NL-24-0148, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis

From kanterella
Jump to navigation Jump to search
Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis
ML24156A190
Person / Time
Site: Hatch, 07200036  Southern Nuclear icon.png
Issue date: 06/04/2024
From: Joyce R
Southern Nuclear Operating Co
To:
Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation, Document Control Desk
References
NL-24-0148
Download: ML24156A190 (1)


Text

Regulatory Affairs 3535 Colonnade Parkway Birmingham, AL 35243 205 992 5000 tel June 4, 2024 Docket Nos.: 50-321 NL-24-0148 50-366 72-36 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Edwin I. Hatch Nuclear Plant Units 1 and 2 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis Ladies and Gentlemen:

In accordance with 10 CFR 50.54(q)(5) and 10 CFR 72.44(f), Southern Nuclear Operating Company (SNC) hereby submits descriptions of changes to the emergency plan and a summary of the analysis demonstrating that the changes do not reduce the effectiveness of the plan. The emergency plan continues to meet the requirements in 10 CFR 50 Appendix E and the planning standards of 10 CFR 50.47(b). A description of the changes and a summary of the 50.54(q) analysis is enclosed.

This letter contains no regulatory commitments. If you have any questions, please contact Ryan Joyce at (205) 992-6468.

Respectfully submitted, Ryan M. Joyce Licensing Manager RMJ/agq/cbg

Enclosure:

Description of Emergency Plan Changes and Summary of 50.54(q) Analysis cc:

NRC Director, Division of Spent Fuel Management, NMSS NRC Regional Administrator, Region II NRC NRR Project Manager - Hatch NRC Senior Resident Inspector - Hatch Georgia - State Director of Environmental Protection Division SNC Records RTYPE: CHA02.004

Edwin I. Hatch Nuclear Plant Units 1 and 2 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis Enclosure to NL-24-0148 Description of Emergency Plan Changes and Summary of 50.54(q) Analysis

Enclosure to NL-24-0148 SNC 50.54(q) Summary of Analysis Page E-1 Description of Emergency Plan Changes and Summary of 50.54(q) Analysis On May 9, 2024, Southern Nuclear Operating Company (SNC) implemented Version 9.0 of the SNC Standard Emergency Plan (EP) Annex for Hatch Nuclear Plant (HNP) Units 1 and 2. The changes updated the footnotes below the operating modes table presented in the SNC Standard EP Annex for HNP Units 1 and 2.

SNC has written a 50.54(q) evaluation for these changes and has concluded that the change does not result in a reduction in effectiveness. The operating modes table presented in the SNC Standard EP Annex for HNP Units 1 and 2 is sourced from Technical Specifications Table 1.1-1 MODES, which was modified with the issuance of HNP Units 1 and 2 license amendment numbers 322 and 267, respectively.

These changes were evaluated in accordance with 10 CFR 50.54(q)(3), and SNC determined that the changes do not reduce the effectiveness of the SNC standard emergency plan and site-specific annexes. The SNC emergency plan continues to meet the requirements in 10 CFR 50 Appendix E and the planning standards of 10 CFR 50.47(b).