ML062280494

From kanterella
Jump to navigation Jump to search
Tritium Public Meeting Power Point Slide Attachment
ML062280494
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 08/09/2006
From:
NRC/RGN-II
To:
Shared Package
ML062280483 List:
References
FOIA/PA-2010-0209
Download: ML062280494 (11)


Text

NRC Public Meeting Southern Nuclear Operating Company Plant Hatch Tritium Update August 9, 2006

Objectives

  • Ensure NRC has full understanding of tritium issue at SNC Plants

- no threat to public health and safety

- all releases are below regulatory limits

  • Provide overview of tritium at Plant Hatch
  • Review all actions undertaken by SNC

Overview at Plant Hatch

  • Historical Reporting and Monitoring

- Regulatory event reporting since 1978

- Public awareness and NRC interactions

  • Recent Events

- Identification of new release points

  • Corrective Actions

- Stopped known on-site releases to groundwater

- Permitted most recently identified release points

- Established ongoing and enhanced monitoring

Environmental Program Overview

  • Historical monitoring
  • Discovery of un-permitted releases
  • Communications
  • Southern Nuclears corrective actions
  • Monitoring program going forward

Historical Monitoring

  • Onsite

- Drinking water wells

- Groundwater monitoring wells

  • Offsite

- Monitoring water samples from Altamaha River

- Georgia EPD offsite testing

  • Site Hydrology

Recent Events

  • On-site

- Historical releases & sources

- No known current sources

  • Off-site

- Reclassification of release points

Communications

  • Nuclear Regulatory Commission
  • Georgia Environmental Protection Division
  • Local officials
  • Nuclear Energy Institute

Corrective Actions

  • Stopped known on-site releases to groundwater
  • Permitted most recently identified release points
  • Enlisted a consultant to perform a hydrology study
  • Enlisted an engineering firm to study underground piping
  • Increased and enhanced sampling and inspection program at plant
  • Other measures

Action Steps Going Forward

  • Implementation of industry groundwater protection plan
  • Continue to examine site hydrology
  • Evaluate locations for additional monitoring wells
  • Refine groundwater monitoring protocols
  • Expansion of preventative maintenance programs

Summary

  • All known releases are permitted and monitored
  • All releases below regulatory limits
  • No offsite groundwater migration of tritium
  • No threat to public health & safety