ML102010535
| ML102010535 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 10/29/2009 |
| From: | Office of Nuclear Reactor Regulation |
| To: | Office of Information Services |
| References | |
| FOIA/PA-2010-0209 | |
| Download: ML102010535 (15) | |
Text
Energy to Serve Thmr W-Zrld"-
Lau, -t, Every day, every job, safely.
Southern Nuclear
Tritium Meeting 10/29/09 AGENDA
" Update on tritium graphs (T12, NW10, N008A)
Monitoring status Current Issues
° MILitem #29 I
0,
MONITORING STATUS NEW WELLS SCS samples include the additional wells installed in 2008. See their location and recent tritium results (August 2009) listed below:
R1 -70' West of the Maintenance bldg, (243 pCi/L)
R2 -10' North of the EDG bldg, (356 pCi/L)
R3 -30' South of the U 1 CST Enclosure, (1720 pCi/L)
R4 -Outside the Protected Area near the Discharge Structure, (191 pCiIL)
R5 -75' West of the Laundry Storage bldg, (1823 pCi/L)
R6 -30' Southeast of the Laundry Storage bldg., (243 pCi/L)
Sampling results indicate containment of plume inside subsurface drain.
MONITORING STATUS (CONT.)
Southern Company Services Groundwater program:
0 SCS monitors 26 wells on a quarterly basis, including deep wells 2 and 3:
- Deep well results < MDA fro 2008 (both wells were around 250 pCi/L)
- Current site program to be evaluated for reduction of sampling based on SCS sampling (frequencies/sample points).
- Site to continue monthly monitoring of NW10, T12.
- SCS to alert site concerning spikes in tritium activity?
CURRENT ISSUES
- N008A indicates a flat trend for the last 6 months.
° NW1 0 maintains the same concentrations for the last 8 months (no increases).
- T12 was at an all time low activity in June of 2009.
° Gscan activities performed in 2008 and no degradation was found for Unit 2 that was greater than the action level set by the Corporate Stress Group.
- Drain line repair work completed around U2 CST moat on 10/22/09.
MIL ITEM #29
- Investigate source of in leakage to pull box adjacent to U2 CST (CR 2008103772). Activity continues to decrease (highest pullbox - AQ = 3890 pCi on 10/15/09.
Chemistry will continue to obtain samples from pullboxes and water will be disposed of in decon sink until activity is <MDA.
" Hydrologist report with data taken through October 08.
" Take off MIL list? Where do we go from here?
" New items........
T12 (Well outside U1 CST)
NW1O (OUTSIDE U2 CST)
NOO8A (FRENCH DRAIN EAST OF PROTECTED AREA)
,IN)
-W-NOOSA (SUBSURFACE DRAIN)
Uj j ~6~o1D
~sA
\\J 1~d+
r 9jv\\&tI\\
N012B DELETED
.EFROMMflDCM A
A A
A A
A
'A "A DRAIN) ---
NOO8A (SUBSURFACE DRAIN)
_7 s-N(022ýA (OUTFALL1 R/H C-Ti -u-N(024A(OUiTPAi J R,/H (lTý
ýn?,2.A(OL1TFALL I /H C-T'ý
-I aWf~L~
NýJ - ZOO-7
SNC PLANT E. 1. HATCH7 IPg 11 of 15 DOCUMENT TITLE:
DOCUMENT NUMBER:
Version No:
INGROUND PULLBOX AND CABLE DUCT DI-OPS-75-0404 3.0 INSPEC-TION FOR WATER ATTACHMENT 3 Att. Pg.
TITLE: GENERAL LOCATION OF PULLBOXES IN AREA 3 lof 1 NA
,PB2AU RETROFIT BLDG PB2-DD m
V fio)025 ELECT.
SHOP
,02*
PT-Al r
TRAILERI PB-J PB2-DC-U PB2-CA--E P8-Aa %I)DOD fba-AT WICO(O f bgAQ 1361100 P.E.S.B.
a -oil g-[q 93J.2o/og MGR-0009 Ver. 4
SNC PLANT E. I. HATCH Pg 31 of 33 DOCUMENT TITLE:
DOCUMENT NUMBER:
RevNer No:
RELEASES VIA PLANNED AND UNPLANNED 64CH-SAM-028-0
4.4 ROUTES
SAMPLING AND ANALYSIS ATTACHMENT 6 Att. Pg.
ALL GROUNDWATER SAMPLE POINTS 1 of 1 mi\\w?-~
uJlI
~JI1F~i[Th NW2Af~<
NW38 NW2B Y22-N022A - SS2 in. LINE 024A - Y02 in. LINE Y22-N025A - BASIN TOWER OVERFLOW (02B) in. LINE MGR-0009 Rev 4
'4 SNC PLANT E. 1. HATCH I Pg 31 of 33 DOCUMENT TITLE:
DOCUMENT NUMBER:
RevNer No:
RELEASES VIA PLANNED AND UNPLANNED 64CH-SAM-028-0
4.4 ROUTES
SAMPLING AND ANALYSIS ATTACHMENT 6 An. Pg.
ALL GROUNDWATER SAMPLE POINTS 1 of 1 NNW7A' Y22-NO12B i
/,NW5A dDiesel Gen. BW6g BgY03 in.
NT I
~TURBINE BUIL.DING 0
Y22-N08A UN 2
N SS 2I.
LLN A"/
-Y22-NO24A
- "w'=-
$0-in. LINE R22-N025A - BASIN TOWER OVERFLOW (02B) in. LINE MGR-0009 Rev 4