MONTHYEARML16169A0602016-06-17017 June 2016 SNC Draft Letter to NRC Regarding Hatch NFPA 805 Extension Project stage: Draft Other ML16169A0612016-06-20020 June 2016 SNC Slides for 6-21-16 Public Meeting on Hatch NFPA 805 Extension Project stage: Meeting ML16174A0272016-06-21021 June 2016 Revised NRC-SNC Hatch NFPA 805 Extension 06212016 Project stage: Other ML16179A1862016-06-30030 June 2016 Summary of Public Meeting with Southern Nuclear Operating Company to Discuss Delay of Application Date for NFPA 805 License Amendment Request for Edwin I. Hatch Nuclear Plant, Units Nos. 1 and 2 Project stage: Meeting 2016-06-20
[Table View] |
Similar Documents at Hatch |
---|
Category:Meeting Summary
MONTHYEARML24012A1592024-01-30030 January 2024 Summary of January 8, 2024, Meeting Held with Southern Nuclear Operating Company, Inc., to Discuss a RAI License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Head Bolts ML24019A1932024-01-30030 January 2024 Summary of January 8, 2024, Observation Pre-Submittal Meeting Held with Southern Nuclear Operating Company Regarding a Proposed LAR for Vogtle Electric Generating Plant, Units 1, 2, 3, & 4; Hatch, Units 1 & 2; Farley, Units 1 & 2 ML23356A0282023-12-27027 December 2023 December 11, 2023, Pre-Application Meeting with SNC Regarding a Proposed Fleet LAR to Revise TS 5.3.1 to Relocate Training Qualification Requirements from TS to Their Qatr/Ndqam ML23338A2592023-12-0808 December 2023 Summary of Observation Public Meeting Held with Southern Nuclear Operating Company, Inc., Regarding a License Amendment Request for the Reactor Pressure Vessel Head Closure Bolts for Hatch, Units 1 & 2 (EPID No. L-2022-LLA- 0120) ML23311A1302023-11-17017 November 2023 Summary of Nov. 6, 2023, - Closed Meeting Held with Southern Nuclear Operating Company, Inc., Regarding Physical Barriers Exemptions for Hatch Units 1 & 2, Farley Units 1 & 2 and Vogtle Units 1, 2, 3 & 4 (EPID L-2023-LLE-0018 & L-2023-LLE-0 ML23244A0312023-09-18018 September 2023 MTS - Meeting Summary - Pre-Submittal Meeting on August 02, 2023 - RICT 45-day Extension for TS 3.7.1 & 3.7.2 ML23136B2942023-05-19019 May 2023 Summary of May 02, 2023, Observation Public Meeting Held with Southern Nuclear Operating Company, Inc., Regarding a LAR for the Reactor Pressure Vessel Head Closure Bolts for Edwin I. Hatch Nuclear Plant, Units 1 and 2 ML23088A3882023-04-0303 April 2023 Summary of March 28, 2023, Observation Public Meeting Held with SNC, Regarding a License Amendment Request Regarding the Reactor Pressure Vessel Head Closure Bolts for Edwin I. Hatch Nuclear Plan, Units 1 and 2 ML23088A2362023-03-28028 March 2023 SNC Presentation - Public Meeting - 03-28-2023 - Page from ML22231B055 ML22243A1912022-09-0707 September 2022 Public Pre-Submittal Meeting on August 1, 2022 - Revise TS Table 1.1-1 Modes to Relax RPV Head Closure Studs ML22200A0432022-07-22022 July 2022 Summary of June 22, 2022, Pre-Submittal Meeting W/Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Request to Re-Write TS 3.7.2, Plant Service Water and Ultimate Heat Sink for Edwin I. Hatch Nuclear ML22108A1382022-04-18018 April 2022 Annual Assessment Public Meeting Summary ML21278A5572021-10-25025 October 2021 Meeting Summary - Pre-Submittal Meeting on October 5, 2021 - Hatch NFPA 805 License Amendment Request ML21251A5372021-09-20020 September 2021 September 7, 2021, Summary of Follow-Up, Public, Pre-Licensing Meeting with Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Request to Adopt TSTF-505 for Edwin I. Hatch Nuclear Plant, Units 1 and 2 ML21229A0072021-09-10010 September 2021 Summary of Public Meeting with Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Request to Adopt TSTF-505 ML21232A2622021-09-0101 September 2021 Summary of Public Meeting with Southern Nuclear Operating Company Regarding Proposed LAR to Remove Function 1.f (Main Steam Line Isolation-Turbine Building Area Temperature-High) from TS Table 3.3.6.1A-7 for Hatch Units 1&2 (L-2021-LRM-0081 ML21124A1232021-05-0404 May 2021 April 27, 2021, Public Meeting Summary Joseph M. Farley Nuclear Plant Units 1 and 2, Edwin I. Hatch Nuclear Plant Units 1 and 2, Docket No. 50-348, 50-364, 50-321, 50-366, Meeting Number ML21117A030 ML21102A3112021-04-19019 April 2021 Corrected - 03/31/2021 Summary of Public Meeting with Southern Nuclear Operating Company, Inc., Regarding a Proposed Licensing Action Request to Change the Quality Assurance Topical Report ML21092A0082021-04-0808 April 2021 Summary of March 31, 2021, Public Meeting with Southern Nuclear Operating Company, Inc., Regarding a Proposed Licensing Action Request to Change the Technical Specification Related to Heat Flux Hot Channel Factor ML21028A0532021-02-0303 February 2021 Summary of Public Meeting with Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Request to Supplement National Fire Protection Association (NFPA)-805, Performance-Based Standard for Fire Protection for ML20318A0752020-11-16016 November 2020 Summary of November 12, 2020, Public Meeting with Southern Nuclear Operating Company, Inc., Regarding a License Amendment Request for the Emergency Plan ML20289A4242020-11-0404 November 2020 Summary of Public Meeting with Southern Nuclear Operating Company, Inc. Regarding Proposed License Amendment Request to Remove Function 1.f from Technical Specification Table 3.3.6.1A-7 for Hatch, Units 1 and 2 ML20217L3692020-08-13013 August 2020 Summary of Meeting Joseph M. Farley Nuclear Plant, Units 1 and 2; Edwin I. Hatch, Units 1 and 2; and Vogtle Electric Generating Plant, Units 1, 2, 3, and 4 a LAR for the Emergency Plan (EPID Nos. L-2020-LLA0150 and L-2020-LLA-015 ML20162A1622020-06-16016 June 2020 June 10, 2020, Summary of Public Mtg with Southern Nuclear Operating Company, Inc., a Proposed License Amendment Request for a One-Time Completion Time for the Emergency Diesel Generator Using a Risk-Informed Approach ML20154K7242020-06-0202 June 2020 EOC Meeting Summary ML19123A3542019-05-0202 May 2019 Public Meeting Summary - Hatch Nuclear Plant, Docket Nos. 50-321 and 50-366 ML19114A0062019-04-30030 April 2019 Summary of July 31, 2018, Pre-Application Meeting with Southern Nuclear to Discuss Proposed Changes to Secondary Containment Technical Specifications (EPID L-2018-LEM-0047 ML19038A3462019-02-15015 February 2019 Summary of Meeting with the Nuclear Regulatory Commission and Southern Nuclear Operating Company, Inc. Regarding Pre-Submittal of a License Amendment Request for Proposed Changes to Emergency Response Organization Staffing and Augmentation ML18284A0222018-10-16016 October 2018 August 23, 2018, Summary of Pre-Application Meeting with Southern Nuclear Operating Company, Inc. to Discuss TSTF-51 and TSTF-471 ML18142B0452018-05-24024 May 2018 Summary of May 21, 2018, Pre-submittal Public Teleconference with Southern Nuclear Operating Company, Inc. to Discuss the Upcoming License Amendment Request to Remove the Dedicated Shift Technical Advisor ML18124A0052018-05-0404 May 2018 Summary of Public Meeting - Hatch Nuclear Plant Docket Nos. 50-321, 50-366 ML17131A1572017-05-11011 May 2017 Summary of Public Meeting Concerning Annual Assessment of Edwin I. Hatch Nuclear Plant, Units 1 and 2 ML17093A9172017-04-21021 April 2017 Summary of 3/23/2017, Pre-Submittal Public Meeting with Southern Nuclear Operating Company, Inc. to Discuss the Proposed License Amendment Requests Regarding TSTF-542, Reactor Pressure Vessel Water Inventory Controls, and SR3.3.1.3 (CAC Nos ML17030A4372017-02-15015 February 2017 Summary of Public Meeting with Southern Nuclear Operating Company, Inc. to Discuss the Degraded Grid Voltage Proposed License Amendment Request ML16179A1862016-06-30030 June 2016 Summary of Public Meeting with Southern Nuclear Operating Company to Discuss Delay of Application Date for NFPA 805 License Amendment Request for Edwin I. Hatch Nuclear Plant, Units Nos. 1 and 2 ML16085A1762016-03-29029 March 2016 Summary of March 24, 2016, Meeting with Southern Nuclear Operating Company Regarding Planned Physical Protection Modifications ML15195A4812015-08-31031 August 2015 July 13, 2015, Summary of Meeting with SNC on High Density Polyethylene Piping for HNP-2 ML15125A0872015-05-26026 May 2015 May 12, 2015 Summary of Meeting with Southern Nuclear Operating Company to Discuss a Future Fleet Standard Emergency Plan Submittal ML15103A0602015-04-30030 April 2015 April 22, 2015, Summary of Meeting with Southern Nuclear Operating Company to Discuss a Future Fleet Standard Emergency Plan Submittal ML15121A0342015-04-30030 April 2015 Summary of Public Meeting to Discuss the 2014 Annual Performance Assessment of the Edwin I. Hatch Nuclear Plant ML14122A0372014-05-0808 May 2014 April 23, 2014 Summary of Meeting with Southern Nuclear Operating Company to Discuss Grid Design Criteria ML14115A4102014-04-25025 April 2014 Summary of Public Meeting to Discuss Annual Assessment of Edwin I. Hatch Nuclear Plant, Units 1 and 2, in Vidalia, Georgia ML13225A2932013-08-12012 August 2013 7/23-24/2013, Summary of Meeting 2013 U.S. Nuclear Regulatory Commission (NRC) Initial Exam Writers' Workshop ML13112A2552013-04-22022 April 2013 Summary of Public Meeting to Discuss the Annual Assessment of Edwin I. Hatch Nuclear Plant with the Public for the Period of January 1, 2012, - December 31, 2012 ML12115A2572012-04-24024 April 2012 Summary of with Southern Nuclear Operating Co., Inc., to Discuss the Annual Assessment of Edwin I. Hatch for 2011 ML11292A1612011-10-20020 October 2011 Summary of Meeting with Beyond Nuclear Regarding Their 10 CFR 2.206 Petition to Suspend Operating Licenses of General Electric Mark I Boiling Water Reactors ML11166A1342011-06-22022 June 2011 Meeting Summary with the Beyond Nuclear Petitioners Regarding Their 2.206 Petition to Suspend Operating Licenses (Ols) of General Electric (GE) Boiling Water Reactors (Bwrs) Mark I (Bwrs) ML1111900612011-04-28028 April 2011 Summary of Public Meeting with Southern Nuclear Operating Company, Inc., to Discuss the Nrc'S Reactor Oversight Process and the Nrc'S Annual Assessment of Plant Safety Performance at Hatch for the Period of 01/01/210 - 12/31/2010 ML1108718492011-03-28028 March 2011 Summary of Public Meeting with Southern Nuclear Operating Co. to to Discuss Fleet Improvement Initiatives for the Southern Nuclear Plants ML1028105222010-10-0808 October 2010 September 29, 2010 Summary O Public Meeting with Farley to Discuss Corrective Actions Associated with Two White Regulatory Performance Public Meeting Summary 2024-01-30
[Table view] |
Text
LICENSEE: Southern Nuclear Operating Company.
FACILITY: Edwin I. Hatch Nuclear Plant, Unit Nos. 1 and 2
SUBJECT:
SUMMARY
OF JUNE 21, 2016, PUBLIC MEETING WITH SOUTHERN NUCLEAR OPERATING COMPANY, INC. TO DISCUSS DELAY OF APPLICATION DATE FOR NFPA 805 LICENSE AMENDMENT REQUEST (CAC NOS. MF7736 AND MF7737)
On June 21, 2016, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) staff and representatives of Southern Nuclear Operating Company, Inc.
(SNC, the licensee) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss with the SNC staff its proposed delay in the application date for the license amendment request (LAR) to implement Title 10 of the Code of Federal Regulations, Section 50.48(c), "National Fire Protection Association Standard NFPA 805," "Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants," at the Edwin I. Hatch Nuclear Plant (HNP), Unit Nos. 1 and 2.
The meeting notice and agenda, dated June 3, 2016, are located at Agencywide Documents Access and Management System (ADAMS) Accession No. ML16172A039. The licensee provided two handouts for the meeting. Its presentation is available in ADAMS at Accession No. ML16174A027. The licensee also provided a draft copy of a proposed letter requesting an 18-month extension. This draft letter is available in ADAMS at Accession No. ML16169A060. A list of meeting attendees is provided in the enclosure to this meeting summary.
Meeting Summary After introductions, the licensee proceeded to the slide presentation, first providing the reasons for the schedule change. The first reason was the fire probabilistic risk assessment (FPRA) peer review that was completed in 2016. The licensee stated that it received 40 findings, 6 of which did not meet the applicable supporting requirement of the American Nuclear Society/American Society of Mechanical Engineers probabilistic risk assessment (PRA) standard and 50 to 60 suggestions. SNC is continuing to refine the FPRA model due to this review and needs additional time to resolve the facts and observations (F&O) from the peer review.
A second reason provided for the schedule change is planned plant modifications. The licensee stated that the FPRA model does not include FLEX modifications nor degraded grid voltage protection modifications. The NRC staff questioned how FLEX affects the FPRA model. SNC replied that it is currently determining how the permanent versus temporary FLEX modifications will be accounted for in the PRA. As for the degraded grid voltage protection modifications, the licensee stated that the effects on the FPRA due to the addition of a third startup transformer are still unknown, considering that the rerouting plan for that transformer's cabling is still being
developed. Additionally, the NRC staff asked about any additional future LARs that need approval before the NFPA 805 amendment can be issued, and the SNC staff stated that it does not know of any at this time.
SNC also discussed that fire protection system hydraulic calculations and engineering equivalency evaluations will need to be performed before the application date. The NRC staff questioned the licensee as to why these calculations and evaluations are being performed at this time, because they should have been completed and in effect already for years. SNC responded that the calculations and evaluations are very old and need updating to modern standards.
The licensee discussed the 18-month extension request for completing the LAR. The NRC staff stated that it would like to see a list of milestones from the present time until the submittal date added into the extension request letter, because that demonstrates continual progress of the NFPA 805 LAR towards submittal to the NRC.
The licensee next provided a status of the FPRA model. An FPRA peer review was completed in April 2016, and the licensee stated that the FPRA met requirements of Regulatory Guide 1.200, "An Approach for Determining the Technical Adequacy of Probabilistic Risk Assessment Results for Risk-Informed Activities." The NRC staff asked why the peer review was performed so late, considering the original submittal date was supposed to be October 4, 2016. The licensee stated that it had a peer review performed in 2013 and the results were not acceptable; therefore, many changes to the FPRA model are needed. The NRC staff also asked if the licensee will continue to have peer reviews of the model after NRC approval. SNC stated that it will update its FPRA model every other refueling outage as per its procedures, but no further peer reviews are planned.
The licensee discussed the additional tasks remaining. The NRC staff asked if the licensee is using any new methods for the FPRA model. The licensee responded that new heat release rates and fire frequencies are used in the revised FPRA model. Additionally, the licensee stated it will not be using early warning fire detection of incipient sources (i.e., incipient detection) for HNP.
The licensee discussed the status of the traditional fire protection analysis. The NRC asked if the licensee will retain any past exemptions for its NFPA 805 LAR. SNC responded that it knew of five past NRC letters that provided approval for exemptions for fire-related requirements (with each letter containing one or more exemptions), but SNC was not going to retain any of those exemptions for the NFPA 805 LAR.
When the licensee discussed the table on the eighth slide, the NRC staff reemphasized that it is looking for milestones to be provided in the extension request letter that demonstrate SNC is continually working toward the submittal of the LAR. (The NRC staff is looking for assurances that the licensee did not procrastinate or delay its work, which would result in a rushed and low-quality product at the end of the 18-month extension.)
The licensee stated it desired to submit the LAR as quickly as possible because the current compensatory measure - fire watches, has become very expensive.
The NRC staff inquired how the licensee expects its FLEX strategies to affect the FPRA. The licensee responded that it expects a decrease change by a factor, but not by any order of magnitude.
The licensee summarized the additional discussions that it understands are needed in the extension request letter, which are (1) more information on the FPRA peer review results, (2) a more detailed schedule, with milestone dates, and (3) a discussion on the degraded grid voltage protection modifications and how the rerouted cables affect the FPRA.
To conclude the discussions, the NRC staff spoke about the timing of the LAR versus other licensees and the use of the many precedents over the past few years. The HNP LAR will be the last NFPA 805 LAR being reviewed. The licensee should make full use of the lessons learned from the many issued NFPA 805 amendments and errors should be minimized. The NRC will not have the schedule ability to work through technical disagreements. The licensee should ensure all analysis methods have been accepted by the NRC and all items in LAR Attachment S are finalized. The licensee should be prepared to accept an audit within the first year and an issuance of the amendment within 2 years. Requests for additional information response time of 60 days will be standard.
Members of the public were not in attendance. No Public Meeting Feedback Forms were received.
Please direct any inquiries to me at 301-415-3229 or Michael.Orenak@nrc.gov.
IYl4v{__ c) CG-iv Michael D Orenak, Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-321 and 50-366
Enclosure:
List of Attendees cc w/enclosure: Distribution via Listserv
LIST OF ATTENDEES JUNE 21. 2016, PUBLIC MEETING WITH SOUTHERN NUCLEAR OPERATING COMPANY. INC.
REGARDING DELAY OF APPLICATION DATE FOR NFPA 805 LICENSE AMENDMENT REQUEST EDWIN I. HATCH NUCLEAR PLANT. UNIT NOS. 1 AND 2 NAME ORGANIZATION Michael Orenak U.S. Nuclear Regulatory Commission (NRC)
Greg Casto NRC Charles Moulton NRC Jay Robinson NRC Harold Barrett NRC (telephone)
Ken McElroy Southern Nuclear Operating Company (SNC)
Pamela Burns SNC Charles Musgrove SNC Len Casella SNC Michael Torrance SNC Faramarz Pournia SNC John Lattner SNC Jack Curham SNC Enclosure