ML17059B553: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(6 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 02/28/1997 | | issue date = 02/28/1997 | ||
| title = Revised Monthly Operating Rept for Feb 1997 for Nine Mile Point Nuclear Station,Unit 1 | | title = Revised Monthly Operating Rept for Feb 1997 for Nine Mile Point Nuclear Station,Unit 1 | ||
| author name = | | author name = Coleman D | ||
| author affiliation = NIAGARA MOHAWK POWER CORP. | | author affiliation = NIAGARA MOHAWK POWER CORP. | ||
| addressee name = | | addressee name = | ||
Line 14: | Line 14: | ||
| document type = MONTHLY OPERATING ANALYSIS REPORT, TEXT-SAFETY REPORT | | document type = MONTHLY OPERATING ANALYSIS REPORT, TEXT-SAFETY REPORT | ||
| page count = 2 | | page count = 2 | ||
}} | }} | ||
=Text= | |||
{{#Wiki_filter:OPERATING DATA REPORT DOCKET NO.: 50-220 DATE: 3/05/97 PREPARED BY: D. E. Coleman TELEPHONE: (315) 349-2558 OPERATING STATUS Rev. I I | |||
: 1. Unit Name: Nine Mile Point Unit //1 | |||
: 2. Reporting Period: February 1997 Notes | |||
: 3. Licensed Thermal Power (MWt): 1850 | |||
: 4. Nameplate Rating (Gross MWe): 642 | |||
: 5. Design Electrical Rating (Net MWe): 613 | |||
: 6. Maximum Dependable Capacity (Gross MWe): 584 | |||
: 7. Maximum Dependable Capacity (Net MWe): 565 | |||
: 8. If Changes Occur in Capacity Ratings (items Number 3 through 7) Since Last Report, Give Reasons: | |||
: 9. Power Level To Which Restricted, If Any (Net MWe): | |||
: 10. Reasons For Restrictions, If Any: | |||
This Month Yr-to-Date Cumulative | |||
: 11. Hours in Reporting Period 672.0 1416.0 240,673.2 | |||
: 12. Number of Hours Reactor Was Critical 672.0 1381.9 163658.9 | |||
: 13. Reactor Reserve Shutdown Hours 0 0 1,204.2 | |||
: 14. Hours Generator On-Line 672.0 1374,2 159,730.4 | |||
: 15. Unit Reserve Shutdown Hours 0 0 20.4 | |||
: 16. Gross Thermal Energy Generated (MWH) 1,211,908.0 2,497,347.0 271,704,127.0 | |||
: 17. Gross Electrical Energy Generated (MWH) 414,717.0 853,969.0 90,432,425.0 | |||
: 18. Net Electrical Energy Generated (MWH) 403,462.0 830,712,0 87,692,266,0 | |||
: 19. Unit Service Factor 100.0 97.0 66.4 | |||
: 20. Unit Availability Factor 100.0 97.0 66.4 | |||
: 21. Unit Capacity Factor (Using MDC Net) 106.3 103.8 60.3 | |||
: 22. Unit Capacity Factor (Using DER Net) 97.9 95.7 58.8 | |||
: 23. Unit Forced Outage Rate 0.0 3.0 22.2 | |||
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each): | |||
(35 Day Refuel Outage scheduled for March 3, 1997) | |||
: 25. If shutdown At End of Report Period, Estimated Date of Startup: | |||
97052203%9 970512 PDR ADQCK 05000220 | |||
.R PDR | |||
~ 0}} |
Latest revision as of 06:30, 30 October 2019
ML17059B553 | |
Person / Time | |
---|---|
Site: | Nine Mile Point |
Issue date: | 02/28/1997 |
From: | Coleman D NIAGARA MOHAWK POWER CORP. |
To: | |
Shared Package | |
ML17059B552 | List: |
References | |
NUDOCS 9705220319 | |
Download: ML17059B553 (2) | |
Text
OPERATING DATA REPORT DOCKET NO.: 50-220 DATE: 3/05/97 PREPARED BY: D. E. Coleman TELEPHONE: (315) 349-2558 OPERATING STATUS Rev. I I
- 1. Unit Name: Nine Mile Point Unit //1
- 2. Reporting Period: February 1997 Notes
- 3. Licensed Thermal Power (MWt): 1850
- 4. Nameplate Rating (Gross MWe): 642
- 5. Design Electrical Rating (Net MWe): 613
- 6. Maximum Dependable Capacity (Gross MWe): 584
- 7. Maximum Dependable Capacity (Net MWe): 565
- 8. If Changes Occur in Capacity Ratings (items Number 3 through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted, If Any (Net MWe):
- 10. Reasons For Restrictions, If Any:
This Month Yr-to-Date Cumulative
- 11. Hours in Reporting Period 672.0 1416.0 240,673.2
- 12. Number of Hours Reactor Was Critical 672.0 1381.9 163658.9
- 13. Reactor Reserve Shutdown Hours 0 0 1,204.2
- 14. Hours Generator On-Line 672.0 1374,2 159,730.4
- 15. Unit Reserve Shutdown Hours 0 0 20.4
- 16. Gross Thermal Energy Generated (MWH) 1,211,908.0 2,497,347.0 271,704,127.0
- 17. Gross Electrical Energy Generated (MWH) 414,717.0 853,969.0 90,432,425.0
- 18. Net Electrical Energy Generated (MWH) 403,462.0 830,712,0 87,692,266,0
- 19. Unit Service Factor 100.0 97.0 66.4
- 20. Unit Availability Factor 100.0 97.0 66.4
- 21. Unit Capacity Factor (Using MDC Net) 106.3 103.8 60.3
- 22. Unit Capacity Factor (Using DER Net) 97.9 95.7 58.8
- 23. Unit Forced Outage Rate 0.0 3.0 22.2
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
(35 Day Refuel Outage scheduled for March 3, 1997)
- 25. If shutdown At End of Report Period, Estimated Date of Startup:
97052203%9 970512 PDR ADQCK 05000220
.R PDR
~ 0