(One intermediate revision by the same user not shown) |
Line 3: |
Line 3: |
| | issue date = 05/31/1991 | | | issue date = 05/31/1991 |
| | title = Monthly Operating Rept for May 1991 for Nine Mile Point Nuclear Station Unit 1 | | | title = Monthly Operating Rept for May 1991 for Nine Mile Point Nuclear Station Unit 1 |
| | author name = COLEMAN D E | | | author name = Coleman D |
| | author affiliation = NIAGARA MOHAWK POWER CORP. | | | author affiliation = NIAGARA MOHAWK POWER CORP. |
| | addressee name = | | | addressee name = |
Line 17: |
Line 17: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:OPERATING STATUS OPERATING DATA REPORT DOCKET NO.: 50-220 DATE: 6/13/91 PREPARED BY: D.E.Coleman TELEPHONE: | | {{#Wiki_filter:OPERATING DATA REPORT DOCKET NO.: 50-220 DATE: 6/13/91 PREPARED BY: D. E. Coleman TELEPHONE: (315) 349-2558 OPERATING STATUS |
| (315)349-2558 l.Unit Name: Nine Mile Point Unit 8'1 2.Reporting Period: 5/1/91 through 5/31/91 3.Licensed Thermal Power (MWt): 1850 4.Nameplate Rating (Gross MWe): 642 5.Design Electrical Rating (Net MWe): 625 6.Maximum Dependable Capacity (Gross MWe): 635 7.Maximum Dependable Capacity (Net MWe): 615 8.If Changes Occur in Capacity Ratings (items Number 3 through 7)Since Last Report, Give Reasons: Notes 9.Power Level To Which Restricted, If Any (Net MWe): 10.Reasons For Restrictions, If Any: This Month Yr-to-Date Cumulative 11.Hours in Reporting Period 12.Number of Hours Reactor Was Critical 13.Reactor Reserve Shutdown Hours 14.Hours Generator On-Line 15.Unit Reserve Shutdown Hours 16.Gross Thermal Energy Generated (MWH)17.Gross Electrical Energy Generated (MWH)18.Net Electrical Energy Generated (MWH)19.Unit Service Factor 20.Unit Availability Factor 21.Unit Capacity Factor (Using MDC Net)22.Unit Capacity Factor (Using DER Net)23.Unit Forced Outage Rate 24.Shutdowns Scheduled Over Next 6 Months (Type, 3,623.0 2,508.0 0.0 2,444.3 0.0 4,224,970.0 1,446,677.0 1,402,842.0 67.5 67.5 63.0 62,0 7.9 744.0 744.0 0.0 712,9 0.0 1,249,340.0 422,760.0 410,021.0 95.8 95,8 89.6 88,2 0,0 Date and Duration of Each): 190,272.2 121,108.1 1,204.2 117,606.8 20.4 196,767,648.0 65,249,594.0 63,208,682.0 61.8 61.8 54.4 53.6 25.5 25.If Shut Down At End of Report Period, Estimated Date of Startup: 26.Unit is Test Status (Prior to Commercial Operation): | | : l. Unit Name: Nine Mile Point Unit 8'1 |
| Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 9i06190225 9i0*11~(PDR ADOCK 05000220 R PDR lg OPERATING DATA REPORT DOCKET NO.: 50-220 DATE: 6/13/91 PREPARED BY: D.E.Coleman TELEPHONE: | | : 2. Reporting Period: 5/1/91 through 5/31/91 Notes |
| (315)349-2558 MONTH May 1991 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)DAY AVERAGE DAILY POWER LEVEL (MWe-Net)1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 604 605 601 604 605 606 608 606 607 603 605 604 605 249 437 572 17 18 19 20 21 22 23 25 26 27 28 29 30 31 603 604 605 605 604 601 603 599 598 603 604 599 93 92 549 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.Compute to the nearest whole megawatt.
| | : 3. Licensed Thermal Power (MWt): 1850 |
| | : 4. Nameplate Rating (Gross MWe): 642 |
| | : 5. Design Electrical Rating (Net MWe): 625 |
| | : 6. Maximum Dependable Capacity (Gross MWe): 635 |
| | : 7. Maximum Dependable Capacity (Net MWe): 615 |
| | : 8. If Changes Occur in Capacity Ratings (items Number 3 through 7) Since Last Report, Give Reasons: |
| | : 9. Power Level To Which Restricted, If Any (Net MWe): |
| | : 10. Reasons For Restrictions, IfAny: |
| | This Month Yr-to-Date Cumulative |
| | : 11. Hours in Reporting Period 744.0 3,623.0 190,272.2 |
| | : 12. Number of Hours Reactor Was Critical 744.0 2,508.0 121,108.1 |
| | : 13. Reactor Reserve Shutdown Hours 0.0 0.0 1,204.2 |
| | : 14. Hours Generator On-Line 712,9 2,444.3 117,606.8 |
| | : 15. Unit Reserve Shutdown Hours 0.0 0.0 20.4 |
| | : 16. Gross Thermal Energy Generated (MWH) 1,249,340.0 4,224,970.0 196,767,648.0 |
| | : 17. Gross Electrical Energy Generated (MWH) 422,760.0 1,446,677.0 65,249,594.0 |
| | : 18. Net Electrical Energy Generated (MWH) 410,021.0 1,402,842.0 63,208,682.0 |
| | : 19. Unit Service Factor 95.8 67.5 61.8 |
| | : 20. Unit Availability Factor 95,8 67.5 61.8 |
| | : 21. Unit Capacity Factor (Using MDC Net) 89.6 63.0 54.4 |
| | : 22. Unit Capacity Factor (Using DER Net) 88,2 62,0 53.6 |
| | : 23. Unit Forced Outage Rate 0,0 7.9 25.5 |
| | : 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each): |
| | : 25. If Shut Down At End of Report Period, Estimated Date of Startup: |
| | : 26. Unit is Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION 9i06190225 9i0*11 PDR ADOCK 05000220 ~( |
| | R PDR |
|
| |
|
| UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH-May 1991 DOCKET NO: 50-220 UNIT NAME: NMPPl DATE: 6/13/9j PREPARED BY: D.E.Col&man TELEPHONE: | | lg OPERATING DATA REPORT DOCKET NO.: 50-220 DATE: 6/13/91 PREPARED BY: D. E. Coleman TELEPHONE: (315) 349-2558 MONTH May 1991 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL (MWe-Net) (MWe-Net) 1 604 17 603 2 605 18 604 3 601 19 605 4 604 20 605 5 605 21 604 6 606 22 601 7 608 23 603 8 606 599 9 607 25 598 10 603 26 603 11 605 27 604 12 604 28 599 13 605 29 93 14 249 30 92 15 437 31 549 16 572 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. |
| (315)349-2558 No.Date Type'uration (Hours)Reason'ethod of Shutting Down Reactor'icensee Event Report S System Code'omponent Code'ause&Corrective Action to Prevent Recurri e 910514 Thc unit was reduced to 25%Cfp to perform a Turbine Torsional Test.The Test was aborted duc to Pl 1 Turbine Aux Oil Pump failure.910529 S 31.1 The unit was taken off line for a rescheduled Tu*inc Torsional Test.'Ihc reactor remained critical.F: Forced S: Schcdulcd Reason: A-Equipment Failure (Explain)B-Maintenance or Test C-Rcfu cling D-Regulatory Restriction E-Operator Training&, License Exam F-Administrative Gyrational Error (Explain)H~cr (Explain)Method: 1-Manual 2-Manual Scram 3-Automatic Scram 4-Other (Explain)Exhibit G-Instructions for Preparation of Data Entry Shccts for Liccnsce Event Report (LER)File (NUREG-0161) | | Compute to the nearest whole megawatt. |
| Exhibit 1@arne Source}}
| | |
| | UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO: 50-220 UNIT NAME: NMPPl DATE: 6/13/9j REPORT MONTH - May 1991 PREPARED BY: D. E. Col&man TELEPHONE: (315) 349-2558 of & Corrective Date Type'uration (Hours) |
| | Reason'ethod Down Reactor'icensee Shutting Event Report S System Code'ause Code'omponent Action to Prevent Recurri e No. |
| | 910514 Thc unit was reduced to 25% Cfp to perform a Turbine Torsional Test. The Test was aborted duc to Pl 1 Turbine Aux Oil Pump failure. |
| | 910529 S 31.1 The unit was taken off line for a rescheduled Tu*inc Torsional Test. 'Ihc reactor remained critical. |
| | F: Forced Reason: Method: Exhibit G - Instructions Exhibit 1@arne Source S: Schcdulcd A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Shccts for Liccnsce C-Rcfu cling 3-Automatic Scram Event Report (LER) File (NUREG-0161) |
| | D-Regulatory Restriction 4-Other (Explain) |
| | E-Operator Training &, License Exam F-Administrative Gyrational Error (Explain) |
| | H~cr (Explain)}} |
|
---|
Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217K4631999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Nine Mile Point, Unit 1.With ML20212C4601999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Nine Mile Point Nuclear Station,Unit 1.With ML20210U4591999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Nine Mile Point, Unit 1.With ML20210B9081999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Nine Mile Point Unit 1.With ML20196E2111999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Nmp,Unit 1.With ML20196L2301999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Nmp,Unit 1.With ML20205S5701999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for NMP Unit 1.With ML20204C9971999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Nine Mile Point,Unit 1.With ML20199K9331998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Nine Mile Point Nuclear Station,Unit 1.With ML20198D9361998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Nine Mile Point,Unit 1.With ML20195J4141998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Nine Mile Point Nuclear Station,Unit 1.With ML20154P1821998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Nine Mile Point Nuclear Station,Unit 1.With ML20153B2001998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Nmpns,Unit 1.With ML20237C6351998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Nine Mile Point Nuclear Station,Unit 1 ML20236Q1701998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Nine Mile Point Nuclear Station,Unit 1 ML20249B4971998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Nine Mile Point Nuclear Station,Unit 1 ML20247R1141998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Nine Mile Point Nuclear Station,Unit 1 ML20217B0621998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Nine Mile Point Nuclear Station,Unit 1 ML20217B5371998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Nine Mile Point Nuclear Station,Unit 1 ML20203A3071998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Nine Mile Point Nuclear Station,Unit 1 ML20198T0601997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Nine Mile Point Nuclear Station,Unit 1 ML20197B4531997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for NMP Nuclear Station, Unit 1 ML20199H3131997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for NMP Nuclear Station, Unit 1 ML20212A7001997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Nine Mile Point Nuclear Station,Unit 1 ML20211A4981997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Nine Mile Point Nuclear Station Unit 1 ML20217M4101997-07-31031 July 1997 Monthly Operating Rept for July 1997 for NMPNS ML20141H1921997-06-30030 June 1997 Monthly Operating Rept for June 1997 for Nine Mile Point Nuclear Station,Unit 1 ML18037A1361997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Nine Mile Point Nuclear Station,Unit 1 ML17059B5541997-03-31031 March 1997 Revised Monthly Operating Rept for Mar 1997 for Nine Mile Point Nuclear Station,Unit 1 ML17059B5531997-02-28028 February 1997 Revised Monthly Operating Rept for Feb 1997 for Nine Mile Point Nuclear Station,Unit 1 ML18037A1351996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Nine Mile Point, Unit 2.W/961115 Ltr ML18038A5001991-12-31031 December 1991 Monthly Operating Rept for Dec 1991 for Unit 2 Shutdowns & Power Reductions.W/920115 Ltr ML18038A3541991-05-31031 May 1991 Narrative Rept of Operating Experience for May 1991 for Nine Mile Point Nuclear Station Unit 1 ML17058A8061991-05-31031 May 1991 Monthly Operating Rept for May 1991 for Nine Mile Point Nuclear Station Unit 1 ML17058A7071991-03-31031 March 1991 Monthly Operating Rept for Mar 1991 for Nine Mile Point Unit 1 ML17058A7091991-02-28028 February 1991 Corrected Monthly Operating Rept for Feb 1991 for Nine Mile Point Unit 1 ML18038A3401991-01-31031 January 1991 Monthly Operating Rept for Jan 1991 for Nine Mile Point Nuclear Station Unit 1 ML18038A3421990-12-31031 December 1990 Revised Monthly Operating Rept for Dec 1990 for Nine Mile Point Nuclear Station Unit 1 ML18038A3391990-12-31031 December 1990 Monthly Operating Statistics Rept for Dec 1990 for Nine Mile Point Unit 2.Narrative Rept of Operation Experience for Dec 1990 encl.W/910111 Ltr ML17056B2961990-11-30030 November 1990 Revised Monthly Operating Rept for Nov 1990 for Nine Mile Point Nuclear Station Unit 1 ML17056B2971990-10-31031 October 1990 Revised Monthly Operating Rept for Oct 1990 for Nine Mile Point Nuclear Station Unit 1 ML17056B2981990-09-30030 September 1990 Revised Monthly Operating Rept for Sept 1990 for Nine Mile Point Nuclear Station Unit 1 ML17056B2991990-08-31031 August 1990 Revised Monthly Operating Rept for Aug 1990 for Nine Mile Point Nuclear Station Unit 1 ML17056B3001990-07-31031 July 1990 Revised Monthly Operating Rept for Jul 1990 for Nine Mile Point Nuclear Station Unit 1 ML17056B3011990-06-30030 June 1990 Revised Monthly Operating Rept for June 1990 for Nine Mile Point Nuclear Station Unit 1 ML20043H5261990-05-31031 May 1990 Monthly Operating Rept for May 1990 for Nine Mile Point, Unit 2.W/900614 Ltr ML17056B3021990-05-31031 May 1990 Revised Monthly Operating Rept for May 1990 for Nine Mile Point Nuclear Station Unit 1 ML17056B3031990-04-30030 April 1990 Revised Monthly Operating Rept for Apr 1990 for Nine Mile Point Nuclear Station Unit 1 ML17056B3041990-03-31031 March 1990 Revised Monthly Operating Rept for Mar 1990 for Nine Mile Point Nuclear Station Unit 1 ML17056B3051990-02-28028 February 1990 Revised Monthly Operating Rept for Feb 1990 for Nine Mile Point Nuclear Station Unit 1 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217G2161999-10-15015 October 1999 Errata Pages 2 & 3 for Safety Evaluation Supporting Amend 168 Issued to FOL DPR-63 Issued on 990921.New Pages Change Description of Flow Control Trip Ref Cards to Be Consistent with Application for Amend ML20217K4631999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Nine Mile Point, Unit 1.With ML20216J9251999-09-30030 September 1999 Suppl to Special Rept:On 990621,11 Containment Hydrogen Monitoring Sys Chart Recorder Was Indicating Below Normal Operating Range.Caused by Excessive Wear on Valve Body & Discs of Bypass Pump.Sample Pump Replaced ML20212F7301999-09-21021 September 1999 Special Rept:On 990907,CR Operators Declared 12 Containment Hydrogen Monitoring Sys Inoperable for Planned Maint.Cause of Low Flow Condition Was Determined to Be Foreign Matl. Replaced Sample Pump Valve Discs ML20212B9081999-09-14014 September 1999 Special Rept:On 990901, 12 Containment Hydrogen Monitoring Sys Was Declared Inoperable for Planned Maint.Caused by Planned Maint Being Performed as Corrective Action.Check Valves with O Rings Were Replaced ML20212C4601999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Nine Mile Point Nuclear Station,Unit 1.With ML20216F5141999-08-31031 August 1999 Rept on Status of Public Petitions Under 10CFR2.206 ML20210U4591999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Nine Mile Point, Unit 1.With ML20209D0291999-07-0202 July 1999 Special Rept:On 990621,operator Identified That Number 11 Hydrogen Monitoring Sys (Hms) Chart Recorder Was Indicating Below Normal Operating Range.Cause Indeterminate.Licensee Will Complete Troubleshooting of Subject Hms by 990709 ML20210B9081999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Nine Mile Point Unit 1.With ML20209F8811999-06-0808 June 1999 Rev 1 to NMP Unit 1 COLR for Cycle 14 ML20207G2261999-06-0707 June 1999 SER Accepting Proposed Mod to Each of Four Core Shroud Stabilizers for Implementation During Current 1999 Refueling Outage at Plant,Unit 1 ML20196E2111999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Nmp,Unit 1.With ML20207B0241999-05-18018 May 1999 Safety Evaluation of Topical Rept TR-107285, BWR Vessel & Intervals Project,Bwr Top Guide Insp & Flaw Evaluation Guidelines (BWRVIP-26), Dtd December 1996.Rept Acceptable ML20206U5351999-05-17017 May 1999 SER Accepting GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Plant, Units 1 & 2 ML20196L2301999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Nmp,Unit 1.With ML20205L0541999-04-0101 April 1999 Nonproprietary Replacement Pages to HI-91738,consisting of Section 5.0, Thermal-Hydraulic Analysis ML20205S5701999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for NMP Unit 1.With ML20207M9231999-03-12012 March 1999 Amended Part 21 Rept Re Cooper-Bessemer Ksv EDG Power Piston Failure.Total of 198 or More Pistons Have Been Measured at Seven Different Sites.All Potentially Defective Pistons Have Been Removed from Svc Based on Encl Results ML20207G2671999-03-0101 March 1999 Special Rept:On 990315,Nine Mile Point,Unit 1 Declared Number 12 Containment Hydrogen Monitoring Sys Inoperable. Caused by Degraded Encapsulated Reed Switch within Flow Switch FS-201.2-1495.Technicians Replaced Flow Switch ML20204C9971999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Nine Mile Point,Unit 1.With ML20207E9311999-02-26026 February 1999 Part 21 Rept Re Sprague Model TE1302 Aluminum Electrolytic Capacitors with Date Code of 9322H.Caused by Aluminum Electrolytic Capacitors.Affected Capacitors Replaced ML17059C5501999-01-31031 January 1999 Rev 0 to MPR-1966(NP), NMP Unit 1 Core Shroud Vertical Weld Repair Design Rept. ML20199M0891999-01-22022 January 1999 Part 21 Rept Re Failure of Square Root Converters.Caused by Failed Aluminum Electrolytic Capacitory Spargue Electric Co (Model Number TE1302 with Mfg Date Code 9322H).Sent Square Root Converters Back to Mfg,Barker Microfarads,Inc ML20199K9331998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Nine Mile Point Nuclear Station,Unit 1.With ML20210R8441998-12-31031 December 1998 1998 Annual Rept for Energy East ML20206P2391998-12-31031 December 1998 Special Rept:On 981222,operators Removed non-TS Channel 12 Drywell Pressure Recorder & Associated TS Pressure Indicator from Svc.Caused by Intermittent Measuring Cable Connection in non-TS Recorder Circuitry.Replaced Cable ML20206P2421998-12-30030 December 1998 Special Rept:On 981219,number 12 Hydrogen Monitoring Sys (Hms) Was Declared Inoperable When Operators Closed Valve 201.2-601.Caused by Indeterminate Failure of Valve 201.2-71. Supplemental Rept Will Be Submitted After Valve Is Repaired ML20198M3571998-12-23023 December 1998 Special Rept:On 981210,operators Declared Number 11 Inoperable,Due to Failure of CR Chart Recorder.Caused by Inverter Board in Power Supply Circuitry of Recorder Due to Component Aging.Maint Personnel Replaced Failed Inverter ML20198D9361998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Nine Mile Point,Unit 1.With ML20155E2001998-11-0202 November 1998 Safety Evaluation Approving NMP 980227 Request for Extension of Reinspection Interval for Core Shroud Vertical Welds at NMP1 from 10,600 Hours to 14,500 Hours of Hot Operation ML20195J4141998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Nine Mile Point Nuclear Station,Unit 1.With ML20154D8401998-10-0505 October 1998 Safety Evaluation Accepting Proposed Changes Related to PT Limits in Plant,Unit 1 TSs ML20154P1821998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Nine Mile Point Nuclear Station,Unit 1.With ML20153B2001998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Nmpns,Unit 1.With ML20237C6351998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Nine Mile Point Nuclear Station,Unit 1 ML20236T5911998-07-20020 July 1998 LER 98-S01-00:on 980618,security Force Member Left Nine Mile Point,Unit 2 Vehicle Gate Unattended Without Ensuring,Gate Alarm Had Been Reactivated.Caused by Inadequate Work Practice.Vehicle Gate Alarm Was Activated ML18040A3491998-07-0202 July 1998 LER 98-017-00:on 980602,control Room Ventilation Sys Was Declared Inoperable.Caused by Original Design Deficiency. Mod Designed,Tested & Implemented Prior to Startup from RF06 to Correct Design deficiency.W/980702 Ltr ML20236Q1701998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Nine Mile Point Nuclear Station,Unit 1 ML17059C1011998-06-24024 June 1998 LER 98-014-00:on 980525,noted Differences Between Actual Valve Weights & Weights Shown on Engineering Drawings.Caused by Vendor Failing to Provide Accurate Valve Weights.Revised Valve Drawings & Associated Calculation,Per 10CFR21 ML20151P1751998-06-16016 June 1998 Rev 0 to SIR-98-067, Evaluation of NMP Unit 2 Feedwater Nozzle-to-Safe End Weld Butter Indication (Weld 2RPV-KB20, N4D) ML18040A3451998-06-0404 June 1998 LER 98-004-01:on 980302,TS Required LSFT of Level 8 Trip of Main Turbine Was Missed.Caused by Knowledge Deficiency of EHC Sys.Revised Applicable LSFT Procedures Prior to Refueling Outage 6.W/980604 Ltr ML20249B4971998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Nine Mile Point Nuclear Station,Unit 1 ML20248F3531998-05-21021 May 1998 Part 21 Rept Re Electronic Equipment Repaired or Reworked by Integrated Resources,Inc from Approx 930101-980501.Caused by 1 Capacitor in Each Unit Being Installed W/Reverse Polarity. Policy of Second Checking All Capacitors Is Being Adopted ML20198B4991998-05-15015 May 1998 Non-proprietary Replacement Pages for Attachment F to Which Proposed to Change TS 5.5, Storage of Unirradiated & Sf ML20247R1141998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Nine Mile Point Nuclear Station,Unit 1 ML20217B0621998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Nine Mile Point Nuclear Station,Unit 1 ML17059C1681998-03-19019 March 1998 Revised Niagara Mohawk Powerchoice Settlement Document for NMPC PSC Case Numbers 94-E-0098 & 94-E-0099, Vols 1 & 2 ML20217F4341998-03-19019 March 1998 SER Related to Proposed Restructuring New York State Electric & Gas Corp,Nine Mile Point Nuclear Station,Unit 2 ML17059B9051998-02-28028 February 1998 NMP Unit 1 Boat Samples Analyses Part Iii:Tension Tests, RDD:98:55863-004-000:01 1999-09-30
[Table view] |
Text
OPERATING DATA REPORT DOCKET NO.: 50-220 DATE: 6/13/91 PREPARED BY: D. E. Coleman TELEPHONE: (315) 349-2558 OPERATING STATUS
- l. Unit Name: Nine Mile Point Unit 8'1
- 2. Reporting Period: 5/1/91 through 5/31/91 Notes
- 3. Licensed Thermal Power (MWt): 1850
- 4. Nameplate Rating (Gross MWe): 642
- 5. Design Electrical Rating (Net MWe): 625
- 6. Maximum Dependable Capacity (Gross MWe): 635
- 7. Maximum Dependable Capacity (Net MWe): 615
- 8. If Changes Occur in Capacity Ratings (items Number 3 through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted, If Any (Net MWe):
- 10. Reasons For Restrictions, IfAny:
This Month Yr-to-Date Cumulative
- 11. Hours in Reporting Period 744.0 3,623.0 190,272.2
- 12. Number of Hours Reactor Was Critical 744.0 2,508.0 121,108.1
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 1,204.2
- 14. Hours Generator On-Line 712,9 2,444.3 117,606.8
- 15. Unit Reserve Shutdown Hours 0.0 0.0 20.4
- 16. Gross Thermal Energy Generated (MWH) 1,249,340.0 4,224,970.0 196,767,648.0
- 17. Gross Electrical Energy Generated (MWH) 422,760.0 1,446,677.0 65,249,594.0
- 18. Net Electrical Energy Generated (MWH) 410,021.0 1,402,842.0 63,208,682.0
- 19. Unit Service Factor 95.8 67.5 61.8
- 20. Unit Availability Factor 95,8 67.5 61.8
- 21. Unit Capacity Factor (Using MDC Net) 89.6 63.0 54.4
- 22. Unit Capacity Factor (Using DER Net) 88,2 62,0 53.6
- 23. Unit Forced Outage Rate 0,0 7.9 25.5
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
- 25. If Shut Down At End of Report Period, Estimated Date of Startup:
- 26. Unit is Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION 9i06190225 9i0*11 PDR ADOCK 05000220 ~(
R PDR
lg OPERATING DATA REPORT DOCKET NO.: 50-220 DATE: 6/13/91 PREPARED BY: D. E. Coleman TELEPHONE: (315) 349-2558 MONTH May 1991 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL (MWe-Net) (MWe-Net) 1 604 17 603 2 605 18 604 3 601 19 605 4 604 20 605 5 605 21 604 6 606 22 601 7 608 23 603 8 606 599 9 607 25 598 10 603 26 603 11 605 27 604 12 604 28 599 13 605 29 93 14 249 30 92 15 437 31 549 16 572 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO: 50-220 UNIT NAME: NMPPl DATE: 6/13/9j REPORT MONTH - May 1991 PREPARED BY: D. E. Col&man TELEPHONE: (315) 349-2558 of & Corrective Date Type'uration (Hours)
Reason'ethod Down Reactor'icensee Shutting Event Report S System Code'ause Code'omponent Action to Prevent Recurri e No.
910514 Thc unit was reduced to 25% Cfp to perform a Turbine Torsional Test. The Test was aborted duc to Pl 1 Turbine Aux Oil Pump failure.
910529 S 31.1 The unit was taken off line for a rescheduled Tu*inc Torsional Test. 'Ihc reactor remained critical.
F: Forced Reason: Method: Exhibit G - Instructions Exhibit 1@arne Source S: Schcdulcd A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Shccts for Liccnsce C-Rcfu cling 3-Automatic Scram Event Report (LER) File (NUREG-0161)
D-Regulatory Restriction 4-Other (Explain)
E-Operator Training &, License Exam F-Administrative Gyrational Error (Explain)
H~cr (Explain)