ML24069A001

From kanterella
Jump to navigation Jump to search
– Correction of Amendment No. 266 Regarding License Amendment Request Regarding Relocation of Specific Surveillance Frequencies to a Licensee-Controlled Program (TSTF-425, Revision 3)
ML24069A001
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 03/09/2024
From: John Lamb
Plant Licensing Branch II
To: Coleman J
Southern Nuclear Operating Co
Kalathiveettil, D
References
Download: ML24069A001 (1)


Text

March 9, 2024 Jamie M. Coleman Regulatory Affairs Director Southern Nuclear Operating Co., Inc.

3535 Colonnade Parkway Birmingham, AL 35243

SUBJECT:

EDWIN I. HATCH NUCLEAR PLANT, UNIT 1 - CORRECTION OF AMENDMENT NO. 266 REGARDING LICENSE AMENDMENT REQUEST REGARDING RELOCATION OF SPECIFIC SURVEILLANCE FREQUENCIES TO A LICENSEE-CONTROLLED PROGRAM (TSTF-425, REVISION 3)

Dear Jamie Coleman:

On January 3, 2012, the U.S. Nuclear Regulatory Commission (NRC) issued Amendment No. 266 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML11108A129) to Renewed Facility Operating License (RFOLs) DPR-57 for the Edwin I.

Hatch Nuclear Plant (Hatch), Unit 1.

The amendment revised the Hatch, Unit 1, technical specifications (TSs) by relocating specific surveillance frequencies to a licensee-controlled program using a risk-informed justification, Technical Specification Task Force Traveler (TSTF)-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control -RITSTF [Risk-Informed TSTF] Initiative 5b (ML090850642).

An administrative error on the part of the NRC staff was made on the issuance of TS page TS 3.7-17. The NOTE for Surveillance Requirement (SR) 3.7.6.1 was inadvertently left off the revised TS page.

By letter dated October 29, 2010 (ML103140510), Southern Nuclear Operating Company (SNC, the licensee) submitted its license amendment request (LAR) for TSTF-425, Revision 3.

SR 3.6.6.1 on TS page TS 3.7-17 has the following NOTE:


NOTE--------------------------------------

Not required to be performed until 31 days after any main steam line not isolated and SJAE in operation.

Consistent with NRC staff guidance dated January 16, 1997 (ML103260096) and based on the NRCs policy established by SECY-96-238, these errors can be corrected by a letter to the licensee from the NRC staff. These changes do not affect the NRC decision approving amendment No. 266 and do not affect the No Significant Hazards Consideration as published in the Federal Register.

Enclosed please find corrected Hatch, Unit 1, TS page TS-3.6-17.

If you have any questions, please contact me at 301-415-3100 or John.Lamb@nrc.gov.

Sincerely,

/RA/

John G. Lamb, Senior Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No.: 50-321

Enclosure:

As stated cc: Listserv

Main Condenser Offgas 3.7.6 HATCH UNIT 1 3.7-17 Amendment No. 266 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.6.1


NOTE------------------------------

Not required to be performed until 31 days after any main steam line not isolated and SJAE in operation.

Verify the gross gamma activity rate of the noble gases is 240 mCi/second.

In accordance with the Surveillance Frequency Control Program AND Once within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> after a 50% increase in the nominal steady state fission gas release after factoring out increases due to changes in THERMAL POWER level

ML24069A001 OFFICE NRR/DORL/LPL2-1/PM NRR/DORL/LPL2-1/LA NRR/DORL/LPL2-1/BC NRR/DORL/LPL2-1/PM NAME JLamb KGoldstein MMarkley JLamb DATE 03/09/2024 03/09/2024 03/09/2024 03/09/2024