ML20235B266

From kanterella
Jump to navigation Jump to search
Final Response to FOIA Request for Documents Re Tech Specs. Forwards App B Documents.App a & B Documents Also Available in PDR
ML20235B266
Person / Time
Site: Millstone, Dresden, Davis Besse, Mcguire, Nine Mile Point, Perry, Kewaunee, Pilgrim, Vermont Yankee, Callaway, Quad Cities, Zion, FitzPatrick, McGuire, LaSalle, 05000000
Issue date: 07/01/1987
From: Grimsley D
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
To: Williams O
JRA ASSOCIATES
Shared Package
ML16342B348 List: ... further results
References
FOIA-87-121, RTR-NUREG-0737, RTR-NUREG-737, RTR-REGGD-01.016, RTR-REGGD-1.016 NUDOCS 8707090006
Download: ML20235B266 (7)


Text

U.S. NUCLEAR REGULATORY COMMISSION Nac soia atout si Nuvataisi Phbb f aa.4 F01A-87-121 e,

RESPONSE type ly.

f RESPONSE TO FREEDOM OF (l*"^'

I l '^"'A'

\\

/

INFORMATION ACT (FOIA) REQUEST 3

1g DOCKET NUMBERt$i ur opphcebei REQUESTER Ms. Opnelia G. Williams PART l.-RECORDS RELEASED OR NOT LOCATED ISee checked boxest No agency recortb subsect to the request have been located.

No additonal egency records subsect to the request have been located.

Agency records subrect to the request that are identsfed in Appende, A

are si,eady evenabie fo, pubi,c inspect n and copying in tne NRC Pubhc Document Room, X

1717 H Street, N W,, Weshington, DC.

Agency records subsect to the request that are identifed in Appendia 8

are being made available for pubhc enspecten and copying in the NRC Public Document X

Room, i7iv H Street. N w., Washington, DC, in a folder under this FOIA number and requester name.

The nonproprotary version of the proposaltsi that you egreed to accept in a telephone conversation with a member of tr'y staff is now being mode available for pubhc inspection end coying at the NRC Public Document Room,1717 H Street, N W, Washington, DC, en a folder under this FOlA number and requester name.

Enclosed is informstion on how you may obtam access to and the charges for copying records placed in the NRC Pubhc Document Room,1717 H 3treet. N W., Washington, DC.

Agency records subject to the request are enclosed. Any applicable charge for ccpies of the records provided and payrrent procedures are noted in the comments section.

Records subject to the request have been referred to ariother Federal egencybes) for review and direct response to you.

In view of NRC's response to the request, no further action is being taken on appeal letter dated PART ll.A-lNFORMATION WITHHELD FROM PUBUC DISCLOSURE Certain informaton in the requested records is being withheld from pubhc disclosure pursuant to the FOfA exemptons described in and for the reasons stated in Part it, sec-tons B, C, and D. Any released portions of the documents for which only part of the record a being withheld are being made available for public inspection and copying in tha NRC Public Document Room 1717 H Street, N W., Washington, DC, in a folder under the FOIA number and requester name-Comments Since your request involved 38k hours of search time instead of 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br />, you will receive a reimbursement check in the amount of $21.00.

)

it$ ^~o asconos a u*t omsetoa./oivsioN or si

/

~

I;

'870709000/> 870701' PDR FOIA WILLIAMG7-121 PDR NIC FOZM 464 (Part b

$ e6s J

Appendix A FOIA 87-121 DOCUMENTS ALREADY IN THE PDR Date Description 1.

08/16/82 Memo D. G. Eisenhut to Regional Administrators re:

- Proposed Guidance for Calibration and Surveillance Requirements for Equipment Provided to Meet Item II.F.1, Attachments 1, 2 and 3.NUREG 0737 ACCESSION NO. 8209270140 2.

11/13/85 Memo R. L. Baer to C. J. Paperiello re:

Effluent

- Radiation Monitor Calibrations ACCESSION NO. 8511180296 1

A

Appendix B FOI A 87-121 DOCUMENTS BEING PLACED IN THE P3R Date Description 1.

04/29/77 Memo J. H. Sniezek to Multiple Aodressees re: Minimum Shift Crew Composition w/ enclosures (4 pages) 2.

06/08/77 Memo F. J. Nolan to R. C. Knop re:

Intent of Technical Specification (TS) Requirement Relating to APRM Flux Trip at Quad Cities - Memorandum dated 5/2S/77, Docket No. 50-294 (1 page) 3.

09/08/77 Memo F. J. Nolan to A. B. Davis re: Voluntary Entry i

into Technical Specification Action Statements (F14482H1) i (F14S29H2) w/ enclosures (7 pages) i 4.

12/12/77 Memo F. J. Nolan to Multiple Addressees re: Technical Specifications for Minimum Critical Fower Ratio (MCPR) i w/ enclosures (3 pages)

{

5.

08/14/80 Memo R. L. Spessard to E. L. Jordan re: Testing Requirements for Standby Gas Treatment Systems (SGTS)

(AITS F03096680) w/ enclosure (2 pages) 6.

08/27/80 Memo R. F. Heishman to All Members - Reactor Operations and Nuclear Support Branch re:

Position on " Licensed Powu Level" w/ enclosure (3 pages) 7.

10/02/80 Memo J. F. Streeter to E. L. Jordan re: Possible Design Deficiency in LaSalle Emergency Diesel Generator Air Starting) Systems (AITS - F03110380) w/ attachment (3 pages 8.

04/16/81 Memo E. B. Blackwood to F. Reimann re: BWR 5/6 Control Rod Drive Scram Testing (AITS F03001881) (2 pages) 9.

08/18/81 Memo R. L. Baer to R. L. Spessard re: Testing of Standby Gas Treatment S F03096680H07) (2 pages)ystems at LaSalle (AITS 10.

01/18/82 Memo R. L. Baer to Multiple Addressees re: Clarification of Provisions of Appendix J in 10 CFR 50 w/ enclosures (4 pages)

11. 05/21/82 Memo to File re:

Operability of Containment Isolation Valves (2 pages)

l 1

Appendix B (cont'd)

F01A 87-121 00CUtiENTS BEING PLACED IN THE PDR Date Description 12.-

10/14/82 Memo re:

TIA 82-53 Equipment Qualification Requirements for NUREG-0737 Items (2 pages) 13.

01/03/83 Memo D. G. Eisenhut to C. E. Norelius re:

TIA 82-37, Testing of Nonnally Closed Check Valves w/ attachments (4pages)

14. 01/12/83 Memo D. G. Eisenhut to R. Spessard re: Stopwatches Calibration and ASME Requirements on Transients Analyses (2pages) 4 15.

01/28/83 Memo C. E. Norelius to D. G. Eisenhut re: Request for Technical Assistance - Clarification of LaSalle 1 Technical Specification 3.8.1.2, Action a. (1 page)

16. 01/31/83 Memo C. E. Norelius to'D. G. Eisenhut re: Request for Technical Assistance - NRR Position on When an Action Statement is Entered as a Consequence of Failure to Perform Surveillance Tests (1 page) 17.

02/09/83 Memo C. E. Norelius to D. G. Eisenhut re: Request for Technical Assistance - NRR Position on Shutdown Time Allowances When an LCO is Not Met (2 pages)

18. 02/16/83 Memo C. E. Norelius to D. G. Eisenhut re: Request for Technical Assistance - Technical Specification Interpretation (AITS F03008283) w/ attachment (5 pages) 19.

03/11/83 Memo D. G. Eisenhut to C. E. Norelius re: NRR Position of When an Action Statement is Entered as a Conse of failure to Perform Surveillance Tests (1 page)quence

20. 03/22/83 Memo D. G. Eisenhut to C. E. Norelius re: Clarification of LaSalle 1 Technical Specification 3.8.1.2, Action a.

(2 pages)

21. 03/23/83 Memo D. 6. Eisenhut to C. E. Norelius re: NRR Position on Shutdown Time Allowances When an LC0 is Not Met (2pages)
22. 03/29/83 Memo R. L. Spessard to J. M. Taylor re: Quality Assurance Audits to Verify Confonnance to Technical Specification Provisions (2 pages)

I 2

Appendix B' (cont'd)

F01A 87-121 DOCUME!1TS Belt 1G PLACED IN THE PDR Date Description

23. 04/01/83 Memo C. E. Norelius to D. G. Eisenhut re: Transfer of Responsibility - Containment Vessel Welds not in Strict Compliance with FSAR Comitments - Perry Nuclear Power Plant, Units 1 and 2 (2 pages) 24 04/20/83 Memo D. G. Eisenhut to C. E. Norelius re: NRR Position on Component Operability when a Diesel Generator is Inoperable (2pages) 25.

04/22/83 Memo D. G. Eisenhut to C. E. Norelius re: Containment Cooling System Operability for the Kewaunee Nuclear Power Plant w/ enclosures (9 pages)

26. 05/02/83 Memo C. E. Norelius to D. G. Eisenhut re:

Request for Technical Assistance to Delineate Appropriate Licensee Actions Following Failure of Certain ECCS/ Containment Isolation Valves (4 pages)

27. 06/29/E3 Memo D. G. Eisenhut to C. E. Norelius re: Technical Assistance to Delineate Appropriate Licensee Actions Following Failure of Certain ECCS/ Containment Isolation Valves (4 pages)
28. 07/14/83 Memo C. E. Norelius to D. G. Eisenhut re: Zion Technical Specifications (1 page) 25.

10/07/83 Memo D. G. Eisenhut to C. E. Norelius re: Containment Vessel Welds not in Strict Compliance with FSAR Commitments - Perry Nuclear Power Plant (Units 1 & 2) w/ attachment (10 pages) 30.

10/21/83 Memo C. E. Norelius ta D. G. Eisenhut re: Request for Technical Assistant-NRR Position on Technical Specifications Interpretation-Primary Containment Allowable Leakage Rates w/ attachment (2 pages) 31.

10/28/83 Memo D. G. Eisenhut to C. E. Norelius re: Clarification of the Tenn " Deputy Plant Manager" as Used in Generic Letter 82-12 w/ enclosure (4 pages)

32. 01/30/84 Memo J. G. Partlow to R. L. Spessard re: Quality Assurance Audits to Verify Confonnance to Technical Specifications Provisions (1 page) i 3

Appendix B (cont'd)

FOIA 87-121 DOCUMENTS BElflG PLACED IN THE 3DR Date Description

33. 02/84 Memo R. L. Spessard to C. E. Noreliu re: Testing Requirements of Containment Airlocks at Kewaunee -

Technical Assistance (F03067783) w/ attachment (3 pages) 34.

03/20/84 Memo C. E. Norelius to D. 3. Eisenhut re:

Request for Assistance - Correction /Clarificaticr of a Technical Specification Discrepancy w/ enclosures (6 pages) 35.

03/30/84 Memo C. J. Paperiello to F. Pagano re:

Interpretation of Paragraph 50.72(b)(1)(v) of 10 CFF Part 50 (F003007984) w/ enclosure (3 pages) 36.

04/04/84 Memo D. G. Eisenhut to C. E. Norelius re:

Technical Assistance to Establish a Staff Position on a Technical Specifications Interpretations on Prirary Containment Allowable Leakage Rates (TIA-83-102) (3 pages) 37.

05/30/84 Memo D. G. Eisenhut to C. E. Norelius re:

NRR Technical Assistance - Interpretation of Technical Specifications Applicable to Vital Buses Powered Fror Non-Class IE Power Source (Davis-Besse) w/ enclosure (3 pages) 38.

06/21/84 Memo R. C. DeYoung to Multiple Addressees re:

Release of IE Inspection Manual to Licensees and the Public w/ enclosure (4 pages) 39.

01/10/85 Memo R. C. DeYoung to Multiple Addressees re:

Notifications to the NRC Operations Center and Repcrting Events in Licensee Event Reports (3 pages) 40.

04/18/85 Memo H. L. Thompson to R. L. Spessard re: Closure Verification of Normally Closed Check Valves During Preoperation Testing at Callaway (TIA 83-117) w/ enclosure (3 pages) 41.

07/08/85 Memo D. M. Crutchfield to Distribution re: Technical Specification Operability Requirements w/ enclosure (7pages)

42. 07/15/85 Memo H. R. Denton/J. M. Taylor to Multiple Addressees Relief from Technical Specification LCOs (2 pages) re:

i 43.

11/22/85 Memo H. L. Thompson to Multiple Addressees re:

Technical Specification Interpretation (2 pages) 4

Appendix B (cont'd)

FOIA 87-121 DOCU:4EtiTS BEI:lG PLACED 1:4 THE PDR Date Description 44.

12/04/85 Memo E. L. Jordan to W. T. Russell re: Recommended Technical Specification Change Concerning the loss of Control Room Cooling (2 pages) 45.

04/28/86

' Memo J. A. Hind to H. L. Thompson, Jr., re:

Request for Technical Assistance Regarding Post-Accident Noble Gas Effluent Monitorin w/ attachment (2 pages)g Systems at Callaway 46.

05/27/86 Memo H. R. Denton to C. E. Norelius re:

Technical Specification Interpretation on Snubbers (3 pages) 47.

09/09/86 Memo C. E. Norelius to G. M. Holahan re:

Request for Technical Assistance - Additional Clarification of Snubber Technical Specification Requirements (3 pages)

48. 02/10/87 Memo H. R. Denton to Multiple Addressees re:

Interim Comission Policy on Technical Specifications w/ enclosure (18 pages) 49.

Undated Memo D. G. Eisenbut to C. E. Norelius re: LaSalle Unit 1 - Fast Cold Starts of Die,el Generators (1 page) 5