ML17059B553: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(6 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 02/28/1997
| issue date = 02/28/1997
| title = Revised Monthly Operating Rept for Feb 1997 for Nine Mile Point Nuclear Station,Unit 1
| title = Revised Monthly Operating Rept for Feb 1997 for Nine Mile Point Nuclear Station,Unit 1
| author name = COLEMAN D E
| author name = Coleman D
| author affiliation = NIAGARA MOHAWK POWER CORP.
| author affiliation = NIAGARA MOHAWK POWER CORP.
| addressee name =  
| addressee name =  
Line 14: Line 14:
| document type = MONTHLY OPERATING ANALYSIS REPORT, TEXT-SAFETY REPORT
| document type = MONTHLY OPERATING ANALYSIS REPORT, TEXT-SAFETY REPORT
| page count = 2
| page count = 2
| revision = 0
}}
}}
=Text=
{{#Wiki_filter:OPERATING DATA REPORT                          DOCKET NO.: 50-220 DATE: 3/05/97 PREPARED BY: D. E. Coleman TELEPHONE: (315) 349-2558 OPERATING STATUS Rev. I                                                                                            I
: 1. Unit Name: Nine Mile Point Unit //1
: 2. Reporting Period: February 1997                                            Notes
: 3. Licensed Thermal Power (MWt):                        1850
: 4. Nameplate Rating (Gross MWe):                        642
: 5. Design Electrical Rating (Net MWe):                  613
: 6. Maximum Dependable Capacity (Gross MWe):              584
: 7. Maximum Dependable Capacity (Net MWe):                565
: 8. If Changes Occur in Capacity Ratings (items Number 3 through 7) Since Last Report, Give Reasons:
: 9. Power Level To Which Restricted,    If Any (Net MWe):
: 10. Reasons For Restrictions,  If Any:
This Month      Yr-to-Date        Cumulative
: 11. Hours in Reporting Period                                    672.0          1416.0          240,673.2
: 12. Number    of Hours Reactor  Was Critical                      672.0          1381.9          163658.9
: 13. Reactor Reserve Shutdown Hours                                  0                0            1,204.2
: 14. Hours Generator On-Line                                      672.0          1374,2          159,730.4
: 15. Unit Reserve Shutdown Hours                                    0                0                20.4
: 16. Gross Thermal Energy Generated (MWH)                  1,211,908.0      2,497,347.0      271,704,127.0
: 17. Gross Electrical Energy Generated (MWH)                414,717.0        853,969.0      90,432,425.0
: 18. Net Electrical Energy Generated (MWH)                  403,462.0        830,712,0      87,692,266,0
: 19. Unit Service Factor                                          100.0              97.0              66.4
: 20. Unit Availability Factor                                    100.0              97.0              66.4
: 21. Unit Capacity Factor (Using MDC Net)                        106.3            103.8              60.3
: 22. Unit Capacity Factor (Using DER Net)                          97.9              95.7              58.8
: 23. Unit Forced Outage Rate                                        0.0              3.0              22.2
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
(35 Day Refuel Outage scheduled for March 3, 1997)
: 25. If shutdown  At End of Report Period, Estimated Date of Startup:
97052203%9 970512 PDR      ADQCK      05000220
  .R                          PDR
~ 0}}

Latest revision as of 06:30, 30 October 2019

Revised Monthly Operating Rept for Feb 1997 for Nine Mile Point Nuclear Station,Unit 1
ML17059B553
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 02/28/1997
From: Coleman D
NIAGARA MOHAWK POWER CORP.
To:
Shared Package
ML17059B552 List:
References
NUDOCS 9705220319
Download: ML17059B553 (2)


Text

OPERATING DATA REPORT DOCKET NO.: 50-220 DATE: 3/05/97 PREPARED BY: D. E. Coleman TELEPHONE: (315) 349-2558 OPERATING STATUS Rev. I I

1. Unit Name: Nine Mile Point Unit //1
2. Reporting Period: February 1997 Notes
3. Licensed Thermal Power (MWt): 1850
4. Nameplate Rating (Gross MWe): 642
5. Design Electrical Rating (Net MWe): 613
6. Maximum Dependable Capacity (Gross MWe): 584
7. Maximum Dependable Capacity (Net MWe): 565
8. If Changes Occur in Capacity Ratings (items Number 3 through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Yr-to-Date Cumulative

11. Hours in Reporting Period 672.0 1416.0 240,673.2
12. Number of Hours Reactor Was Critical 672.0 1381.9 163658.9
13. Reactor Reserve Shutdown Hours 0 0 1,204.2
14. Hours Generator On-Line 672.0 1374,2 159,730.4
15. Unit Reserve Shutdown Hours 0 0 20.4
16. Gross Thermal Energy Generated (MWH) 1,211,908.0 2,497,347.0 271,704,127.0
17. Gross Electrical Energy Generated (MWH) 414,717.0 853,969.0 90,432,425.0
18. Net Electrical Energy Generated (MWH) 403,462.0 830,712,0 87,692,266,0
19. Unit Service Factor 100.0 97.0 66.4
20. Unit Availability Factor 100.0 97.0 66.4
21. Unit Capacity Factor (Using MDC Net) 106.3 103.8 60.3
22. Unit Capacity Factor (Using DER Net) 97.9 95.7 58.8
23. Unit Forced Outage Rate 0.0 3.0 22.2
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

(35 Day Refuel Outage scheduled for March 3, 1997)

25. If shutdown At End of Report Period, Estimated Date of Startup:

97052203%9 970512 PDR ADQCK 05000220

.R PDR

~ 0