ML20214G068

From kanterella
Jump to navigation Jump to search
Review of PRA for Seabrook Nuclear Power Plant, Monthly Highlights for Nov 1985
ML20214G068
Person / Time
Site: Seabrook, 05000000
Issue date: 12/18/1985
From: Kato W
BROOKHAVEN NATIONAL LABORATORY
To: Lyon W
Office of Nuclear Reactor Regulation
Shared Package
ML20213E815 List:
References
CON-FIN-A-3778, FOIA-87-6 NUDOCS 8705260403
Download: ML20214G068 (4)


Text

_ _______ _ _ _ _ _ _ _ _

i i ,

) '. ) BROOKHAVEN NATIONAL LABORATORY

{: Q g ASSOCIATED UNIVERSITIES. INC.

Upton. Long Island. New York 11973 (516)282s Departmentof NuclearEnergy FTS 666' 2444 Decembe:r 18, 1985 Mr. Warren Lyon Reactor Systems Branch e-Division of Systems Integration ~j] D Office of Nuclear Reactor Regulation Mail Stop P-1132 U. S. Nuclear Regulatory Comission Washington, D. C. 20555

Dear Mr. Lyon:

Enclosed is the November monthly report for the activities sponsored by your Branch. Also included are the computerized budget sumaries and the fee recovery cost status for each program. I would suggest that you and ,,our  :

staf f review the reports to determine whet:'er there are any discrept ncies.

If there are, please notify the principal investigator.

We hope thic meets with your approval.

If there are any questions re-garding format, distributicn, or budget reporting, please contact Mr. A. J.

Weiss, Administrative Technical Assistant, FTS 666-4473.

Sincerely yours,

. . = /j .k --

lter Y. Kato Deputy Chairman WYK/jw Enclosures cc: R. Bari, BNL W. Houston, NRC .

M. Kaltman, NR% THIS CCFY FCW j T. Pratt, BNL K. Pulsipher, NRC J. Rosenthal, NRC B. Sheron, NRC A. J. Weiss, BNL BNL Technical Monitors 8705260403 870515 PDR FOIA SHOLLYB7-6 PDR Wir

MONTHLY HIGHLIGHTS FOR NOVEMBER 1985

" Review of the Probabilistic Risk Assessment for the Seabrook Nuclear Power Plant" (FIN A-3778)

BNL Principal Investigators: M. Khatib-Rahbar (FTS 666-2626)

NRC Project Manager: W. Lyon (FTS 492-9405), RS Branch

1. Scope /

Purpose:

This project is to provide technical support to the Reactor Systems Branch in reviewing the accuracy and completeness of the. Seabrook Proba-bilistic Safety Study (SPSS). RNL will perform a critical review of the plant design and PRA methods supplemented by audit calculations of selec-ted accident sequences to confirm the validity of the methods and results.

2. g rk Performed During Period

Due to priority given to otner NRC projects, no progress was made on this project.

3. Problems / Delays:

See Item 2,

4. Sumary of Progress to Date/ Milestones:

Task I: Work is nearly complete on the review and evaluation of the "back-end" of the PRA for the Seabrook Nuclear Station. Two preliminary reports have been submitted for review to the NRC Project Manager. Com-ments have been received, and have been incorporated into a draft final report. The draft final report has been reviewed by both NRC and the applicant.

5. Next Reporting Period:

Comments from the NRC and the applicant will be incorporated into the final report.

E I F 1 h A fu C 1 A L 5 TA i U b e.D V F r*F E R 1985 ACCnuk=T T T T L E f,RC FTh OA417's RFVILh rF PS A FOR S F A A Rf1 06< ic P A A-3778 9 tlc E R V i d r i; : LF ,PINLIFAL IkVFSTICAT0c : K n A 11 ti-it A bP A R F.

1 F im t h A T I nr4 is A TF : 09/30/P6 CURFtNI YFAR t*s)P' T u 10 PATE i isThFCT STrFr rFr u;t r  :

(9ap CTAFF '-(tr.lFS) 0 is 20 11 uThFCT S A L A '31 F S : O. 1,706 rAfr9TAl s strVTLFb u. u.

i. o r- slips UP T : 0. u.

58'h rlifiT C Ar T S : o. O.

To Autt FxFEhdr5 : 9 O.

I t't; T P F C 1 FAPF A M S : O. $10.

tir Ce af 4 L 6 A11F T 12  : O. 972.

TOT 4L i;rSTS : O. 3,tec, PFbrFNT4bF nF A V A T L F l. tsns 3PEhT : P3v(FY e t e s. U R Y o b l- E + 5 Y A F- F b f'+) 4 '

etFt. FIVER TI U41FJ  !

T]T F iit.n I N G 5 T a Tire :

FY tcus FY tcp PgpJFCTtn FY lea 6 FUh0S FY 1986 FIAntNg C A i. .s v g V t c riA.,Trg i ,, v t, t o F. c

  • n T f oAfr ti A L , P'E F 0 F 0 fi c. ) f .; k) f3 81 f4 di 14 t) . u. O.

T t- I t

FEE RECOVERY COST STATUS IN: A-3776 TITLE: REVIEW 0: DRA FOR SE AB 9C3K NPP 3ERIOD: tJ 0 V E"B ER 193E ,

s 1 FY86 TASK /DLANT PERIOD CUP.ULATIVE

-A SEARROOK 03CKET 53-943 4. 3e198.

TOTALS : 0. 3,198 1

i l

...._____7..... __ ;_

. ~ .

- - - - - - - - - - -