I MONTHLY HIGHLIGHTS FOR JUNE 1985 l

" Review of the Probabilistic Risk Assessment for the Seabrook Nuclear Power Plant" (FIN A-3778) i BNL Principal Investigators:

M. Khatib-Rahbar (FTS 666-2626)

W. T. Pratt (FTS 666-2630)

NRC Project Manager:

W. Lyon (FTS 492-9405), RS Eranch 1.

Scope /

Purpose:

This project is to provide technical support to the Reactor Systems Branch in reviewing the accuracy and completeness of the Seabrook Proba-bilistic Safety Study (SPSS).

BNL will perform a critical review of the plant design and PRA methods supplemented by audit calculations of selec-ted accident sequences to confi rm the validity of the methods and resul ts.

2.

Work Performed During Period:

A meeting was held with the NRC Project Manager during which comments on the previously submitted reports were received and plans for completion of the project were also discussed.

3.

Problems / Delays:

No problem areas.

4.

Summary of Progress to Date/ Milestones:

j See Item 2.

5.

Next Reporting Period:

Comments from the NRC Project Manager will be incorporated into the final report.

8705260457 870515 PDR FOIA SHOLLYO7-6 PDR

/

i F I NANC I AL STATUS JUNE 19CS ACCoutJT T I TLE NRC FIf1 004174 REVIEW OF PR A FOR SEABROOK tJPP A-3778 SUPERVISOR RD PRINCIPAL INVESTIGATOR : PRATT W.

TERMINATION DATE i

08/30/85 CURRENT YEAR MONTH TO DATE I

DIRECT SlAFF EFFORT

+

(S&P b t a t t' Months)

.00 c.53 11 DIRECT bALARIES 0.

35,701.

MATERIAL 4 SERVICES 0.

9.

ADP SUPPORT i 0.

4.

SUBCONTRACTS i D.

O.

TRAVEL EXPENSES 0.

O.

i INDIREC T EXPEtJSEC i

0.

13 930.

3 GENERAL 6 ADMIN.

0.

21.563.

i t-TOTAL COSTS :

0.

71 207.

PERCENTAGE OF AVAIL FUNDS SPEtJT :

96%

(FY 04 Carrvover + FY 85 Funds Received to Dato)

III FUN D ItJG S T AIUS FY 1984 FY 1985 PROJECTED FY 1985 FUNDS FY 1985 FUNDING CARRY 0VER FUtJDING LEVEL REC'D 10 DAT E BAL, NEEDED (S K)

($ K)

($ K)

(S K) 40.

34, 34.

O.

FF:E RECOVCR f COGT GT(.TUS fit';

A-3770 l

l TIILE:

REVIEW OF PRA FOR SEABROOK NPP PERIOD: JUNE 1985 5

5 FTuS TASK / PLANT P Ef:IDD CU.1UL AT J '-

1 i

-A Seabrook Docket 50-443 0.

71,209.

TOTALE, 0.

71,20'/

l I

i i

i I

i l

l i

1 i

l l

i l

'l

-l

..