MONTHYEARNL-14-1250, Proposed Inservice Inspection Alternative HNP-ISI-ALT-HDPE-01, Version 2.02014-09-19019 September 2014 Proposed Inservice Inspection Alternative HNP-ISI-ALT-HDPE-01, Version 2.0 Project stage: Request NL-14-1821, Proposed Inservice Inspection Alternative HNP-ISI-ALT-HDPE-01, Version 2.0 - Supplemental Information2014-11-13013 November 2014 Proposed Inservice Inspection Alternative HNP-ISI-ALT-HDPE-01, Version 2.0 - Supplemental Information Project stage: Request NL-14-1876, Proposed Lnservice Inspection Alternative HNP-ISI-ALT-HDPE-01, Version 2.0, Conceptual Design Information Package2014-11-24024 November 2014 Proposed Lnservice Inspection Alternative HNP-ISI-ALT-HDPE-01, Version 2.0, Conceptual Design Information Package Project stage: Request ML15005A2702015-01-13013 January 2015 Request for Additional Information Project stage: RAI ML15035A6802015-02-0505 February 2015 Request for Additional Information Project stage: RAI NL-15-0331, Response to Request for Additional Information from Mechanical and Civil Branch Regarding High Density Polyethylene (Hdpe) Piping Replacement2015-02-19019 February 2015 Response to Request for Additional Information from Mechanical and Civil Branch Regarding High Density Polyethylene (Hdpe) Piping Replacement Project stage: Response to RAI ML15191A4872015-07-13013 July 2015 Unit 2: Plant Service Water Piping Replacement Using High Density Polyethylene (Hdpe) Piping Nrc/Snc Meeting July 13, 2015 Project stage: Meeting ML15195A4812015-08-31031 August 2015 July 13, 2015, Summary of Meeting with SNC on High Density Polyethylene Piping for HNP-2 Project stage: Meeting 2015-01-13
[Table View] |
Similar Documents at Hatch |
---|
Category:Meeting Briefing Package/Handouts
MONTHYEARML24313A1052024-11-13013 November 2024 November 13, 2024, Hatch Pre-Submittal Public Meeting Slides (Southern Co.) ML24317A0292024-11-13013 November 2024 November 13, 2024 Hatch Pre-Submittal Public Meeting Slides (NRC Staff Presentation) ML24295A1842024-10-16016 October 2024 SNC Slides - Hatch Public Pre-Submittal Meeting on Oct 30, 2024 - Change EDG SRs 3.8.1.2 & 3.8.1.5 Load Bands ML24278A0012024-09-19019 September 2024 SLR Environmental Pre-Application Meeting - Southern Nuclear Corporation Presentation Slides ML24263A0822024-09-19019 September 2024 SLR Pre-Application Meeting - NRC Presentation Slides ML24123A0502024-05-0202 May 2024 2023 Annual Assessment Public Meeting Summary Meeting Number 20240479 ML23361A1092024-01-0808 January 2024 SNC Slides for Public Meeting on 1-8-24 to Discuss Hatch LAR - Revise TS Table 1.1-1 (Modes) to Relax Required No. of Fully Tensioned RPV Head Closure Studs ML23361A0812024-01-0808 January 2024 SNC Slides - Pre-Submittal Public Meeting on January 8, 2024 Related to Fleet QATR ML23079A2362023-03-20020 March 2023 Annual Assessment Meeting Presentation Slides ML22209A1872022-07-28028 July 2022 Pre-Submittal Meeting on August 1, 2022 Re Plant Hatch LAR: Relaxation of Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs (EPID L-2022-LRM-0052) (Slides) ML22167A1402022-06-22022 June 2022 Pre-Submittal Public Meeting Slides for Rewrite TS-3.7.2 License Amendment ML22080A0192022-03-18018 March 2022 Annual Assessment Meeting Presentation ML21225A0312021-08-31031 August 2021 Pre-Submittal Meeting - Request to Eliminate the Requirement for Automatic Main Steam Isolation on High Turbine Building Area Temperature ML21222A0342021-08-16016 August 2021 SNC Slides - Hatch TSTF-505 LAR - Pre-Submittal Meeting - 08-16-2021 ML20318A1032020-11-12012 November 2020 SNC ERO Staffing LAR RAI Responses ML20217L4312020-08-13013 August 2020 Edwin I Hatch, Units 1 and 2; and Vogtle Electric Plant, Units 1, 2, 3, and 4 - Meeting Slides a License Amendment Request for the Emergency Plan (EPID Nos L-2020-LLA-0150 and L-2020-LLA-051 ML20156A0012020-06-0404 June 2020 Slides - SNC Slides - Pre-Submittal Meeting on June 10, 2020 - Hatch EDG AOT Extension ML20101K6582020-04-10010 April 2020 Annual Assessment ML19025A0242019-01-25025 January 2019 SNC License Amendment Request for Proposed Changes to Emergency Response Organization Staffing and Augmentation ML18234A4712018-08-23023 August 2018 NRC-Pre Submittal Meeting TSTF-51 for Hatch and TSTF-51 and -471 for Farley - August 23, 2018 ML18136A8902018-05-16016 May 2018 May 21, 2018 Slides for Public Teleconference Regarding Changes to Hatch, Farley, and Vogtle TS 5.2.2.g ML18124A0052018-05-0404 May 2018 Summary of Public Meeting - Hatch Nuclear Plant Docket Nos. 50-321, 50-366 ML18066A0302018-03-0101 March 2018 Slides for March 1, 2018 Public Meeting ML17009A3832017-01-0909 January 2017 Degraded Voltage Pre-Submittal Public Meeting Slides ML16174A0272016-06-21021 June 2016 Revised NRC-SNC Hatch NFPA 805 Extension 06212016 ML16169A0612016-06-20020 June 2016 SNC Slides for 6-21-16 Public Meeting on Hatch NFPA 805 Extension ML15191A4872015-07-13013 July 2015 Unit 2: Plant Service Water Piping Replacement Using High Density Polyethylene (Hdpe) Piping Nrc/Snc Meeting July 13, 2015 ML15106A2042015-04-22022 April 2015 April 22, 2015, Meeting with Southern Nuclear Company, Slide Presentation ML14177A0862014-06-26026 June 2014 NRC Presentation Slides for Public Meeting with Southern on Seismic Reevaluation (GMRS) ML14176B2392014-06-26026 June 2014 Southern Nuclear Operating Company Seismic Reevaluation - GMRS NTTF 2.1 Presentation Slides ML14115A4102014-04-25025 April 2014 Summary of Public Meeting to Discuss Annual Assessment of Edwin I. Hatch Nuclear Plant, Units 1 and 2, in Vidalia, Georgia ML13112A2552013-04-22022 April 2013 Summary of Public Meeting to Discuss the Annual Assessment of Edwin I. Hatch Nuclear Plant with the Public for the Period of January 1, 2012, - December 31, 2012 ML13025A3012013-01-29029 January 2013 NRC Comments on Draft Integrated Plans, Hatch ML13015A2682012-12-17017 December 2012 Draft Submittal Order EA-12-049 - February 2013 FLEX Integrated Plan- Hatch ML12115A2572012-04-24024 April 2012 Summary of with Southern Nuclear Operating Co., Inc., to Discuss the Annual Assessment of Edwin I. Hatch for 2011 ML1111900612011-04-28028 April 2011 Summary of Public Meeting with Southern Nuclear Operating Company, Inc., to Discuss the Nrc'S Reactor Oversight Process and the Nrc'S Annual Assessment of Plant Safety Performance at Hatch for the Period of 01/01/210 - 12/31/2010 ML11090A0912011-04-0505 April 2011 Plant Hatch Fire Risk Monitoring ML1028105222010-10-0808 October 2010 September 29, 2010 Summary O Public Meeting with Farley to Discuss Corrective Actions Associated with Two White Regulatory Performance Public Meeting Summary ML1011304442010-04-23023 April 2010 Summary of Public Meeting to Discuss the Annual Assessment of Edwin I. Hatch for the Period of January 1, 2009 Through December 31, 2009 ML0910607322009-04-16016 April 2009 Summary of Meeting with Southern Nuclear Operating Co, Inc., to Provide Opportunities to Discuss Annual Assessment of Edwin I. Hatch for the Period of 01/01/2008 - 12/31/08 ML1019404512008-08-20020 August 2008 RA Drop-In Briefing Sheet - Hatch, Dated August 20, 2008 ML0810704462008-04-0909 April 2008 Annual Assessment Public Meeting, Slides ML0810704522008-04-0909 April 2008 Annual Assessment Public Meeting of Attendee List ML0723505462007-08-23023 August 2007 08/15/2007 Public Meeting Summary - Enclosure 2 ML0715902092007-05-31031 May 2007 Enclosure 7 - Definitions: SSE (Safe Shutdown Earthquake) & OBE (Operating Basis Earthquake) ML0717004662007-05-31031 May 2007 05/2007 Generation Planning Overview. ML0632800652006-11-14014 November 2006 Meeting Summary Handouts, Enclosure 2 (Tac Nos. MD2934 and MD2935) ML0611505512006-04-12012 April 2006 Slides for Annual Assessment Meeting Cy 2005 ML0536202702005-12-12012 December 2005 Enclosure 4 to Summary of Public Meeting with the Boiling Water Reactor Owner'S Group to Discuss 10 CFR Part 21 Report on Safety Limit 2.1.1.1 of NUREG 1433/34 ML0534700922005-11-29029 November 2005 Hatch, Units 1 & 2, Enclosure, Meeting Summary, Generic Letter 2003-01 2024-09-19
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24317A0292024-11-13013 November 2024 November 13, 2024 Hatch Pre-Submittal Public Meeting Slides (NRC Staff Presentation) ML24313A1052024-11-13013 November 2024 November 13, 2024, Hatch Pre-Submittal Public Meeting Slides (Southern Co.) ML24295A1842024-10-16016 October 2024 SNC Slides - Hatch Public Pre-Submittal Meeting on Oct 30, 2024 - Change EDG SRs 3.8.1.2 & 3.8.1.5 Load Bands ML24278A0012024-09-19019 September 2024 SLR Environmental Pre-Application Meeting - Southern Nuclear Corporation Presentation Slides ML24263A0822024-09-19019 September 2024 SLR Pre-Application Meeting - NRC Presentation Slides ML24123A0502024-05-0202 May 2024 2023 Annual Assessment Public Meeting Summary Meeting Number 20240479 ML23361A0812024-01-0808 January 2024 SNC Slides - Pre-Submittal Public Meeting on January 8, 2024 Related to Fleet QATR ML23361A1092024-01-0808 January 2024 SNC Slides for Public Meeting on 1-8-24 to Discuss Hatch LAR - Revise TS Table 1.1-1 (Modes) to Relax Required No. of Fully Tensioned RPV Head Closure Studs ML23206A0412023-08-0202 August 2023 SNC Slides - Public Pre-Submittal Meeting on Aug 02, 2023 - Request for 45-Day Limited Extension of Risk Informed Completion Time (RICT) Program Backstop for TS 3.7.1 & 3.7.2 ML23088A2362023-03-28028 March 2023 SNC Presentation - Public Meeting - 03-28-2023 - Page from ML22231B055 ML23079A2362023-03-20020 March 2023 Annual Assessment Meeting Presentation Slides ML22209A1872022-07-28028 July 2022 Pre-Submittal Meeting on August 1, 2022 Re Plant Hatch LAR: Relaxation of Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs (EPID L-2022-LRM-0052) (Slides) ML22167A1402022-06-22022 June 2022 Pre-Submittal Public Meeting Slides for Rewrite TS-3.7.2 License Amendment ML22080A0192022-03-18018 March 2022 Annual Assessment Meeting Presentation ML21271A2022021-10-0505 October 2021 Pre-Submittal Meeting on October 5, 2021 - Hatch NFPA 805 Supplement LAR (SNC Slides) ML21225A0312021-08-31031 August 2021 Pre-Submittal Meeting - Request to Eliminate the Requirement for Automatic Main Steam Isolation on High Turbine Building Area Temperature ML21222A0342021-08-16016 August 2021 SNC Slides - Hatch TSTF-505 LAR - Pre-Submittal Meeting - 08-16-2021 ML21083A2872021-03-24024 March 2021 Pre-Submittal Meeting - Quality Assurance Topical Report Revision to Allow Application of Remote Assessment Techniques During Exigent Conditions ML21021A2462021-01-21021 January 2021 Slides - SNC Slides - Pre-Submittal Meeting on January 26, 2021 - Hatch NFPA-805 LAR ML20318A1032020-11-12012 November 2020 SNC ERO Staffing LAR RAI Responses ML20156A0012020-06-0404 June 2020 Slides - SNC Slides - Pre-Submittal Meeting on June 10, 2020 - Hatch EDG AOT Extension ML20101K6582020-04-10010 April 2020 Annual Assessment ML19123A3542019-05-0202 May 2019 Public Meeting Summary - Hatch Nuclear Plant, Docket Nos. 50-321 and 50-366 ML19025A0242019-01-25025 January 2019 SNC License Amendment Request for Proposed Changes to Emergency Response Organization Staffing and Augmentation ML18124A0052018-05-0404 May 2018 Summary of Public Meeting - Hatch Nuclear Plant Docket Nos. 50-321, 50-366 ML18066A0302018-03-0101 March 2018 Slides for March 1, 2018 Public Meeting ML17324A3462017-11-15015 November 2017 Meeting Slides for 11/15/2017, Public Meeting Between NRC and SNC Regarding Hatch License Amendment Request - Application of TSTF-423 to Drywell Spray Function Technical Specification End State ML16174A0272016-06-21021 June 2016 Revised NRC-SNC Hatch NFPA 805 Extension 06212016 ML16169A0612016-06-20020 June 2016 SNC Slides for 6-21-16 Public Meeting on Hatch NFPA 805 Extension ML16169A0602016-06-17017 June 2016 SNC Draft Letter to NRC Regarding Hatch NFPA 805 Extension ML15191A4872015-07-13013 July 2015 Unit 2: Plant Service Water Piping Replacement Using High Density Polyethylene (Hdpe) Piping Nrc/Snc Meeting July 13, 2015 ML15106A2042015-04-22022 April 2015 April 22, 2015, Meeting with Southern Nuclear Company, Slide Presentation ML14177A0862014-06-26026 June 2014 NRC Presentation Slides for Public Meeting with Southern on Seismic Reevaluation (GMRS) ML14176B2392014-06-26026 June 2014 Southern Nuclear Operating Company Seismic Reevaluation - GMRS NTTF 2.1 Presentation Slides ML13112A2552013-04-22022 April 2013 Summary of Public Meeting to Discuss the Annual Assessment of Edwin I. Hatch Nuclear Plant with the Public for the Period of January 1, 2012, - December 31, 2012 ML12115A2572012-04-24024 April 2012 Summary of with Southern Nuclear Operating Co., Inc., to Discuss the Annual Assessment of Edwin I. Hatch for 2011 ML1111900612011-04-28028 April 2011 Summary of Public Meeting with Southern Nuclear Operating Company, Inc., to Discuss the Nrc'S Reactor Oversight Process and the Nrc'S Annual Assessment of Plant Safety Performance at Hatch for the Period of 01/01/210 - 12/31/2010 ML1011304442010-04-23023 April 2010 Summary of Public Meeting to Discuss the Annual Assessment of Edwin I. Hatch for the Period of January 1, 2009 Through December 31, 2009 ML1020105352009-10-29029 October 2009 Tritium Meeting, Southern Nuclear, Hatch ML0910607322009-04-16016 April 2009 Summary of Meeting with Southern Nuclear Operating Co, Inc., to Provide Opportunities to Discuss Annual Assessment of Edwin I. Hatch for the Period of 01/01/2008 - 12/31/08 ML0810704462008-04-0909 April 2008 Annual Assessment Public Meeting, Slides ML0723505462007-08-23023 August 2007 08/15/2007 Public Meeting Summary - Enclosure 2 ML0717004662007-05-31031 May 2007 05/2007 Generation Planning Overview. ML0632800652006-11-14014 November 2006 Meeting Summary Handouts, Enclosure 2 (Tac Nos. MD2934 and MD2935) ML0622804942006-08-0909 August 2006 Hatch Tritium Public Meeting Power Point Slide Attachment ML0611505512006-04-12012 April 2006 Slides for Annual Assessment Meeting Cy 2005 ML0610704022006-04-12012 April 2006 Edwin I. Hatch Annual Assessment Meeting Cy 2005- Slides ML0535403442005-12-12012 December 2005 Submittal of Power Point Presentation Proposed Solutions to Part 21 on Safety Limit 2.1.1.1, NUREG-1433/34 ML0511501332005-04-13013 April 2005 Annual Assessment Meeting Cy 2004, Edwin I. Hatch Nuclear Plant - NRC Region II, Vidalia, Ga, April 13, 2005 ML0410406802004-04-0606 April 2004 Meeting Presentation for Edwin I. Hatch Annual Assessment Meeting, Reactor Oversight Program - Cy 2003 2024-09-19
[Table view] |
Text
HATCH NUCLEAR PLANT - UNIT 2 PLANT SERVICE WATER PIPING REPLACEMENT USING HIGH DENSITY POLYETHYLENE (HDPE) PIPING NRC/SNC MEETING JULY 13, 2015 1
MEETING OBJECTIVES
- Discuss updates from conceptual design review
- Discuss Mechanical and Civil Branch RAI Responses
- Discuss content of updated HDPE stress analysis to be submitted in August 2015.
- Discuss schedule for SNC submittals and for NRC approval 2
OVERVIEW OF HDPE PIPE ROUTING 3
UPDATED SUB-GRADE VAULT CONFIGURATION 4
UPDATED NEW SUB-GRADE VAULT CONFIGURATION 5
CONNECTIONS WITHIN THE REACTOR BUILDING 6
MECHANICAL AND CIVIL BRANCH RAI RESPONSES
- RAI-1: addresses minimum required wall thickness for fitting and components.
- RAI-2: addresses normal and maximum operating pressures and temperatures for Plant Service Water supply and return piping.
- RAI-3(a): addresses the HDPE stresses with respect to the hydrostatic pressure test
- RAI-3(b): addresses the periodic pressure test maximum operating pressure 7
MECHANICAL AND CIVIL BRANCH RAI RESPONSES (CONTINUED)
- RAI-4(a): addresses excerpts from the stress analysis computer program (i) input, and (ii) output corresponding to the maximum reported stress locations.
The updated HPDE stress analysis summary will include this information
- RAI-4(b): addresses the model termination boundary of the stress analysis. The updated HPDE stress analysis will be extended to the transition flange and the above ground piping model will include a portion of the buried piping to provide overlapping analysis. The piping will then be evaluated using bounding loads from the overlapping models.
8
MECHANICAL AND CIVIL BRANCH RAI RESPONSES (CONTINUED)
- RAI-4(c): addresses forces and moments at the transition flange from the stress analysis. The stresses and loadings at the transition flange will be in the detailed design. A summary of the flanged joint bolt torque calculation that determines the acceptability of the joint to maintain a leak tight joint will be submitted.
9
MECHANICAL AND CIVIL BRANCH RAI RESPONSES (CONTINUED)
- RAI-5(a): addresses loads on the metallic piping supports included in the buried HDPE piping subsystem. Updated loads on the supports of the metallic piping in the vicinity of the HDPE piping will be included in the above ground stress analysis.
- RAI-5(b): addresses acceptance limits for valve accelerations. The acceptability of valve acceleration changes due to this change will be included in the above ground stress analysis.
10
MECHANICAL AND CIVIL BRANCH RAI RESPONSES (CONTINUED)
- RAI-5(c): addresses the impact of this change to the above ground piping stress analysis including the qualification of valves and pipe supports in the vicinity of the transition flange. Justification of the changes to the valves and piping supports in the vicinity of the transition flange will be included in the above ground stress analysis.
11
MECHANICAL AND CIVIL BRANCH RAI RESPONSES (CONTINUED)
- RAI-6(a): addresses anchor movement based on 1/4 assumed building settlement. The updated HDPE stress analysis will include the technical justification for the building settlement.
- RAI-6(b): addresses allowable stress limits for non-repeated anchor motions. This was an inadvertent entry.
This has been corrected in the revised summary report.
- RAI-7: addresses load cases and load combinations for service levels A, B, and D. The updated load cases and load combinations for these service levels will be included in the updated HDPE stress analysis.
12
MECHANICAL AND CIVIL BRANCH RAI RESPONSES (CONTINUED)
- RAI-8: addresses seismic input values used for seismically induced stresses such as soil strains caused by seismic wave passage, seismic soil movement, and seismic anchor motion. These values will be included in the updated HDPE stress analysis.
- RAI-9: addresses stresses from thermal expansion, thermal contraction and combined stress. These values will be included in the updated HDPE stress analysis.
13
MECHANICAL AND CIVIL BRANCH RAI RESPONSES (CONTINUED)
- RAI-10: addresses stresses and methodology from alternative thermal expansion and contraction.
These values and a description of methodology will be included in the updated HDPE stress analysis.
- RAI-11: addresses the use of gaskets and achieving a leak tight joint. The updated gasket details as well as the ability to achieve a leak tight joint will be addressed by a transition flange bolt torque calculation summary that will be submitted with the updated HDPE stress analysis.
14
MECHANICAL AND CIVIL BRANCH RAI RESPONSES (CONTINUED)
- RAI-12: addresses moderate energy crack postulation.
- RAI-13: addresses fire hazards of the non-buried sections of the HDPE piping.
15
UPDATED ROUTING DESIGN CHANGE PACKAGE ITEMS TO BE SUBMITTED
- Updated Description of Scope
- Updated P&ID, Isometric and Select Piping Drawings to Support the Updated HDPE Stress Analysis
- Updated HDPE Minimum Wall Calculation
- Updated HDPE Hydraulic Performance Calculation Summary
- Updated Transition Flange Bolt Torque Calculation Summary (RAI-4(c), (RAI-4(a), RAI-11)
- Updated HDPE Stress Analysis Summary 16
UPDATED HDPE STRESS ANALYSIS
SUMMARY
- Purpose of Summary Report
- Results and Conclusions o Allowable Service Level Spikes due to Transient Pressures o Pressure Design of Joints and Fittings o Pressure Design of Miter Elbows o Ring Deflection due to Soil and Surcharge Loads o Compression of Sidewalls due to Soil and Surcharge Loads o Buckling Due to External Pressure o Effects of Negative Internal pressure o Flotation o Longitudinal Stresses (RAI-4(a), RAI-7, RAI-8) 17
UPDATED HDPE STRESS ANALYSIS
SUMMARY
(CONTINUED) o Seismic-Induced Stresses (RAI-4(a) , RAI-8) o Short Duration Longitudinal Applied Mechanical Loads o Design for Combined Thermal Expansion and Contraction (RAI-9) o Alternative Thermal Expansion and Contraction Evaluation (RAI-4(a), RAI-10) o Non-Repeating Anchor Movements (RAI-4(a), RAI-6(b))
o Forces and Moments at Transition Flanges (RAI-4(b), RAI-4(c))
UPDATED HDPE STRESS ANALYSIS
SUMMARY
(CONTINUED)
- Assumptions (with associated justifications)
- Attachment- Development of Spring and Breakaway Forces
- Attachment- Summary of Above Ground Stainless Steel Piping Analysis Impacting HDPE Piping (RAI-4(b), RAI-5(a) , RAI-5(b) , RAI-5(c))
19
SNC HDPE SCHEDULE 20
CURRENT HDPE PROPOSED SCHEDULE Milestone Date SNC Submittal of Version 2 09/19/2014(Actual)
SNC Submitted Summary of Conceptual Design 11/26/2014 (Actual)
NRC Submits Initial Round of RAIs to the Alternative 02/05/2015(Actual)
SNC Executive Management Go/No-Go Decision 03/31/2015 (Actual)
Regarding Using HDPE Versus Stainless Steel SNC Begin Internal Procurement Process for HDPE Piping 06/01/2015 (Ongoing)
Material SNC Submits Summary of Updated Stress Analysis & 08/31/2015 Supporting Items Expected NRC Approval 11/16/2015 Begin Fabrication of HDPE Piping Fittings (elbow & flange 12/01/2015 adaptors)
Begin to Install Piping 04/01/2016 21