S::ptember 9, 1988 s
y Mr. Howard F. Dobel rr 'mmm Second Vice President Hartford Steam Boiler Inspection gg g g and insurance Company certifiedb7_ i k D_' S $ W Har f rd o necticut 06102
Dear Mr. Dobel:
In response to allegations concerning harassment and intinidation of Authorized Nuclear Inspectors at TVA plants, the NRC Office of Investigations conducted an extensive investigation to determine if these allegations were substantiated.
The conclusion of the investigation is that four of the nine authorized nuclear inspectors assigned to TVA were either coerced, pressured, harassed, intimi.
This included one inspector who dated and/or threatened by their management.
was directed by his management to accept the disposition of a non. conforming condition which did not meet code requirements.
As you know, the NRC depends to a great extent on the inspections of the authorized nuclear inspectors to ensure that activities covered under the scope of the ASME Code are carried out in an appropriate manner. Activities that have the potential to adversely impact those inspection activities such as harassment or intimidation of inspection personnel cannot be tolerated.
The NRC is particularly concerned with what specific actions are being taken by HSBI! in response to these findings.
Enclosed is a copy of the report of the NRC investigation into the issue at TVA.
Portions of the report dealing with personal privacy of individuals have been deleted. After HSBI! has reviewed the report, senior managers from HSBII are requested to meet with the NRC staff in Washington to review specific HSBII corrective action to prevent recurrence of this issue. Mr. Steven Richardson of my staff will be contacting you to schedule this meeting.
In addition, a meeting will be held between the NRC, members of the National Board of Boer and Pressure Vessel Inspectors, and the ASME staff on these issues.
Yr are invited to attend.
If you decide to de so. ontact Mr. Steven Richardson for scheduling information.
Sincerely,
')M, A Original signed by james G. Partlow
[/,g[
8809220037 ano9o9 James G. Partlow, Director PDR TOPRP EUT7VA Office of Special Projects c
PNU DISTRIBUTION: (w/o cnclosure)
Enclosure:
Report of Investigation 05P Reading JTayive LChandler Case No. 2-85 034S TVA Reading BGrimes RBosnak JPartlow EBaker Central Files SRichardson JLieberman NRC PDR 3
@N f T SEE PREVIOUS CONCURRENCE
)
.J... ::............ ::......
o 0FC
- 0SP:TVA:D
- NRR:DRIS:0
- 0Ei
- 0SP:0 1
...... :.... gg NAME :*SRichardson:am:*BGrimes
- JI,/e rman :JPartlew DATE :8/25/88
- 8/26/88
- 8/W88
- f/ 7/88 OFFICIAL RECORD COPY
. _.