I MONTHLY HIGHLIGHTS FOR JUNE 1985 l
" Review of the Probabilistic Risk Assessment for the Seabrook Nuclear Power Plant" (FIN A-3778) i BNL Principal Investigators:
M. Khatib-Rahbar (FTS 666-2626)
W. T. Pratt (FTS 666-2630)
NRC Project Manager:
W. Lyon (FTS 492-9405), RS Eranch 1.
Scope /
Purpose:
This project is to provide technical support to the Reactor Systems Branch in reviewing the accuracy and completeness of the Seabrook Proba-bilistic Safety Study (SPSS).
BNL will perform a critical review of the plant design and PRA methods supplemented by audit calculations of selec-ted accident sequences to confi rm the validity of the methods and resul ts.
2.
Work Performed During Period:
A meeting was held with the NRC Project Manager during which comments on the previously submitted reports were received and plans for completion of the project were also discussed.
3.
Problems / Delays:
No problem areas.
4.
Summary of Progress to Date/ Milestones:
j See Item 2.
5.
Next Reporting Period:
Comments from the NRC Project Manager will be incorporated into the final report.
8705260457 870515 PDR FOIA SHOLLYO7-6 PDR
/
i F I NANC I AL STATUS JUNE 19CS ACCoutJT T I TLE NRC FIf1 004174 REVIEW OF PR A FOR SEABROOK tJPP A-3778 SUPERVISOR RD PRINCIPAL INVESTIGATOR : PRATT W.
TERMINATION DATE i
08/30/85 CURRENT YEAR MONTH TO DATE I
DIRECT SlAFF EFFORT
+
(S&P b t a t t' Months)
.00 c.53 11 DIRECT bALARIES 0.
35,701.
MATERIAL 4 SERVICES 0.
9.
ADP SUPPORT i 0.
4.
SUBCONTRACTS i D.
O.
TRAVEL EXPENSES 0.
O.
i INDIREC T EXPEtJSEC i
0.
13 930.
3 GENERAL 6 ADMIN.
0.
21.563.
i t-TOTAL COSTS :
0.
71 207.
PERCENTAGE OF AVAIL FUNDS SPEtJT :
96%
(FY 04 Carrvover + FY 85 Funds Received to Dato)
III FUN D ItJG S T AIUS FY 1984 FY 1985 PROJECTED FY 1985 FUNDS FY 1985 FUNDING CARRY 0VER FUtJDING LEVEL REC'D 10 DAT E BAL, NEEDED (S K)
($ K)
($ K)
(S K) 40.
34, 34.
O.
FF:E RECOVCR f COGT GT(.TUS fit';
A-3770 l
l TIILE:
REVIEW OF PRA FOR SEABROOK NPP PERIOD: JUNE 1985 5
5 FTuS TASK / PLANT P Ef:IDD CU.1UL AT J '-
1 i
-A Seabrook Docket 50-443 0.
71,209.
- TOTALE, 0.
71,20'/
l I
i i
i I
i l
l i
1 i
l l
i l
'l
-l
..