ML18017B099: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:REGULATE INFORMATION DISTRISUTIONOf STEM (RIOR)ACCESSION NBR:8006090306 DOC~DATE: 80/05/30 NOTARIZED:
{{#Wiki_filter:REGULATE INFORMATION DISTRISUTIONOfSTEM (RIOR)
NO'DOCKET FACIL!50-400 Shearon Harris Nuc'lear Power P.lantg Unit ig Carol-ina 05000400 50-401 Shearon Harris Nuclear Power Planti Unit 2i Carolina-05000401 50 402 Shearon Harris Nuclear Power Plantg Unit 3~Carol;ina 05000402 AUTH BYNAME AUTHOR AFF'ILI ATION CHI A'NG I E N~J,.Carolina Power 8 L i gh t Co, RKCIP~NAME RECIPIENT AFFILIATION
ACCESSION NBR:8006090306               DOC ~ DATE: 80/05/30               NOTARIZED:               NO       'DOCKET FACIL!50-400 Shearon Harris Nuc'lear Power P.lantg Unit ig Carol-ina                                         05000400 50-401 Shearon Harris Nuclear Power Planti Unit 2i Carolina-BYNAME 05000401 50 402 Shearon Harris Nuclear Power Plantg Unit 3~ Carol;ina                                         05000402 AUTH                       AUTHOR AFF'ILIATION CHI A'NG I E N ~ J,.     Carolina Power 8 L i gh t Co, RKCIP ~ NAME               RECIPIENT AFFILIATION


==SUBJECT:==
==SUBJECT:==
Interim deficiency rept re procurementrfabricati:on 8 insp of engineered plates for concr'ete embedment L support of" safety related loads.Investigation revealed 469 plates requ'iring correction action".DISTRIBUTION CODE: B019S COPIES RECEIVED:LTR
Interim deficiency rept re procurementrfabricati:on 8of"insp of engineered plates for concr'ete embedment L support safety related loads. Investigation revealed 469 plates requ'iring correction action".
'NCL" SIZE!TITLE>Conetructton Deftctency Repoit (lOCFR50,55K)
DISTRIBUTION CODE: B019S COPIES RECEIVED:LTR                                 'NCL"               SIZE!
ES Pg~OTES.ACTION: REC IP IENT COPIES RECIPIENT.
TITLE> Conetructton Deftctency Repoit                                 (lOCFR50,55K)
ID CODE/NAME LTTR ENCL ID CODE/NAME 14 PM~~~&A-1 1,15 BC a~g 20 LA a~~~5 1 1 21 AD a (5Fts n COPIES LTTR"KACL, 1 INTERNALe EG FILE-TK.08 MPA 10 QAB 13F IELD COOR/IE 17 AD PLANT" SYS 22 DIR DPM AD/RCI/IE AEOD GEOSCIENCES BR IEC SYS BR MECH ENG BR STRUCT KNG BR'2 1 1 1 1 i 1 1-1 1 1 02 NRC PDR 07 EDO: L STAFF'9 DEPY DIR."DPM 11 STANDRDS DEV 16 AD FOR ENGR"l7 AD/CORKECON7 23 OELD, AD/SITE'ECH DIRECTOR DSEI HANAUERiS'ATLl ENG BR'OWER'SYS BR 1 1 1 1'1 1 1 1 i 1 i, 1.1 i 1 1 1'1 EXTERNAL: 03 LPDR 24 ACRS 16 04 NS'IC'g0 TOTAL NUMBER OF COPIES REQUIRED: LTTR 48 ENCL'8 tl II 4~I I'l w I;'p fl H N (u'W File: SB H 2/1S Item 12 May 30, 1980 Mr.samos P.O'Reilly United States Nuclear Regulatory Commission Region II 101 Marietta Street, HH Atlanta, Georgia 30303 SHEAROH HARRIS NUCLEAR PGNR PLANT UNXTS 1, 2, 3 AND 4 DEFXCXENCXES IN THE PROCUREKNT, FAHRXCATION AND INSPECTION OF ENGINEERED PLATES FOR CONCRETE EAEDNEMT AND SUPPORT 01 SAFaMX RELATED LOADS-INTERIM REPORT/'--4'~/
Pg ~
OTES.
ES REC IP IENT       COPIES               RECIPIENT.                               COPIES ID CODE/NAME                             ID CODE/NAME                             LTTR"KACL, ACTION:        14 PM 20 LA a
                        ~~~&A-
                            ~~~5 LTTR ENCL 1
1 1,15 1      21 AD BC a a
                                                                          ~g (5Fts         n                   1 INTERNALe             EG FILE                       02 NRC PDR                                      1    1
                  -TK.                   2             07 EDO: L               STAFF'9 1
08 MPA                    1                      DEPY DIR."DPM                         1 10 QAB                    1              11     STANDRDS DEV                         '1    1
                                                                                                "
13F IELD COOR/IE          1            16 AD FOR ENGR                                 1    1 17 AD PLANT" SYS          1            l7 AD/CORKECON7                                 i    1 22 DIR DPM                i            23 OELD,                                        i, AD/RCI/IE                1            AD/SITE'ECH                                           1 AEOD                      1-            DIRECTOR DSEI                                 .1    i GEOSCIENCES      BR      1            HANAUERiS'ATLl 1    1
                                                                                                          '
IEC SYS BR                                            ENG                              1 MECH ENG BR              1 BR'OWER'SYS BR               1 STRUCT KNG BR'           1 EXTERNAL: 03 LPDR                                     04 NS'IC' 24 ACRS                  16 g0 TOTAL NUMBER OF COPIES           REQUIRED: LTTR     48         ENCL'8


==Dear Hr.O'Railly:==
tl                      II 4
Per our September 5, 1979, interim report on tho sub)act deficiency, wa informed you that there vere 236 plates in question that required corrective action.Par our February 29, 1980, latter on the eub)oct deficiency, ve informed you that (a)three plates still xemain on gA hold pendiug completion of corrective action involving NDE, (b)'engineering evaluation of several plates remain incomplete, (c)final accountability of all plates still needs to be resolved, and (d)that tna estimated data for completion of correction action ie June 1, 1980.1aa intent of this letter ie to inform you that further investigation hae revealed that there aro now a total of 469 plates that are in question,'ll corrective action hae not yat boon completed aud it ie estimated that corrective action vie.1 ba completed by September 1, 1980, at which time tha final 10CFR50.55(a) report vill ba submitted.
                              ~ I I    'l  w I;
Qe will routinely keep you appraised of our progress on this item during your site inspection visits.Tha current status of corrective action is as follove:
                  'p fl  H N
kh.James P.O'Reilly Hay 30 1980 (a)Of the 469 defective plates identified, corrective action has been completed on 439 plates, 8 plates are lost and 22 plates still require som form of corrective action (10 out of these 22 plates require Engineering evaluation), (b)Ve have verifi'ed that.the 8 unaccounted for plates have not been installed and have instituted measures to preclude them from being installed without the proper corrective action being taken.Qe suspect that the unaccountability of the 8 plates is either a bookkeeping error or the plates have been mistaIcenly scrapped.Xf you have any questions regardinE thi's matterplease do not hesitate'o contact me.Tours very truly, OiigInil Signed Bhr N'>.'Chiangi
(
'4.J.Chianpi-ilanaper Enpineexing 6 Construction Quality Assurance ZVu/~h (897 136)cc: Mr.V.Stello (2) 0}}
    '
u W
 
File:  SB H  2/1S Item  12 May 30, 1980 Mr. samos P. O'Reilly United States Nuclear Regulatory Commission Region  II 101  Marietta Street, HH Atlanta, Georgia 30303 SHEAROH HARRIS NUCLEAR PGNR PLANT UNXTS 1, 2, 3 AND 4 DEFXCXENCXES IN THE PROCUREKNT, FAHRXCATION AND INSPECTION OF ENGINEERED PLATES FOR CONCRETE EAEDNEMT AND
                                                  -
                                  /'-
SUPPORT 01 SAFaMX RELATED LOADS
                                          -    4    '~/
INTERIM REPORT
 
==Dear Hr. O'Railly:==
 
Per our September 5, 1979, interim report on tho sub)act deficiency, wa informed you that there vere 236 plates in question that required corrective action. Par our February 29, 1980, latter on the eub)oct deficiency, ve informed you that (a) three plates     still   xemain on gA hold pendiug completion of corrective action involving NDE, (b) 'engineering evaluation of several plates remain incomplete, (c) final accountability of all plates still needs to be resolved, and (d) that tna estimated data for completion of correction action ie June 1, 1980.
1aa intent of this letter ie to inform     you that further investigation       hae revealed that there aro now a total of 469 plates that are in corrective action hae not yat boon completed aud       it       question,'ll ie estimated that corrective action vie.1 ba completed by September 1, 1980, at which time tha final 10CFR50.55(a) report     vill ba submitted. Qe will routinely keep you appraised   of our progress on this   item during your site inspection visits. Tha current status of corrective action is as follove:
 
kh. James P. O'Reilly                                               Hay 30         1980 (a)   Of the 469   defective plates identified, corrective action has been completed on 439     plates, 8 plates are lost and 22 still require som form of corrective action (10 out ofplates          these 22 plates require Engineering evaluation),
(b)   Ve have   verifi'ed that. the 8 unaccounted for plates have not been installed and have instituted measures to preclude them from being installed without the proper corrective action being taken. Qe suspect that the unaccountability of the 8 plates is either a bookkeeping error or the plates have been mistaIcenly scrapped.
Xf you have any questions regardinE thi's matterplease         do not hesitate'o contact me.
Tours very   truly, OiigInil Signed Bhr N '>.'Chiangi
                                                          '4. J. Chianpi - ilanaper Enpineexing 6 Construction Quality Assurance ZVu/~h (897 136) cc:   Mr. V. Stello (2)
 
0}}

Revision as of 05:08, 22 October 2019

Interim Deficiency Rept Re Procurement,Fabrication & Insp of Engineered Plates for Concrete Embedment & Support of safety-related Loads.Investigation Revealed 469 Plates Requiring Corrective Action
ML18017B099
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 05/30/1980
From: Chiangi N
CAROLINA POWER & LIGHT CO.
To:
References
SH-N-2-18, NUDOCS 8006090306
Download: ML18017B099 (5)


Text

REGULATE INFORMATION DISTRISUTIONOfSTEM (RIOR)

ACCESSION NBR:8006090306 DOC ~ DATE: 80/05/30 NOTARIZED: NO 'DOCKET FACIL!50-400 Shearon Harris Nuc'lear Power P.lantg Unit ig Carol-ina 05000400 50-401 Shearon Harris Nuclear Power Planti Unit 2i Carolina-BYNAME 05000401 50 402 Shearon Harris Nuclear Power Plantg Unit 3~ Carol;ina 05000402 AUTH AUTHOR AFF'ILIATION CHI A'NG I E N ~ J,. Carolina Power 8 L i gh t Co, RKCIP ~ NAME RECIPIENT AFFILIATION

SUBJECT:

Interim deficiency rept re procurementrfabricati:on 8of"insp of engineered plates for concr'ete embedment L support safety related loads. Investigation revealed 469 plates requ'iring correction action".

DISTRIBUTION CODE: B019S COPIES RECEIVED:LTR 'NCL" SIZE!

TITLE> Conetructton Deftctency Repoit (lOCFR50,55K)

Pg ~

OTES.

ES REC IP IENT COPIES RECIPIENT. COPIES ID CODE/NAME ID CODE/NAME LTTR"KACL, ACTION: 14 PM 20 LA a

~~~&A-

~~~5 LTTR ENCL 1

1 1,15 1 21 AD BC a a

~g (5Fts n 1 INTERNALe EG FILE 02 NRC PDR 1 1

-TK. 2 07 EDO: L STAFF'9 1

08 MPA 1 DEPY DIR."DPM 1 10 QAB 1 11 STANDRDS DEV '1 1

"

13F IELD COOR/IE 1 16 AD FOR ENGR 1 1 17 AD PLANT" SYS 1 l7 AD/CORKECON7 i 1 22 DIR DPM i 23 OELD, i, AD/RCI/IE 1 AD/SITE'ECH 1 AEOD 1- DIRECTOR DSEI .1 i GEOSCIENCES BR 1 HANAUERiS'ATLl 1 1

'

IEC SYS BR ENG 1 MECH ENG BR 1 BR'OWER'SYS BR 1 STRUCT KNG BR' 1 EXTERNAL: 03 LPDR 04 NS'IC' 24 ACRS 16 g0 TOTAL NUMBER OF COPIES REQUIRED: LTTR 48 ENCL'8

tl II 4

~ I I 'l w I;

'p fl H N

(

'

u W

File: SB H 2/1S Item 12 May 30, 1980 Mr. samos P. O'Reilly United States Nuclear Regulatory Commission Region II 101 Marietta Street, HH Atlanta, Georgia 30303 SHEAROH HARRIS NUCLEAR PGNR PLANT UNXTS 1, 2, 3 AND 4 DEFXCXENCXES IN THE PROCUREKNT, FAHRXCATION AND INSPECTION OF ENGINEERED PLATES FOR CONCRETE EAEDNEMT AND

-

/'-

SUPPORT 01 SAFaMX RELATED LOADS

- 4 '~/

INTERIM REPORT

Dear Hr. O'Railly:

Per our September 5, 1979, interim report on tho sub)act deficiency, wa informed you that there vere 236 plates in question that required corrective action. Par our February 29, 1980, latter on the eub)oct deficiency, ve informed you that (a) three plates still xemain on gA hold pendiug completion of corrective action involving NDE, (b) 'engineering evaluation of several plates remain incomplete, (c) final accountability of all plates still needs to be resolved, and (d) that tna estimated data for completion of correction action ie June 1, 1980.

1aa intent of this letter ie to inform you that further investigation hae revealed that there aro now a total of 469 plates that are in corrective action hae not yat boon completed aud it question,'ll ie estimated that corrective action vie.1 ba completed by September 1, 1980, at which time tha final 10CFR50.55(a) report vill ba submitted. Qe will routinely keep you appraised of our progress on this item during your site inspection visits. Tha current status of corrective action is as follove:

kh. James P. O'Reilly Hay 30 1980 (a) Of the 469 defective plates identified, corrective action has been completed on 439 plates, 8 plates are lost and 22 still require som form of corrective action (10 out ofplates these 22 plates require Engineering evaluation),

(b) Ve have verifi'ed that. the 8 unaccounted for plates have not been installed and have instituted measures to preclude them from being installed without the proper corrective action being taken. Qe suspect that the unaccountability of the 8 plates is either a bookkeeping error or the plates have been mistaIcenly scrapped.

Xf you have any questions regardinE thi's matterplease do not hesitate'o contact me.

Tours very truly, OiigInil Signed Bhr N '>.'Chiangi

'4. J. Chianpi - ilanaper Enpineexing 6 Construction Quality Assurance ZVu/~h (897 136) cc: Mr. V. Stello (2)

0