ML20154K724
ML20154K724 | |
Person / Time | |
---|---|
Site: | Hatch, Farley |
Issue date: | 06/02/2020 |
From: | Necota Staples NRC/RGN-II/DRP/RPB2 |
To: | Alan Blamey NRC/RGN-II/DRP/RPB2 |
References | |
Download: ML20154K724 (2) | |
Category:Meeting Summary
MONTHYEARML24290A0792024-10-18018 October 2024
[Table view]SLR Environmental Preapplication Meeting Summary ML24270A2112024-10-0404 October 2024 September 23, 2024, Summary of Observation Pre-Submittal Meeting Held with Southern Nuclear Operating Company, Inc., Regarding Proposed LAR to Be Excepted from Footnote 11 Listed in Regulatory Guide 1.183, Rev. 0, for Farley 1 & 2 ML24226B2112024-08-22022 August 2024 Regulatory Audit Summary in Support of License Amendment Requests to Revise Technical Specification 3.6.5, Containment Air Temperature, Actions ML24213A2462024-08-0505 August 2024 Summary of Closed Meeting SNC Fleet - Physical Barriers Exemption ML24198A0772024-07-18018 July 2024 Summary of Observation Public Meeting Held with SNC Regarding Previous LAR to Revise TS 3.6.5 Completion Time Increase Using Risk-Informed Process for Evaluation to Increase for Farley Nuclear Plant, Units 1 and 2 ML24156A1772024-06-11011 June 2024 Summary of June 6, 2024, Closed Meeting Held with Southern Nuclear Operating Company, Inc., Regarding the Physical Barrier Exemptions for Joseph M. Farley Nuclear Plant, Units 1 and 2, Edwin I. Hatch Nuclear Plant, Units 1 and 2, and Vogtle ML24138A0092024-05-17017 May 2024 Public Meeting Summary - 2023 Annual Assessment Meeting for Joseph M. Farley, Units 1 and 2 Docket No. 50-348, and 50-364 -Meeting Number 20240474 ML24123A0502024-05-0202 May 2024 2023 Annual Assessment Public Meeting Summary Meeting Number 20240479 ML24093A0612024-04-18018 April 2024 April 1, 2024, Summary of Observation Pre-Submittal Meeting Held with Southern Nuclear Operating Company, Inc., Proposed Alternative Requests to the Extend Examination Intervals for Joseph M. Farley Nuclear Plant and Vogtle ML24096A1832024-04-12012 April 2024 Summary of April 3, 2024, Observation Pre-Submittal Meeting Held with Southern Nuclear Operating Company, Inc., Regarding Proposed License Amendment Request to Revise Technical Specification 3.6.5 ML24012A1592024-01-30030 January 2024 Summary of January 8, 2024, Meeting Held with Southern Nuclear Operating Company, Inc., to Discuss a RAI License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Head Bolts ML24019A1932024-01-30030 January 2024 Summary of January 8, 2024, Observation Pre-Submittal Meeting Held with Southern Nuclear Operating Company Regarding a Proposed LAR for Vogtle Electric Generating Plant, Units 1, 2, 3, & 4; Hatch, Units 1 & 2; Farley, Units 1 & 2 ML23356A0282023-12-27027 December 2023 December 11, 2023, Pre-Application Meeting with SNC Regarding a Proposed Fleet LAR to Revise TS 5.3.1 to Relocate Training Qualification Requirements from TS to Their Qatr/Ndqam ML23338A2592023-12-0808 December 2023 Summary of Observation Public Meeting Held with Southern Nuclear Operating Company, Inc., Regarding a License Amendment Request for the Reactor Pressure Vessel Head Closure Bolts for Hatch, Units 1 & 2 (EPID No. L-2022-LLA- 0120) ML23311A1302023-11-17017 November 2023 Summary of Nov. 6, 2023, - Closed Meeting Held with Southern Nuclear Operating Company, Inc., Regarding Physical Barriers Exemptions for Hatch Units 1 & 2, Farley Units 1 & 2 and Vogtle Units 1, 2, 3 & 4 (EPID L-2023-LLE-0018 & L-2023-LLE-0 ML23244A0312023-09-18018 September 2023 MTS - Meeting Summary - Pre-Submittal Meeting on August 02, 2023 - RICT 45-day Extension for TS 3.7.1 & 3.7.2 ML23146A1672023-05-31031 May 2023 Public Meeting Summary–2022 Annual Assessment Meeting for Joseph M. Farley, Units 1 and 2 Docket No. 50?348, and 50?364 Meeting Number 20230610 ML23136B2942023-05-19019 May 2023 Summary of May 02, 2023, Observation Public Meeting Held with Southern Nuclear Operating Company, Inc., Regarding a LAR for the Reactor Pressure Vessel Head Closure Bolts for Edwin I. Hatch Nuclear Plant, Units 1 and 2 ML23094A1092023-04-14014 April 2023 Summary of Conference Call Held with SNC, Regarding Regulatory Issue Summary 2000-11, Supplement 2, NRC Emergency Telecommunications System, for Joseph M. Farley Nuclear Plant, Units 1 and 2, and SNC Emergency Operations Facility ML23088A3882023-04-0303 April 2023 Summary of March 28, 2023, Observation Public Meeting Held with SNC, Regarding a License Amendment Request Regarding the Reactor Pressure Vessel Head Closure Bolts for Edwin I. Hatch Nuclear Plan, Units 1 and 2 ML23088A2362023-03-28028 March 2023 SNC Presentation - Public Meeting - 03-28-2023 - Page from ML22231B055 ML22243A1912022-09-0707 September 2022 Public Pre-Submittal Meeting on August 1, 2022 - Revise TS Table 1.1-1 Modes to Relax RPV Head Closure Studs ML22200A0432022-07-22022 July 2022 Summary of June 22, 2022, Pre-Submittal Meeting W/Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Request to Re-Write TS 3.7.2, Plant Service Water and Ultimate Heat Sink for Edwin I. Hatch Nuclear ML22172A2142022-07-11011 July 2022 June 16, 2022, Summary of Public Meeting with Southern Nuclear Operating Company, Inc., a Proposed License Amendment Request to Modify the Technical Specifications Regarding Pressurizer Safety Valve Setpoints at the Joseph M. Farley Nuclear ML22108A1382022-04-18018 April 2022 Annual Assessment Public Meeting Summary ML21313A1172021-11-18018 November 2021 Summary of Public Meeting with Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Request to Change the Technical Specification Related to Technical Specification 5.5.16 for Joseph M. Farley Nuclear Plant ML21288A3312021-11-0404 November 2021 Summary of October 14, 2021, Public Meeting with SNC, Inc., Regarding Proposed LAR to Modify the TSs to Increase Containment Peak Pressure to Address Several Nuclear Safety Advisory Letters L-2021-LRM-0097 ML21278A5572021-10-25025 October 2021 Meeting Summary - Pre-Submittal Meeting on October 5, 2021 - Hatch NFPA 805 License Amendment Request ML21251A5372021-09-20020 September 2021 September 7, 2021, Summary of Follow-Up, Public, Pre-Licensing Meeting with Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Request to Adopt TSTF-505 for Edwin I. Hatch Nuclear Plant, Units 1 and 2 ML21229A0072021-09-10010 September 2021 Summary of Public Meeting with Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Request to Adopt TSTF-505 ML21232A2622021-09-0101 September 2021 Summary of Public Meeting with Southern Nuclear Operating Company Regarding Proposed LAR to Remove Function 1.f (Main Steam Line Isolation-Turbine Building Area Temperature-High) from TS Table 3.3.6.1A-7 for Hatch Units 1&2 (L-2021-LRM-0081 ML21176A1712021-07-0606 July 2021 Summary of June 24, 2021, Public Meeting Regarding a Proposed LAR to Permanently Remove the Encapsulation Vessels Around Containment Sump Recirculation Valves ML21124A1232021-05-0404 May 2021 April 27, 2021, Public Meeting Summary Joseph M. Farley Nuclear Plant Units 1 and 2, Edwin I. Hatch Nuclear Plant Units 1 and 2, Docket No. 50-348, 50-364, 50-321, 50-366, Meeting Number ML21117A030 ML21102A3112021-04-19019 April 2021 Corrected - 03/31/2021 Summary of Public Meeting with Southern Nuclear Operating Company, Inc., Regarding a Proposed Licensing Action Request to Change the Quality Assurance Topical Report ML21092A0082021-04-0808 April 2021 Summary of March 31, 2021, Public Meeting with Southern Nuclear Operating Company, Inc., Regarding a Proposed Licensing Action Request to Change the Technical Specification Related to Heat Flux Hot Channel Factor ML21063A3282021-03-12012 March 2021 Public Mtg Summary March 4, 2021 with Southern Nuclear Operating Company, Inc., a Proposed LAR to Change the TS Related to Heat Flux Hot Channel Factor for Joseph M. Farley Nuclear Plant, Units 1 & 2, and Vogtle Electric Generating Plant, U ML21047A2622021-02-19019 February 2021 Summary of Public Meeting with Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Request to Change the Core Power Distribution Monitoring System ML21028A0532021-02-0303 February 2021 Summary of Public Meeting with Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Request to Supplement National Fire Protection Association (NFPA)-805, Performance-Based Standard for Fire Protection for ML20318A0752020-11-16016 November 2020 Summary of November 12, 2020, Public Meeting with Southern Nuclear Operating Company, Inc., Regarding a License Amendment Request for the Emergency Plan ML20289A4242020-11-0404 November 2020 Summary of Public Meeting with Southern Nuclear Operating Company, Inc. Regarding Proposed License Amendment Request to Remove Function 1.f from Technical Specification Table 3.3.6.1A-7 for Hatch, Units 1 and 2 ML20217L3692020-08-13013 August 2020 Summary of Meeting Joseph M. Farley Nuclear Plant, Units 1 and 2; Edwin I. Hatch, Units 1 and 2; and Vogtle Electric Generating Plant, Units 1, 2, 3, and 4 a LAR for the Emergency Plan (EPID Nos. L-2020-LLA0150 and L-2020-LLA-015 ML20162A1622020-06-16016 June 2020 June 10, 2020, Summary of Public Mtg with Southern Nuclear Operating Company, Inc., a Proposed License Amendment Request for a One-Time Completion Time for the Emergency Diesel Generator Using a Risk-Informed Approach ML20154K7242020-06-0202 June 2020 EOC Meeting Summary ML19149A4222019-05-29029 May 2019 Summary of Public Meeting Concerning Annual Assessment of the Farley Nuclear Plant, Units 1 and 2, Docket Nos. 05000348 and 05000361 ML19123A3542019-05-0202 May 2019 Public Meeting Summary - Hatch Nuclear Plant, Docket Nos. 50-321 and 50-366 ML19114A0062019-04-30030 April 2019 Summary of July 31, 2018, Pre-Application Meeting with Southern Nuclear to Discuss Proposed Changes to Secondary Containment Technical Specifications (EPID L-2018-LEM-0047 ML19059A3672019-03-0707 March 2019 March 5, 2019, Meeting Summary Regarding Pre-Application Meeting to Discuss Proposed Amendment to Revise Technical Specification 3.3.1 and 3.3.2 ML19038A3462019-02-15015 February 2019 Summary of Meeting with the Nuclear Regulatory Commission and Southern Nuclear Operating Company, Inc. Regarding Pre-Submittal of a License Amendment Request for Proposed Changes to Emergency Response Organization Staffing and Augmentation ML18318A2532018-11-26026 November 2018 Summary of Pre-Application Meeting to Discuss the Joseph M. Farley Nuclear Plant, Units 1 and 2, Spent Fuel Pool Criticality Analyses and Measurement Uncertainty Recapture Amendments ML18306A3132018-11-0707 November 2018 Summary of October 16, 2018, Meeting with Southern Nuclear Operating Company, Inc., to Discuss the Joseph M. Farley Unit 1 & 2, Electrical Distribution System as It Relates to the Risk-Informed Completion Times Amendment 2024-08-05 Category:Memoranda MONTHYEARML24199A2072024-07-24024 July 2024
[Table view]TS 3-6-5 LAR - Individual Notice Transmittal Letter and NSHC - Rev 1 (1) - Letter ML24138A0092024-05-17017 May 2024 Public Meeting Summary - 2023 Annual Assessment Meeting for Joseph M. Farley, Units 1 and 2 Docket No. 50-348, and 50-364 -Meeting Number 20240474 ML24123A0502024-05-0202 May 2024 2023 Annual Assessment Public Meeting Summary Meeting Number 20240479 ML24047A2092024-02-22022 February 2024 Calendar Year 2023 Baseline Inspection Completion ML23146A1672023-05-31031 May 2023 Public Meeting Summary–2022 Annual Assessment Meeting for Joseph M. Farley, Units 1 and 2 Docket No. 50?348, and 50?364 Meeting Number 20230610 ML22108A1382022-04-18018 April 2022 Annual Assessment Public Meeting Summary ML21280A2962021-10-22022 October 2021 Replacement of Page 2 to Letter Dated June 30, 2020, Titled License Amendment Request to Revise the Emergency Plan to Change Staffing and Extend Staff Augmentation Times for Emergency Response Organization Positions (EPID L-2020-LLA0150) ML21124A1232021-05-0404 May 2021 April 27, 2021, Public Meeting Summary Joseph M. Farley Nuclear Plant Units 1 and 2, Edwin I. Hatch Nuclear Plant Units 1 and 2, Docket No. 50-348, 50-364, 50-321, 50-366, Meeting Number ML21117A030 ML20154K7242020-06-0202 June 2020 EOC Meeting Summary ML19149A4222019-05-29029 May 2019 Summary of Public Meeting Concerning Annual Assessment of the Farley Nuclear Plant, Units 1 and 2, Docket Nos. 05000348 and 05000361 ML19123A3542019-05-0202 May 2019 Public Meeting Summary - Hatch Nuclear Plant, Docket Nos. 50-321 and 50-366 ML18337A0422018-12-0303 December 2018 Reissue- Farley 2019 Exam Corporate Notification Letter ML18124A0052018-05-0404 May 2018 Summary of Public Meeting - Hatch Nuclear Plant Docket Nos. 50-321, 50-366 ML17131A1572017-05-11011 May 2017 Summary of Public Meeting Concerning Annual Assessment of Edwin I. Hatch Nuclear Plant, Units 1 and 2 ML17111A5792017-04-26026 April 2017 Request for Additional Information, Fourth 10-Year ISI Interval Relief Requests ML17104A1382017-04-14014 April 2017 Summary of Meeting to Discuss the Annual Assessment of Farley Nuclear Plant, Units 1 and 2 ML16138A6512016-06-0202 June 2016 Audit of Supporting Design, Licensing & Other Documents Related to License Amendment Requests to Support the Adoption of Technical Specification Task Force Traveler 312 ML16126A0812016-05-0505 May 2016 Summary of Public Meeting with Joseph M. Farley, Units 1 and 2 ML16103A5722016-04-21021 April 2016 Transmittal of Final Farley Nuclear Plant Unit 2, Accident Sequence Precursor Analysis ML16097A6022016-04-0808 April 2016 Audit of Supporting Design, Licensing and Other Documents Related to License Amendment Requests to Support Adoption of Technical Specification Task Force Traveler 312 ML16071A3132016-03-14014 March 2016 Notice of Forthcoming Closed Meeting with Southern Nuclear Operating Company to Discuss the Replacement of Security Computer System at Edwin I. Hatch, Units 1 and 2 ML15253A4032016-03-11011 March 2016 Recommendation for Dispositioning Proposed Generic Issue on the Effects of Downstream Dam Failures on Nuclear Power Plants ML15121A0342015-04-30030 April 2015 Summary of Public Meeting to Discuss the 2014 Annual Performance Assessment of the Edwin I. Hatch Nuclear Plant ML15120A5942015-04-30030 April 2015 Summary of Public Meeting to Discuss 2014 Annual Performance Assessment of the Joseph M. Farley Nuclear Plant ML15055A5622015-02-26026 February 2015 Notice of Forthcoming Closed Meeting to Discuss Dam Failure Analysis for Joseph M. Farley Nuclear Plant, Units 1 and 2 ML14197A5932014-08-0606 August 2014 June 26, 2014, Summary of Category 1 Public Meeting with Southern Nuclear Operating Company to Discuss Seismic Hazard Reevaluations Associated with Implementation of Japan Lessons-Learned Near-Term Task Force Recommendation 2.1 ML14133A0392014-06-0303 June 2014 Summary of Closed Meeting Between Representatives of the Army Corps of Engineers, Nuclear Regulatory Commission, and Southern Nuclear Company to Discuss Dam Failure for the Joseph Farley Nuclear Plant ML14115A4052014-04-25025 April 2014 2013 End of Cycle Farley Public Meeting Summary Memo ML14115A4102014-04-25025 April 2014 Summary of Public Meeting to Discuss Annual Assessment of Edwin I. Hatch Nuclear Plant, Units 1 and 2, in Vidalia, Georgia ML14066A0472014-03-0707 March 2014 Electronic Transmission, Draft Request for Additional Information Regarding License Amendment Request to Adopt Nation Fire Protection Association Standard 805 (TAC ME9741 and ME9742 ML14017A3712014-01-17017 January 2014 Special Inspection Charter to Evaluate the Failure of B Train Solid State Protection System Operability Surveillance Test at Farley Unit 2 ML13309A0802013-12-11011 December 2013 Memorandum to File: Transcript for 10 CFR 2.206 Petition from Beyond Nuclear (Et Al) Regarding General Electric Mark I and Mark II Boiling-Water Reactors ML13277A3822013-11-0404 November 2013 Notice of Forthcoming Meeting with Southern Nuclear on Polyethylene Pipe for Hatch Service Water Systems ML13067A2692013-03-11011 March 2013 03/21/2013 Forthcoming Meeting with Southern Nuclear Company Regarding Voluntary Fire Protection Risk Initiative Amendment Request for Joseph M. Farley Nuclear Plant, Units 1 and 2 ML13050A2862013-02-22022 February 2013 3/7/2013 - Forthcoming Meeting Notice with Southern Nuclear Company to Discuss Responses to Requests for Additional Information Related to Amendment Requests to Transition to the National Fire Protection Association NFPA-805 Methodology ML12003A2272011-12-21021 December 2011 G20110883/EDATS: OEDO-2011-0800 - R. W. Borchardt Memo Re Backfit Appeal Associated with Component Design Bases Inspection at Edwin I. Hatch Nuclear Plant ML11349A0972011-12-15015 December 2011 Verbal Authorization of Inservice Inspection Program Alternative HNP-ISI-ALT-15, Version 2, Associated with Safety Relief Valve Testing ML11250A1712011-09-14014 September 2011 Notice of Forthcoming Meeting with Petitioner Requesting Action Under 10 CFR 2.206 Regarding Immediate Suspension of the Operating Licenses of General Electric (GE) Mark 1 Boiling Water Reactors (Bwrs) ML11208B3162011-07-28028 July 2011 Notice of Closed Meeting with the Southern Nuclear Operating Company, Inc. to Discuss Plant Security Projects and Actions for Upcoming Inspection Activities at the Joseph M. Farley Nuclear Plant ML11126A0962011-05-12012 May 2011 Notice of Meeting with Petitioner Requesting Action Under 10CFR2.206 Regarding Immediate Suspension of Operating Licenses of General Electric Mark 1 Boiling Water Reactors ML1108105442011-03-22022 March 2011 Notice of Cancelled Forthcoming Meeting with Southern Nuclear Operating Company, Inc. (Snc), to Discuss NFPA 805 License Amendment for Joseph M. Farley Nuclear Plant, Units 1 and 2 ML1104804052011-03-0707 March 2011 Notice of Forthcoming Meeting with Southern Nuclear Operating Company to Discuss NFPA 805 License Amendment for Farley ML1016704282010-06-17017 June 2010 Meeting Summary Notice ML0929906142009-10-29029 October 2009 Michael Lesar Memo FRN Order (Effective Immediately) Prohibiting Involvement in NRC-Licensed Activities (NRC Office of Investigations Report No. 2-2008-055) ML0917301322009-06-25025 June 2009 06/07-11/2009-Report on Trip to the Institute of Electrical and Electronics Engineers Stationary Battery Committee Meeting in Rohnert Park, CA ML0908607892009-01-16016 January 2009 3. FEMA Response to NRC Regarding Farley TARs Seven Question, FEMA Memo from Burnside, January 16, 2009 ML0807400842008-03-14014 March 2008 Draft Regulatory Guide for Comment ML0730404832007-10-31031 October 2007 Supplemental Augmented Inspection Team Charter to Evaluate a Farley 1B Residual Heat Removal (RHR) Pump 4.16-kV Breaker Failure ML0722200462007-08-0909 August 2007 Emergency Exercise (August 22, 2007) ML0706400412007-03-0606 March 2007 Commitment Lists for Renewed Operating License (ROL) Plants with No Commitment Appendix Attached to Its ROL Sers/Nuregs for Use with IP-71003 2024-07-24 |
Text
June 2, 2020 MEMORANDUM TO: Alan A. Blamey, Chief Reactor Projects Branch 2 Division of Reactor Projects FROM: Necota L. Staples, Senior Project Engineer /RA/
Reactor Projects Branch 2 Division of Reactor Projects
SUBJECT:
PUBLIC MEETING
SUMMARY
- JOSEPH M. FARLEY NUCLEAR PLANT UNITS 1 AND 2, EDWIN I. HATCH NUCLEAR PLANT UNITS 1 AND 2, DOCKET NO. 50-348, 50-364, 50-321, 50-366, MEETING NUMBER ML20101K849 On April 21, 2020, the Nuclear Regulatory Commission (NRC) conducted an online virtual meeting concerning Joseph M. Farley Nuclear Plant Units 1 and 2, and Edwin I. Hatch Nuclear Plant Units 1 and 2. The purpose of the meeting was to provide opportunities for the public to discuss the annual assessment for the period of January 1, 2019 - December 31, 2019.
In response to the COVID-19 coronavirus and updated Federal Government guidance on travel and social distancing the meeting was held remotely through the Skype for Business application. The following documents related to the meeting are available in ADAMS: Meeting Notice (ML20101K849), Joseph M. Farley Nuclear Plant Annual Assessment Letter (ML20063K834) and Edwin I. Hatch Nuclear Plant Annual Assessment Letter (ML20063L515),
Assessment Meeting Presentation (ML20101K658).
The meeting was conducted from 4:00 PM to 5:30 PM eastern time. There were 21 attendees.
In summary, the attendees consisted of representatives from the NRC, Southern Nuclear Company, and members of the public. Due to the nature of the meeting no official list of attendees is included. NRC staff were available for questions for half an hour. There was minimal interaction with the public which was consistent with the normal meetings conducted near the station. Additionally, the meeting was listed in the Public Meeting Feedback System (PMFS) under Meeting Code (20200353) and upon submittal of this memo there were no public responses to the meeting.
Docket No.: 50-321, 50-366 License No.: DPR-57 and NPF-5 Docket Nos. 50-348 and 50-364 License Nos. NPF-2 and NPF-8 CONTACT: Necota Staples, RII/DRP 404-997-4644
ML20154K724 OFFICE RII:DRP NAME N. Staples DATE 6/2/2020