. to Discuss TSTF-51 and TSTF-471 ML18142B0452018-05-24024 May 2018 Summary of May 21, 2018, Pre-submittal Public Teleconference with Southern Nuclear Operating Company, Inc. to Discuss the Upcoming License Amendment Request to Remove the Dedicated Shift Technical Advisor ML18124A0052018-05-0404 May 2018 Summary of Public Meeting - Hatch Nuclear Plant Docket Nos. 50-321, 50-366 ML17131A1572017-05-11011 May 2017 Summary of Public Meeting Concerning Annual Assessment of Edwin I. Hatch Nuclear Plant, Units 1 and 2 ML17093A9172017-04-21021 April 2017 Summary of 3/23/2017, Pre-Submittal Public Meeting with Southern Nuclear Operating Company, Inc. to Discuss the Proposed License Amendment Requests Regarding TSTF-542, Reactor Pressure Vessel Water Inventory Controls, and SR3.3.1.3 (CAC Nos ML17030A4372017-02-15015 February 2017 Summary of Public Meeting with Southern Nuclear Operating Company, Inc. to Discuss the Degraded Grid Voltage Proposed License Amendment Request ML16179A1862016-06-30030 June 2016 Summary of Public Meeting with Southern Nuclear Operating Company to Discuss Delay of Application Date for NFPA 805 License Amendment Request for Edwin I. Hatch Nuclear Plant, Units Nos. 1 and 2 ML16085A1762016-03-29029 March 2016 Summary of March 24, 2016, Meeting with Southern Nuclear Operating Company Regarding Planned Physical Protection Modifications ML15195A4812015-08-31031 August 2015 July 13, 2015, Summary of Meeting with SNC on High Density Polyethylene Piping for HNP-2 ML15125A0872015-05-26026 May 2015 May 12, 2015 Summary of Meeting with Southern Nuclear Operating Company to Discuss a Future Fleet Standard Emergency Plan Submittal ML15121A0342015-04-30030 April 2015 Summary of Public Meeting to Discuss the 2014 Annual Performance Assessment of the Edwin I. Hatch Nuclear Plant ML15103A0602015-04-30030 April 2015 April 22, 2015, Summary of Meeting with Southern Nuclear Operating Company to Discuss a Future Fleet Standard Emergency Plan Submittal ML14122A0372014-05-0808 May 2014 April 23, 2014 Summary of Meeting with Southern Nuclear Operating Company to Discuss Grid Design Criteria ML14115A4102014-04-25025 April 2014 Summary of Public Meeting to Discuss Annual Assessment of Edwin I. Hatch Nuclear Plant, Units 1 and 2, in Vidalia, Georgia ML13225A2932013-08-12012 August 2013 7/23-24/2013, Summary of Meeting 2013 U.S. Nuclear Regulatory Commission (NRC) Initial Exam Writers' Workshop ML13112A2552013-04-22022 April 2013 Summary of Public Meeting to Discuss the Annual Assessment of Edwin I. Hatch Nuclear Plant with the Public for the Period of January 1, 2012, - December 31, 2012 ML12115A2572012-04-24024 April 2012 Summary of with Southern Nuclear Operating Co., Inc., to Discuss the Annual Assessment of Edwin I. Hatch for 2011 ML11292A1612011-10-20020 October 2011 Summary of Meeting with Beyond Nuclear Regarding Their 10 CFR 2.206 Petition to Suspend Operating Licenses of General Electric Mark I Boiling Water Reactors 2024-08-05
[Table view] |
Text
February 3, 2021 LICENSEE: Southern Nuclear Operating Company, Inc.
FACILITY: Edwin I. Hatch Nuclear Plant, Units 1 and 2
SUBJECT:
SUMMARY
OF JANUARY 26, 2021, PUBLIC MEETING WITH SOUTHERN NUCLEAR OPERATING COMPANY, INC., REGARDING A PROPOSED LICENSE AMENDMENT REQUEST TO SUPPLEMENT NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)-805, PERFORMANCE-BASED STANDARD FOR FIRE PROTECTION FOR LIGHT WATER REACTOR ELECTRIC GENERATING PLANTS, FOR EDWIN I. HATCH NUCLEAR PLANT, UNITS 1 AND 2 (EPID NO. L-2020-LRM-0117)
On January 26, 2021, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Southern Nuclear Operating Company, Inc. (SNC, the licensee). The purpose of the meeting was for SNC to describe its plan to submit a license amendment request (LAR) to supplement National Fire Protection Association (NFPA)-805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, for Edwin I. Hatch Nuclear Plant (Hatch), Units 1 and 2.
A list of attendees is provided as an Enclosure.
On December 15, 2020 (Agencywide Document and Access Management System (ADAMS)
Accession No. ML20350B709), the meeting was noticed on the NRC public webpage.
The SNC presented slides contained in ADAMS Accession No. ML21021A246.
Introduction The NRC staff opened the meeting with introductory remarks and introduction of the attendees.
The SNC staff discussed the following topics: (1) background information on the NFPA-805 submittal, and (2) the proposed LAR.
Background
By letter dated June 11, 2020 (ADAMS Accession No. ML20066F592), the NRC issued Amendment No. 304 to Renewed Facility Operating License (RFOL) No. DPR-57 and Amendment No. 249 to RFOL No. NPF-5 for Hatch, Unit Nos 1 and 2, respectively. The amendments consist of changes to the RFOLs and Technical Specifications (TSs) in response to SNCs application dated April 4, 2018 (ADAMS Accession No. ML18096A936), as supplemented by letters dated May 28, August 9, October 7, December 13, 2019, February 5, and March 13, 2020 (ADAMS Accession Nos. ML19151A444, ML19225D178, ML19280C812, ML19351D121, ML20036F588, and ML20073M564 respectively).
The amendments transition the Hatch Fire Protection Program from Title 10 of the Code of Federal Regulations (10 CFR), Sections 50.48(a) and (b), to 10 CFR 50.48(c), National Fire Protection Association (NFPA) 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition.
The Renewed Facility Operating License (RFOL) states:
The licensee shall implement the modifications described in Attachment S2, Table S-2, Plant Modifications Committed, of SNC letter NL-19-1475, dated December 13, 2019, to its facility to complete transition to full compliance with 10 CFR 50.48(c) by the startup of the second refueling outage (for each unit) after issuance of the NRC SE. The licensee shall maintain appropriate compensatory measures in place until completion of the modifications delineated above.
The licensee shall implement the items as listed in Attachment S2, Table S-3, Implementation Items, of SNC letter NL-19-1475, dated December 13, 2019, within 365 days after the issuance of the NRC SE. An exception to this statement is for the completion date for Implementation Item IMP-19. This item will be completed for each unit at a time not to exceed 180 days after all modifications for the respective unit (as listed in Attachment S2, Table S-2) are operable.
The second refueling outage (RFO) for Hatch, Units 2 and 1, are by startup of spring 2023 RFO 2R27, and by startup of spring 2024 RFO 1R31, respectively.
Subsequent to issuance of Hatch Amendment Nos. 304 and 249, SNC discovered that additional breakers lacked proper coordination. SNC is evaluating the extent of condition to ensure all breaker coordination issues are identified.
Proposed LAR SNC stated that the proposed LAR will revise Hatch, Units 1 and 2, RFOL to reference updated Table S-2 for list of required modifications that must be implemented to achieve full compliance with NFPA-805. SNC said that the revised RFOL will specify the modifications are required by the startup of the Unit 2 spring 2023 RFO, U2R27, and by the startup of the Unit 1 spring 2024 RFO, U1R31.
SNC stated that the proposed LAR will discuss the NFPA-805 requirements for proper breaker coordination, and the assumptions used in Fire Probabilistic Risk Assessment (PRA) model.
Further, SNC said that the proposed LAR will discuss that updated Table S-2 will not affect Fire PRA model. Lastly, SNC said that the proposed LAR will discuss that the LAR will not impact the NFPA-805 modification schedule contained in the current RFOL to achieve full compliance with 10 CFR 50.48(c).
SNC stated that the proposed LAR would provide the below revised RFOL condition:
The licensee shall implement the modifications described in Attachment S2, Table S-2, Plant Modifications Committed, of SNC letter NL-19-1475 NL XXXX, dated December 13, 2019 Month, Day, 2021, to its facility to complete transition to full compliance with 10 CFR 50.48(c) by the startup of the second refueling outage (for each unit) after the issuance of the NRC SE Unit 2 refueling outage 2R27 (spring 2023) and Unit 1 refueling outage 1R31 (spring 2024). The licensee shall maintain appropriate compensatory measures in place until completion of these modifications.
SNC said the Attachment S modification items will be consistent with Table S-2 referenced in current RFOLs, with the inclusion of the additional required breaker coordination modifications.
NRC Questions to SNC The NRC staff questioned the impact on the plant probability risk assessment (PRA). SNC stated that the conclusions in the NRC amendment, dated June 11, 2020, will remain unchanged with the proposed LAR. The NRC staff questioned the breaker coordination. SNC said that for equipment not affected by fire, NFPA-805 requires that a fire-induced cable failure on a separate load circuit supplied from the same power source would not affect this equipment.
The NRC staff asked about compensatory measures regarding the breaker coordination issue.
SNC stated that it is evaluating the extent of condition to ensure all breaker coordination issues are identified. The NRC staff questioned whether SNC is proposing this LAR because of the license condition specificity or the regulation. SNC said it would ensure that information is complete for both in the proposed LAR.
Public Questions to NRC There was one member of the public in attendance, but this person did not have any questions.
Closing The NRC staff made no regulatory decisions during the meeting.
Once received, the NRC staff will perform a thorough review of the proposed LAR and make any regulatory decisions in writing in a timely manner.
Public Meeting Feedback forms were available, but no comments were received.
The meeting adjourned at 2:47 pm (Eastern time).
Please direct any inquiries to me at 301-415-3100.
/RA/
John G. Lamb, Senior Project Manager Plant Licensing Branch, II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-321 and 50-366
Enclosure:
List of Attendees cc w/encls: Listserv
LIST OF ATTENDEES JANUARY 26, 2021, PUBLIC MEETING WITH SOUTHERN NUCLEAR COMPANY REGARDING NFPA-805 SUPPLEMENT EDWIN I. HATCH NUCLEAR POWER PLANT, UNITS 1 AND 2 ATTENDEE REPRESENTING John G. Lamb NRC Mike Markley NRC Jay Robinson NRC Vijay Goel NRC Shilp Vasavada NRC Hari Kodali NRC JS Hyslop NRC Tim Enfinger SNC Ryan Joyce SNC Steve Hardy SNC Sandy Naccarato SNC John Jarriel SNC Jamie Coleman SNC Jimmy Collins SNC Jeff Quinn Public - EPM Enclosure
ML21021A235 (Package)
ML20350B709 (Meeting Notice)
ML21028A053 (Meeting Summary)
ML21021A246 (Slides)
OFFICE DORL/LPL2-1/PM DORL/LPL2-1/LA DRA/APLC/BC DORL/LPL2-1/BC DORL/LPL2-1/PM NAME JLamb KGoldstein SVasavada MMarkley JLamb DATE 01/26/2021 01/28/2021 01/27/2021 02/02/2021 02/03/2021