ML20214F446

From kanterella
Jump to navigation Jump to search
Final Response to FOIA Request.App C Documents Available in Pdr.Forwards App D Documents Re Seabrook Probabilistic Safety Study.Addl Records Available in PDR in Folder FOIA-87-10.Records Referred to Another Agency for Review
ML20214F446
Person / Time
Site: Indian Point, Seabrook, Zion, 05000000, 05000470, 05000668
Issue date: 05/15/1987
From: Grimsley D
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
To: Sholly S
MHB TECHNICAL ASSOCIATES
Shared Package
ML20213E815 List:
References
FOIA-87-6, REF-GTECI-A-29, REF-GTECI-SA NUDOCS 8705260094
Download: ML20214F446 (5)


Text

,.

f "%,

k 4 r Fox.4 -S1-co 6 WESPONSE TYPE f,a l RESPONSE TO FREEDOM UF h XI *^' II P^"^'

  • c,t{ff INFORMATION ACT (FOIA) REQUEST

^

MAY l 51987 DOCKET NUM8ER(Ss (# eppacsom

..EOUE3 TEA PART I.-REf.hRDS RELEASED OR NOT LOCATED (See checked boxes)

No agency records subset to the request have been located.

No alditional agency records sub lect to the request have been located.

Agency records Abtect to the request that are identified m Appendix 1717 H Street, N W., Washmgton, DC. 4

_b are already available for public inspecten and copy 6ng in the NRC Pubhc Document Room, Agency records subject to the request that are identifeed in Appendix _ M are being made available for public mspecten and copying in the NRC Public Docurnent Room,1717 H Street, N W , Washmgton, DC. in e folder under this FOlA number and requester name. .)(r The nonproprietary version of the proposaus) that you agreed to accept m a telephone conversation with a member of my staff a now being made ava3able for pubhc mspecten tnd coymg at the NRC Pubhc Docurr'ent Room,1717 H Street, N W , Washington, DC, in a fonder under thrs FOIA number and requester name.

Enclosed as information on how you enay obtam access to and the charges for copying records placed in the NRC Pubhc Document Room,1717 H Street, N.W., Washmgton, DC.

AgIncy records hbsect to the request are enclosed. Any apphcable charge for copies of the records provided and paymer*t proce1ures are noted in the comments section.

Rwords subrect to the request have been referred to another Federal agencylees) for review and direct response to you in vsw of NRC's response to this request, no further action is beeng taken on appeal letter dated PART ll.A-INFORMATION WITHHELD FROM PUBLIC DISCLOSURE Cartan eformat.3n m the requested records e be ry,) withheld from pubhc disclosure pursuant to the FOlA exemptons described m and for the reasons stated in Part 11, sec-tions B. C. and D Any released portions of the documents for which only part of the record is being withheld are being made available for public inspection and copyie-J in the NRC Pubhc Document Room,1717 H Street. N W., Washington, DC. m a folder under th.s FOf A number and requester name Comments

  • wh uiQ m hch w&u h a Rt. PuMi, M Ro+,n C P D R h , 1 ~711 H Ms w4% , O. c, . l~ FoI 4 / o se A -

-q P

l l

l

- l l } /

GNatua) O utctoup bon org.nt s Au sf cons

, i , ,.

ddLW 7 _ _ _ _ _ _ .

8705260094 PDR FOIA 870515 SHOLLYB7-6 PDR NRC FORM 464 Pe 9 ik

Rm: F0IA-87-006 4- APPENDIX C RECORDS MAINTXTRE DUENG PDR FILES DATE PDR No. DESCRIPTION

1. 8/24/84 8409050113 Memo from Bernero to Speis - Seabrook
2. 1/30/85 8502070262XA Memo from Speis to Eisenhut - Seabrook PSA
3. 1/30/85 8610220339 Khatib-Rahbar " Preliminary Review and Evaluation...."
4. 2/27/85 8503110134XA Memo from Speis to Thompson - Seabrook PSA i
5. 4/10/85 8504240340 Memo from J.Hulman to Sheron - Seabrook 4
6. 9/13/85 8610220363 BNL letter from Khatib-Rahbar to Lyon pertaining to Seabrook.
7. 9/19/85 8509260027 Letter from Knighton to Harrison enclosing a BNL evaluation
8. 10/4/85 8510210206 Memo from Speis to Bernero - Seabrook
9. 8/19/86 8609230123 Memo from Lyon to Berlinger, Draft NRC memo
10. 9/29/86 8610090151 From Thomas to VNoonan, PSNH, SBN-1207 f 11. 10/21/86 8610300356 Memo from C.Berlinger to V. Nerres (filed in PDR Under F01A-87-07)
12. 9/29/86 8610090151 Memo from C. Thomas to V. Noonan, SBN-1207 i
13. 10/31/86 8611050225 Ltr from DeVincentis to Long, response to

! request for additional info, SBN-1225

> 14. 11/17/86 8611190171 Ltr from DeVincentis to Long, response to I request for additional information, PSNH, l

SBH-1234

15. 12/8/86 8612110095 Memo from Rossi to Noonan transmitting draft report on Steam generator tube rupture
16. 12/8/86 8612170289 Ltr from Nerses to Harrison transmitting BNL letter to Bagchi transmitting report dated 12/5/86
17. 12/31/86 8701060024 Memo from Benaroya to Noonan pertaining to BNL report, which includes document from Khatib-Rahbar to Lyon re: FINA-3778, BNL,

. 11/17/86(accessionNo. 8701060026) i

_. ,. u _ , _ ______ _ _ _. __.

I Re: F01A-87-006 APPENDlX D a

RECORDS MAINTAINED IN THE PDR UNDER THE AB0VE REQUEST NUMBER 1 1. Undated Statement of Work,

Title:

Review of the Probablistic Risk Assessment For the Seabrook Nuclear Power Plant. (6 pages)

2. 3/13/85 Letter from Mohsen Khatib-Rakhar to Warren Lyon with enclosure list of questions. (2 pages) i

. 3. 4/10/85 Memo from L.G. Hulman to Brian Sheron, subject: Review of Seabrook Probalistic Safety Study. (1 page) l l 4. 9/85 Draft BNL Report and Coments Seabrook (with handwritten coments that were requested by NRC/BNL in the PSA meeting).

(70pages) l 5. 12/8/86 Ltr from T.G. Theofanous to T. Speis, re: High Pressure-Scenario, etc., with attached letter re: Depressurized SystemforPWRs.(3pages) 4 4 6. 12/11/86 Lir from T.G. Theofanous to T. Speis, re: High Pressure 1

Scenario, etc., with attached letter re: Depressurized -

{

SystemforPWRs.(3pages)

7. 12/31/86 Memo from Victor Benaroya to Vincent Noonan, subject: .i Amendment for BNL Report "A Review of the Seabrook PSA:

containment Modes and Radiological Source Terms",

PRA;NUREG/CR-4540. (5pages) i  !

i 8. Various Material reproduced from Fin: A-3778 Contract File for Dates Seabrook PRA Work:

l Memo from Robert Bernero to Jesse Funches, a) 8/6/85 i

subject: Request to Reprogram Funds. (4 pages)

b) Technical Assistance Program Support System Project Identification Sumary (PIDS) as of 8/6/84. (2 pages)
c) 8/21/84, DOE Source Selection Justification (1 page) 4 d) 5/8/84 Office of Nuclear Reactor Regulation a

ProjectIdentificationSummary(PIDS).(2pages) ,

l

- e) 9/19/85 Ltr from Robert M. Bernero to Gregory J.

! Ogeha subject: BNL Technical Assistance

to the Division of Systems Integration, I NRR,NRC " Review of PRA For The Seabrook Nuclear Power Plant," Fin. A-3778. (2pages) 4 I

l

1 s

1 J ,,

Re: F01A-87-006

[.

l APPENDIX D (Continued)

8. (Cont.) f) 9/9/85 NRR Technical Assistance Program (1 page) i g) 8/30/85 Ltr from Robert M. Bernero to Gregory J. I

{ Ogeka. (4pages)  ;

i '

10/22/84 Memo from Robert Bernero to J. Funches,

) h) subject: BNL - Technical Assistance to the <

i

]

Division of System Integration (Office of l j NRR, NRC, NRC Review of PRA for Seabrook  :

Nuclear Power Plant. FIN-a-3778. (2pages) 3 l

i) 10/22/84 Memo from Robert M. Bernero to J. Funches, '

subject: BNL Technical Assistance to the Division of Systems Integration, Office of 1 NRR, NRC " Review of the PRA The Seabrook i Nuclear Power Plant". FIN-a-3778. (1page) h i f) 10/22/84 Memo from Robert Bernero to Gregory J.

Ogeka, subject: BNL Technical Assistance to the Division of System Integration, NRR, NRC " Review of the PRA For The Seabrook t Nuclear Power Plant." FIN-A-3778. (2pages)

( ,

i k) 10/22/84 NRR Technical Assistance Program PPAS Action Summary Sheet. (1page)

1) 9/26/84 Ltr to David Shineller from H.C. Grahm, reference FIN-A-3778. (6pages) j m) 9/5/84 Ltr from Robert Bernero to Gregory Ogeka l

! subject: BNL Technical Assistance to 1 Division of Systems " Integration, NRR,"

l Review of The Probalistic Risk Assessment  !

j forSeabrook(FIN-A-3778). (14 pages) l I

I n) 8/22/84 Memo from Brian W. Sheron to Robert -

Bernero, subject: Advance Funding Request i

1 For Fin No. A-3778, " Review of the l

! Probalistic Risk Assessment for the i SeabrookNuclearPowerPlant.(1page)

NRR Technical Assistance Program PPAS I j o) 8/7/85 Action Summary Sheet. (2pages) l i

p) 6/13/84 Memo from Jesse Funches to Roger Mattson, ,

subject: Redirection of Technical Assistance Funds and Review of New Projects i for DSI's FY 1984 Fin Plan. (9 pages) i i

l  !

Re: F0!A-87-006 APPENDIX D l (Continued) q) 7/29/85 Memo for W. Lyon from K. McGrath subject:

DOE Work Order Expiration noted Re:

FIN No-A-3778. (3 pages) r) Various Memo from Walter Y. Kato to Warren Lyon, l

Dates enclosing monthly reports. (49pages) s) Monthly Highlights on Review of the Prablistic Risk Assessment for the Seabrook Plant. Re l

2/85, 3/85, 5/85 and 6/85. (24 pages) ports for 9/84, t) Various Memo transmittal of paid vouchers for .

Dates services rendered by DOE-NRC. (24pages)

I

! u) Various Office of Nuclear Reactor Regulation Dates Technical Assistance Program Support System, ,

Review and approval of the Monthly DOE Project Costs and Licensee Fee Costs. (66pages) 1 i'

c 1 1

< t i

, . vg

~

l

~

WW&Q TECHNICAL CONSUL T Cate G Bradenbaugh R> chard B. Hubbard 1723 Hamilton Avenue-Surte K Gregory C. Minor San Jose. Catsfornos 9$12$

Phone (408) 266 2716

' ~2.T 24 December 1986 TREEMM OF INFORMN(ON Mr. Donnie H. Grimsley, Director ACI REQUESI Division of Rules and Records Office U.S. of Administration O((*h*h

'A NuclearD.C. Regulatory Commission -

[*[

FOIA Request for Records Related to NRC Staff and Drookhaven National Laboratory Review of Scabrook Related Probabilistic Safety Study and Reports

Dear Mr. Grimsley:

Pursuant to the Freedom of Information Act, please make '

available forD.C.,

Washington, public inspection and copying at the Commission's categories: Public Document Room, records in the following A.

All records in the possession and/or control of the U.S. Nuclear Regulatory Commission which review, critique, comment upon, or otherwise discuss Safety the Seabrook Station Probabilistic Study (PLG-0300, December 1983). This draft or final), NRC Staff memoranda (whether request includes NRC Contractor memoranda, reports, by written andothers.

other documents, and documents l I

B.

All records in the possession and/or control of discuss the scope of work, funding, andthe U.S. Nuc manpower levels and staffing levels)(including man-hour estimates related to the reviews of the Seabrook Station Probabilistic Safety i Study (PLG-0300, December 19 83) performed under NRC contract.

been performed by Lawrence Livermore NationalSuch review ,

and may have been performed by others. Laboratory a f7 OMoo a i5-

...~

Jonnie H. Grimsley 2?

if December 1986 C.

All records in the possession and/or control of the U.S. Nuclear Regulatory Commission which review, critique, comment upon, or otherwise discuss the reviews Safety of the Seabrook Station Probabilistic Study (PLG-0300, December 19 83) performed by Lawrence Livermore National Laboratory and Brookhaven National Laboratory. If reviews of PLG-0300 were performed b all records which review,ycritique, others, comment please provide upon, or otherwise discuss these reviews. This request includes NRC Staff memoranda (whether draf t or final) and documents written by others.

D'.

All records in the possession and/or control of the U.S. Nuclear Regulatory Commission which evaluate the validity of the results and/or which estimate the uncertainty in the results of both the Seabrook Station Probabilistic Safety Study and the reviews thereof by Lawrence Livermore National Laboratory and Brookhaven National Laboratory.

please do not hesitate to contact me atIf there are any questions concer (408) 266-2716. Your prompt attention to this request will be appreciated. If the nature of your document search is such that it appears that the 10-day response time provided for in the NRC's regulations cannot be met, please provide such partial responses as can be for made as documents subject to this request become available release.

Sincerely, C

Steven C. Sholly Associate Consultant