Review of PRA for Seabrook Nuclear Power Plant, Monthly Highlights for Nov 1985
ML20214G068
Person / Time
Site: Seabrook, 05000000
Issue date: 12/18/1985
From: Kato W
BROOKHAVEN NATIONAL LABORATORY
To: Lyon W
Office of Nuclear Reactor Regulation
Shared Package
ML20213E815 List:
References
CON-FIN-A-3778, FOIA-87-6 NUDOCS 8705260403
Download: ML20214G068 (4)


Text

_ _______ _

i i

) '. )

BROOKHAVEN NATIONAL LABORATORY

{: Q g ASSOCIATED UNIVERSITIES. INC.

Upton. Long Island. New York 11973 (516)282s Departmentof NuclearEnergy FTS 666' 2444 Decembe:r 18, 1985 Mr. Warren Lyon Reactor Systems Branch e-Division of Systems Integration

~j]

D Office of Nuclear Reactor Regulation Mail Stop P-1132 U. S. Nuclear Regulatory Comission Washington, D. C.

20555

Dear Mr. Lyon:

Enclosed is the November monthly report for the activities sponsored by your Branch. Also included are the computerized budget sumaries and the fee recovery cost status for each program.

I would suggest that you and,,our staf f review the reports to determine whet:'er there are any discrept ncies.

If there are, please notify the principal investigator.

We hope thic meets with your approval.

If there are any questions re-garding format, distributicn, or budget reporting, please contact Mr. A. J.

Weiss, Administrative Technical Assistant, FTS 666-4473.

Sincerely yours, k

.. = /j. --

lter Y. Kato Deputy Chairman WYK/jw Enclosures cc:

R. Bari, BNL W. Houston, NRC M. Kaltman, NR% THIS CCFY FCW j T. Pratt, BNL K. Pulsipher, NRC J. Rosenthal, NRC B. Sheron, NRC A. J. Weiss, BNL BNL Technical Monitors 8705260403 870515 PDR FOIA SHOLLYB7-6 PDR Wir

MONTHLY HIGHLIGHTS FOR NOVEMBER 1985

" Review of the Probabilistic Risk Assessment for the Seabrook Nuclear Power Plant" (FIN A-3778)

BNL Principal Investigators:

M. Khatib-Rahbar (FTS 666-2626)

NRC Project Manager:

W. Lyon (FTS 492-9405), RS Branch 1.

Scope /

Purpose:

This project is to provide technical support to the Reactor Systems Branch in reviewing the accuracy and completeness of the. Seabrook Proba-bilistic Safety Study (SPSS).

RNL will perform a critical review of the plant design and PRA methods supplemented by audit calculations of selec-ted accident sequences to confirm the validity of the methods and results.

2.

g rk Performed During Period:

Due to priority given to otner NRC projects, no progress was made on this project.

3.

Problems / Delays:

See Item 2, 4.

Sumary of Progress to Date/ Milestones:

Task I:

Work is nearly complete on the review and evaluation of the "back-end" of the PRA for the Seabrook Nuclear Station.

Two preliminary reports have been submitted for review to the NRC Project Manager. Com-ments have been received, and have been incorporated into a draft final report.

The draft final report has been reviewed by both NRC and the applicant.

5.

Next Reporting Period:

Comments from the NRC and the applicant will be incorporated into the final report.

E I

F 1 h A fu C 1 A L 5 TA i U b e.D V F r*F E R 1985 ACCnuk=T T T T L E f,RC FTh OA417's RFVILh rF PS A FOR S F A A Rf1 06< ic P A A-3778 9 tlc E R V i d r i; : LF

,PINLIFAL IkVFSTICAT0c : K n A 11 ti-it A bP A R F.

1 F im t h A T I nr4 is A TF :

09/30/P6 CURFtNI YFAR t*s)P' T u 10 PATE i

isThFCT STrFr rFr r

u;t :

(9ap CTAFF '-(tr.lFS) 0 is 20 11 uThFCT S A L A '31 F S :

O.

1,706 rAfr9TAl s strVTLFb u.

u.

i. o r-slips UP T :

0.

u.

58'h rlifiT C Ar T S :

o.

O.

To Autt FxFEhdr5 :

9 O.

I t't; T P F C 1 FAPF A M S :

O.

$10.

tir C af 4 L 6 A11F T 12 O.

972.

e TOT 4L i;rSTS :

O.

3,tec, PFbrFNT4bF nF A V A T L F l. tsns 3PEhT :

P3v(FY e e s. U R Y o b l-E + 5 Y A F-F b f'+) 4 t

etFt. FIVER TI U41FJ T]T F iit.n I N G 5 T a Tire :

FY tcus FY tcp PgpJFCTtn FY lea 6 FUh0S FY 1986 FIAntNg C A i..s v g V t c riA.,Trg i,, v t, t o F. c

  • n T f oAfr ti A L, P'E F 0 F 0 fi
c. )

f.; k) f3 81 f4 di 14 t).

u.

O.

T I

t-t FEE RECOVERY COST STATUS IN:

A-3776 TITLE:

REVIEW 0: DRA FOR SE AB 9C3K NPP 3ERIOD:

tJ 0 V E"B ER 193E s

1 FY86 TASK /DLANT PERIOD CUP.ULATIVE

-A SEARROOK 03CKET 53-943 4.

3e198.

TOTALS :

0.

3,198 1

i l;. __. _......

7.....

. ~.

- - - - - - - - - - -