| CON-FIN-A-1301, CON-FIN-A-2317, CON-FIN-A-3708, CON-FIN-A-3711, CON-FIN-A-3719, CON-FIN-A-3750, CON-FIN-A-3772, CON-FIN-A-6457, CON-FIN-A-6496, CON-FIN-A-6801, CON-FIN-A-7281, CON-FIN-B-2534, CON-FIN-B-2537, CON-FIN-B-2538, CON-FIN-B-2543, CON-FIN-B-2951, CON-FIN-B-2961, CON-FIN-B-8625, CON-FIN-B-8634, CON-FIN-B-8665, CON-FIN-B-8681, CON-FIN-B-8682, CON-FIN-B-8696, CON-FIN-N-3008, CON-FIN-N-3031, FOIA-87-6 NUDOCS 8405260445 | |
| Download: ML20213E811 (5) | |
Text
'
l gggy3 gyavs:2 E
NUCLEAR REGULATORYEOMMISSION h
- E WASHINGTON. D. C. 20555
'+,..'...#'
NAY 14M MEMORANDUM FDR: Jesse N. Funches Director Progratr. and Planning Analysis Staff, NRR FRDM:
Roger J. Mattson, Director Division of Systems Jntegration
SUBJECT:
REQUEST FOR REALLOCATIDN DF7ECHNICAL ASSISTANCE FUNDS AND APPROVAL DF NEW-fROJECTS DSI conducted a inid-year resources review on April 30. 1984. As a result I have identified a few high-priority new projects for which I would like to initiate work in FY 1984. Project Identification Sumaries (PIDS) are attached. These proje::ts are:
1.
Evaluation of Licensee Confonnance to Beneric Letter 83-28 (Salem ATWS) (Two FINS) 2.
Review of J.icensee Submittals on BWR Primary System Pipe Cracks 3.
Review of the PRA for Seabrook n
=
4.
User's Guide for-PARTS Lomputcr ringram 5.
Clima+ ology of Extreme Winds in Scuthern California.x 6.
Tornado Climatology
)
I have also agreed to several inodifications to existing contracts as noted on the attached list. However'caupled with the increased new work, I am proposing to delay funding commitments on other projects where there have been contract delays or other problems which would cause excess carryover.
l As a result of these changes, DSI can return to the NRR Reserve Fund 561,000.
I would appreciate your prompt action on this request so that the contract actions can be initiated prior to June 1.
)
Roger. Mattson, Dire tor
..D1vLsion Df Systensintegration cc:
L. Solander D. Heyer C. Velez R. Swisher T. DiGalorra Kk 9
n5 m
Y FY84Repbhamming/ Redirection t,,
dperatina Reactors l FIN AM00NT TITLE REMARKS (S K) y B2951
-0*.
Utilization bf COBREE Computer Code
$10K additional required to 1
\\
complete two submittals in accordance with proposal; add two additional sub-
_s cittals for which reviews requested by EQB NEW
+55 Evaluation of License Conformance Ihitiate work on three to Generic Letter 83-28 (Salem ATWS)
MPA's; timing of work of work not known at time NRR FY 84 Operating Plan established NEW
+40 0
Review of Licensee Submittals on Initiate work on MPA; timin (B2538)e
~4 BWR Primary System Pips Cracks of work not known at time NRR FY 84 Operating Plan established s
B2534
+5.
'B&W Lynxt Computer Review Original budget under-estimated; additional funds g
required for proposal NEB
,+60 Review of Process Control Programs Late contract start require
't less FY 84 funds;ignated in note that $85K was' des Reserve Fund for this project BB695./
-2 Rad Consequences: Evaluation Funds were excess after SGTR Accidents proposal negotiated N3008 /
-6*
Tornado Missile PRAs for ors OR submittal not received as anticipated A6801 '
-100 Review Test Procedures for Contract fu..ded through DL Charcoal Adsorbers (Note: $25K previously redirectedtoB2325)
B8681
-65 Atmospheric Diffusion Modelling Delayed contract start; als !
for ERFs IE delay in scheduling OR appraisals (only three scheduled this FY)
B2961
+18 Climatology of Extreme Winds ir.
Provide basis for staff (NEW)
Southern. California assessments on operating plants such as San Onofre 1.
i Summary Funds Needed:
$178 Funds Available: $173K F9nds Needed from Reserve
$ SK x
ONote:
$19V,previouslyreRre{.edfromN3008toB2951
\\
i L3I Request for Mid-Year FY 84 Reprogramming / Redirection
, Casework FIN AMOUNT TITLE REMARKS N3631
+30 Tornado Missile PRAs for OL Additional submittal Applicants received (Seabrook); review must be complete 9/84 B2543
+10 Utilization of COBREE Computer EpBadvises4-5 additional Code submittals anticipated this year; budget sufficier for 4, of which 2 already performed NEW
+15 Evaluation of Applicant Conformance See comments under Operatir to Generic Letter 83-28 (Salem ATWS)
Reactors A6496
+40 Radwaste Volume Reduction and To initiate work on two Solidification Topical Reports additional topicals not previously anticipated (Note: Increase in topicals is due to limitations on LLW at burial grounds) j 12537
+10 Meteorological Data Tape and Computer Add additional task to Code Support modify code to enable staff to run on Data General MV8000 B8682
- 5 v' Atmospheric Diffusion Modelling Delay in contract; work to for ERFs-be scheduled for FY 85 A2317
-50 d Radiological Assessment for NRC EIS Contractor loss of staff; stop work order issued.
Work to be perfomed with PSY.
A3719
-30 '
Generic Containment Analyses Another project (FIN A3747) has excess carryover, will transfer $30K funds to A3719, thus this budget not required A3772
-25 Review of PRA for Shoreham Funds were available by transferring from A3705 above (Note: Total estimate cost of A37.72 is $80K)
NEW
+50 Review of PRA for Seabrook Work not previously anticip ed for FY 84 when Operating Plan / Fin Plan approved
\\
l
.2 l
Casework (Con't)
FIN AMOUNT TITLE REMARKS A1301
' 25 Review of Grand Gulf Hydrogen Not likely that applicant Igniter submittal will be available before late FY; sufficient funds already obligated A6457
-60 Control of Heavy Loads Submittals delayed; contrac will extend to FY 85; sufficient carryover with already obligated funds A3711 Safety Evaluation Core-Melt for Contract to be modified to GESSAR/ Limerick enable BNL to QA GESSAR run by using Battelle Columbus
~
(RES) Codes; $65,000 estimated funds required, however, will be funded by transferring from A3705 already obligated. (A3705) is Westinghouse SP/90 which is delayed).
Suranary Funds Needed:
$155 Funds Available 195
.' Return to Reserve 40K Fund:
i
..y o n.....
FY 84 Reprogramming /Redir:ction
'[
Sa_fety Technology EIN AMOUNT TITLE REMARKS B8625
+50 LWR Severe Accident Consequences Contractor is ahead of for LWRs schedule and performing work not previously anticipated until FY 85 B8634
+10 Severe Accident Core / Vessel /Contain-To modify contract to ment Interactions support DST.
(See T. Speis
+tS % )
FIN N4012 memo dated 4/16/84 to
?
R.,Mattson)
A3750
+20 Mitigation Features for Risk Restore funding previously Analyses for Mark II BWRs redirected to A7272 A7281
-20 /
Steam Generator Tube Rupture Late contract start due to Study delay in FIN Plan approval A3708
-75' Evaluation of Occupatio'nal Dose Work planned for this year Reduction Actions cannot begin until 8/84 since pace of current work is slow due to difficulties in scheduling plant visits B8665
-91 e Documentation & Maintenance of AEB Agreement with TIDC to Codes have work performed by their contractor.
NEW
-50 Containment Performance Guidelines Delay in approval of TAP has caused late start of effort; current estimate of 7/1/84 to initiate contract NEW
+40 User's Gu'ide for PARTS Computer One of a series of codes Program (LATAP) that are available publicly; such a guide will be of benefit to staf; in evaluating licensing actions A3767
+75 Evaluating Methods for Reducing DSI recomends authorizing Vulnerability to Sabotoage (A-29)
PNL proposal (for which i
funds are available) but believes BNL proposal for a portion of effort has merit as well.
B2960
+15 Tornado Climatology Update R.G. 1.76 and WASH-1300 to incorporate i
new and additional in-formation on tornado occurrences and tornado characteristics.
1 Sumary Funds Needed:
$210K Funds Available:
236K Return to Reserve 26K