{{#Wiki_filter:....VIRGIflIA ELECTRIC AND P0'.lER COMPAtlY i;0RTH AtlNA POWER STATI0ft P0llTHLY OPERATIt!G REPORT P.0fiTH June YEAR 1979 (Revised 11-05-79) t.SUBMITTED:
{{#Wiki_filter:..
*%~'Q, bN csp., SUPERINTEll0Elli - OPERATIOilS APPROVED:/k i4ANAGER J 1367.324 2911200 5 6 6 OPERATING DATA REPORT 50-338 DOCKET NO.
.
DATE M .E.*L%.
                                            .
COMPLETED fly JL.JL !htyson TELEPl!ONE (_W)@g4.-5151 OPERATING STATUS florth Anna, Unit 1 Notes 1. Unit N>r.w:
VIRGIflIA ELECTRIC AND P0'.lER COMPAtlY i;0RTH AtlNA POWER STATI0ft P0llTHLY OPERATIt!G REPORT P.0fiTH June   YEAR 1979 (Revised 11-05-79) t
dune 1979 (Revised)2. Reporting Period:
                    .
: 3. Licenud Thermal Power (MWr):
SUBMITTED:
2775 947*4. Nameptate R2tiag (Gron 51We):
                              *%~'Q,     bN csp.,
90/5. Design Elearical Rating (Net SIWE):
SUPERINTEll0Elli - OPERATIOilS APPROVED:
928 6. Maximum Dependab!e Capacity (Gross SIWE):
                                  /k i4ANAGER J 1367 .324 2911200 5 6 6
898 7. 51aximura Dependable Capacity (Net MWe):
 
OPERATING DATA REPORT DOCKET NO.
50-338 DATE M .E.*L%.
COMPLETED fly JL.JL !htyson TELEPl!ONE (_W)@g4.-5151 OPERATING STATUS florth Anna, Unit 1                           Notes
: 1. Unit N>r.w:
: 2. Reporting Period:                  dune 1979       (Revised)
: 3. Licenud Thermal Power (MWr):             2775
                                                                                                    *
: 4. Nameptate R2tiag (Gron 51We):             947
: 5. Design Elearical Rating (Net SIWE):       90/
: 6. Maximum Dependab!e Capacity (Gross SIWE):           928
: 7. 51aximura Dependable Capacity (Net MWe):           898
: 8. If Chanps Occur in Capacity Ra.ings (Items Number 3 Throu th 7) Since Last Report, Give Reasons:
: 8. If Chanps Occur in Capacity Ra.ings (Items Number 3 Throu th 7) Since Last Report, Give Reasons:
fl/A NE 9. Power Lev 4 To Which Restricted,if Any (Net MWe):
fl/A
h 10. Reasons Fue Restrictions,if Any:
: 9. Power Lev 4 To Which Restricted,if Any (Net MWe):             NE
_,. _ - .....This Month
: 10. Reasons Fue Restrictions,if Any:
__ Yr.-to-Date Cumulative 20 11, ilours In Reporting Period
h          ,
., 4,343 9,360 12. Number Of floors Reactor W.n Critical 720-3.103 9 n/.s._13. Reactor Rmrve Shutdown Hours 0 48.7 1/5.5..L 14. Ilours Ger:erator On.Line 720 3,331.3 7,983 0 0 0 15. Unit Rexne Shutdown itour, 16. Gruu The mal Enegy Genented IMWii) 1,945,847_8.29]faR95 21.113 490
_
: 17. Gron Elec:rical Energy Generate 1(MWH) 617 457 2d46,527_6 7.16d6L__
                                                                                                                . _ - .
1 IS. Net Electried Energy Generated (Mhlf) 583 847 2,684.,7/8 6.349.3.2& _
                                                                                                                        . .
L 19. Unit Service Factor 100 76.7 8 5 3._, 2 100 76.7 85.3 20. Unit Asailability Factor
                                                                                                          ..
: 21. Unit Capacity Factor (U. sing MDC Net) 90.3 68.8 7.5,5_89.4 68.1 7ML 22. Unit Capacity Factor (Using DER Net) 0 7.5 4.1 23. Unit ForcM Outage Rate
This Month         __ Yr.-to-Date           Cumulative 11, ilours In Reporting Period 20
'24. Shutdowm Scheduled Over Next 6 Months (Type. Date.and Duration of Eacht Refueling; September, October and flovember; 11 Weeks
                                                                .,
..25. If Shut Down At End Of Report Penod. Estimated Date of Startup:
4,343                   9,360
II/A 26. Units In Test Status (Prior to Commercial Operation):
: 12. Number Of floors Reactor W.n Critical                   720-               3.103 9               n/.s._
Foreca >r Achieved.INITIA L CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1367 525 mm DOCKET NO. 50-333
: 13. Reactor Rmrve Shutdown Hours                                 0                   48.7                 1/5.5..
, UNIT SliUIDOWNS AND POWER REDUCTIONS North Anna Unit #1 UNrr N AME DA TE ll-5-79 COMPLETED BY
L
'A r> _ >>,disqn REPORT MONTII June 1979 (Revised)
: 14. Ilours Ger:erator On.Line                               720               3,331.3                 7,983
: 15. Unit Rexne Shutdown itour,                                   0                      0                    0
: 16. Gruu The mal Enegy Genented IMWii)             1,945,847            _8.29]faR95           21.113 490
: 17. Gron Elec:rical Energy Generate 1(MWH)             617 1457            2d46,527            _6 7.16d6L__
IS. Net Electried Energy Generated (Mhlf)             583 847             2,684.,7/8 L        6.349.3.2& _
: 19. Unit Service Factor                                     100                     76.7                   8 52 3._,
: 20. Unit Asailability Factor                                100                     76.7                   85.3
: 21. Unit Capacity Factor (U. sing MDC Net)                     90.3                 68.8                   7.5,5_
: 22. Unit Capacity Factor (Using DER Net)                     89.4                   68.1                   7ML
: 23. Unit ForcM Outage Rate                                       0                      7.5                  4.1
                                                                                                        '
: 24. Shutdowm Scheduled Over Next 6 Months (Type. Date.and Duration of Eacht Refueling; September, October and flovember; 11 Weeks
                                                                                                                      ..
: 25. If Shut Down At End Of Report Penod. Estimated Date of Startup:         II/A
: 26. Units In Test Status (Prior to Commercial Operation):                     Foreca >r           Achieved
.
INITIA L CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1367       525             mm
 
UNIT SliUIDOWNS AND POWER REDUCTIONS DOCKET NO. 50-333                 ,
UNrr N AME    North Anna Unit #1 DA TE ll-5-79 COMPLETED BY       'A   r> _ >>,disqn REPORT MONTII June 1979 (Revised)
TELEP!iONE -GP.S)394-5151
TELEP!iONE -GP.S)394-5151
~--I__;'b 21"i Lkemee Et h Cause & Correct e.e
                                                            ~
~N. , Da'e 2.55[$E4 I ert-i -3 b~i A,t:m to C g y]g.Repe.t -nC'+_E Prewnt Returrence
                                                              -
-e 6 79-12 THIS P!:RIOD OF SIG'iIFICANT POWER REDUCTION WAS CONC UDED ON C-l-79 AT 2135, WHEN"C" f4AIN FEEDPU 4P WAS RETUR.
                                                                                            -
;ED TO NCRtGL SERVICi.g 6 9 4 9 Ei'e)G 9 2?'P)., M w , W4 hied b-tra i 3 4 F: Ferced Reason: Methoti: Exhibit G -Instructions S: Scheau!:d A Equipment Failure (Explain) 1 -Manual for Preparation of Data B-Maintenance ci Test 2-Manual Scram.
I              __
Entn Sheets fer Licen ce N C.Refuelinu 3 Automatie Scram.
                                        ~
Ese:it Report (LI:R) FCe t NU RI.G-C'D Regu!atJry Restriction 4-Other ( Explain)
                                            ;       'b 21"i         Lkemee     Et         h         Cause & Correct e.e N. ,         Da'e       2. 55             [ $E4           I ert   -i -3       b~i           A,t:m to C       _E  g         y ]g.         Repe.t -   nC           '+     Prewnt Returrence
O!61)E-Operator Training & License Exainination F- Ad minist ra t i .e 5 G-Operational Error p xp!dn)
                                                        -     e 6
Exhibit ! - Same Source N'77)I!-Ot her ( Esplain)
79-12         THIS P!:RIOD OF SIG'iIFICANT POWER REDUCTION WAS CONC UDED ON C- l-79 AT 2135, WHEN "C" f4AIN FEEDPU 4P WAS RETUR. ;ED TO NCRtGL SERVICi.                                               g 6   9 4   9 Ei'e)
*See Attached Sheet.
G   9 2?'P)
Page 1 of 1 U:!IT SiluTDOWil AtID POUER REDUCTIOlS EXPLAi!ATION S!EET DOCKET li0.
                                                                                                                            .     ,
50-338 REPORT !!0Nili June (Revisty[) UNIT FLAME !! orth Anna #1 l979 11-5-79 YEAR DATE COMPLETED BY W. R. IMDIS0tl 79-12 (A)liigh bearing temperature en"C" cain feedpump required a reduction in megawatt load when the feedpump was removed from service.
M w     ,
\)0]-: i e}}
W4 hied b
-
tra i                                                                         3                     4 F: Ferced             Reason:                                           Methoti:               Exhibit G -Instructions S: Scheau!:d         A Equipment Failure (Explain)                     1 -Manual               for Preparation of Data B-Maintenance ci Test                             2-Manual Scram.         Entn Sheets fer Licen ce N                           C.Refuelinu                                       3 Automatie Scram.     Ese:it Report (LI:R) FCe t NU RI.G-C'                           D Regu!atJry Restriction                         4-Other ( Explain)     O!61)
E-Operator Training & License Exainination F- Ad minist ra t i .e                                               5 G-Operational Error p xp!dn)                                             Exhibit ! - Same Source N'77)                     I!-Ot her ( Esplain)
              *See Attached Sheet.
 
Page     1   of     1 U:!IT SiluTDOWil AtID POUER REDUCTIOlS EXPLAi!ATION S!EET             DOCKET li0. 50-338 REPORT !!0Nili June (Revisty[) UNIT FLAME !! orth Anna #1 YEAR l979           DATE 11-5-79 COMPLETED BY     W. R. IMDIS0tl 79-12 (A) liigh bearing temperature en "C" cain feedpump required a reduction in megawatt load when the feedpump was removed from service.
                              \)0]       -
:
i e}}

Revision as of 13:39, 19 October 2019

Revised Monthly Operating Rept for June 1979
ML19210D147
Person / Time
Site: North Anna Dominion icon.png
Issue date: 11/05/1979
From: Wil Madison
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML19210D121 List:
References
NUDOCS 7911200586
Download: ML19210D147 (4)


Text

..

.

.

VIRGIflIA ELECTRIC AND P0'.lER COMPAtlY i;0RTH AtlNA POWER STATI0ft P0llTHLY OPERATIt!G REPORT P.0fiTH June YEAR 1979 (Revised 11-05-79) t

.

SUBMITTED:

  • %~'Q, bN csp.,

SUPERINTEll0Elli - OPERATIOilS APPROVED:

/k i4ANAGER J 1367 .324 2911200 5 6 6

OPERATING DATA REPORT DOCKET NO.

50-338 DATE M .E.*L%.

COMPLETED fly JL.JL !htyson TELEPl!ONE (_W)@g4.-5151 OPERATING STATUS florth Anna, Unit 1 Notes

1. Unit N>r.w:
2. Reporting Period: dune 1979 (Revised)
3. Licenud Thermal Power (MWr): 2775
4. Nameptate R2tiag (Gron 51We): 947
5. Design Elearical Rating (Net SIWE): 90/
6. Maximum Dependab!e Capacity (Gross SIWE): 928
7. 51aximura Dependable Capacity (Net MWe): 898
8. If Chanps Occur in Capacity Ra.ings (Items Number 3 Throu th 7) Since Last Report, Give Reasons:

fl/A

9. Power Lev 4 To Which Restricted,if Any (Net MWe): NE
10. Reasons Fue Restrictions,if Any:

h ,

_

. _ - .

. .

..

This Month __ Yr.-to-Date Cumulative 11, ilours In Reporting Period 20

.,

4,343 9,360

12. Number Of floors Reactor W.n Critical 720- 3.103 9 n/.s._
13. Reactor Rmrve Shutdown Hours 0 48.7 1/5.5..

L

14. Ilours Ger:erator On.Line 720 3,331.3 7,983
15. Unit Rexne Shutdown itour, 0 0 0
16. Gruu The mal Enegy Genented IMWii) 1,945,847 _8.29]faR95 21.113 490
17. Gron Elec:rical Energy Generate 1(MWH) 617 1457 2d46,527 _6 7.16d6L__

IS. Net Electried Energy Generated (Mhlf) 583 847 2,684.,7/8 L 6.349.3.2& _

19. Unit Service Factor 100 76.7 8 52 3._,
20. Unit Asailability Factor 100 76.7 85.3
21. Unit Capacity Factor (U. sing MDC Net) 90.3 68.8 7.5,5_
22. Unit Capacity Factor (Using DER Net) 89.4 68.1 7ML
23. Unit ForcM Outage Rate 0 7.5 4.1

'

24. Shutdowm Scheduled Over Next 6 Months (Type. Date.and Duration of Eacht Refueling; September, October and flovember; 11 Weeks

..

25. If Shut Down At End Of Report Penod. Estimated Date of Startup: II/A
26. Units In Test Status (Prior to Commercial Operation): Foreca >r Achieved

.

INITIA L CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1367 525 mm

UNIT SliUIDOWNS AND POWER REDUCTIONS DOCKET NO. 50-333 ,

UNrr N AME North Anna Unit #1 DA TE ll-5-79 COMPLETED BY 'A r> _ >>,disqn REPORT MONTII June 1979 (Revised)

TELEP!iONE -GP.S)394-5151

~

-

-

I __

~

'b 21"i Lkemee Et h Cause & Correct e.e N. , Da'e 2. 55 [ $E4 I ert -i -3 b~i A,t
m to C _E g y ]g. Repe.t - nC '+ Prewnt Returrence

- e 6

79-12 THIS P!:RIOD OF SIG'iIFICANT POWER REDUCTION WAS CONC UDED ON C- l-79 AT 2135, WHEN "C" f4AIN FEEDPU 4P WAS RETUR. ;ED TO NCRtGL SERVICi. g 6 9 4 9 Ei'e)

G 9 2?'P)

. ,

M w ,

W4 hied b

-

tra i 3 4 F: Ferced Reason: Methoti: Exhibit G -Instructions S: Scheau!:d A Equipment Failure (Explain) 1 -Manual for Preparation of Data B-Maintenance ci Test 2-Manual Scram. Entn Sheets fer Licen ce N C.Refuelinu 3 Automatie Scram. Ese:it Report (LI:R) FCe t NU RI.G-C' D Regu!atJry Restriction 4-Other ( Explain) O!61)

E-Operator Training & License Exainination F- Ad minist ra t i .e 5 G-Operational Error p xp!dn) Exhibit ! - Same Source N'77) I!-Ot her ( Esplain)

  • See Attached Sheet.

Page 1 of 1 U:!IT SiluTDOWil AtID POUER REDUCTIOlS EXPLAi!ATION S!EET DOCKET li0. 50-338 REPORT !!0Nili June (Revisty[) UNIT FLAME !! orth Anna #1 YEAR l979 DATE 11-5-79 COMPLETED BY W. R. IMDIS0tl 79-12 (A) liigh bearing temperature en "C" cain feedpump required a reduction in megawatt load when the feedpump was removed from service.