Exam Rept 50-400/OL-87-01 on 870223-27.Exam results:9 of 12 Candidates Passed Simulator Exams & 1 of 2 Candidates Passed Group II Retakes
ML20209C707
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 03/30/1987
From: Casto C, Munro J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20209C679 List:
References
50-400-OL-87-01, 50-400-OL-87-1, NUDOCS 8704290057
Download: ML20209C707 (2)


Text

(

ENCLOSURE 1 EXAMINATION REPORT 400/0L-87-01 Facility Licensee:

Carolina Power and Light Company P. O. Box 1551 Raleigh, NC 27602 Facility Name:

Shearon Harris Nuclear Power Plant Facility Docket No.:

50-400 Simulator examinations were administered at Shearon Harris Nuclear Power Plant near New Hill, North Carolina.

Chief Examiner:

k V$c/? 7 m

Charles A. Casto Date Signed Approved by:

J!38!f7 I

John F. Munro, Secftt)n Chief Date Signed l

Sumary:

Examinations on February 23-27, 1987

+

Simulator examinations were administered to 14 candidates; of which two were Group Il re-takes.

For the licensed personnel; nine of 12 passed.

For the re-takes personnel; one of two passed.

.s, 1

s l

1 g2;MMEnjho V

~

~'

~

E i.

li...:.

REPORT DETAILS 1.

Facility Employees Contacted:

  • W. Geise, Project Specialist

~t

  • C, Olexik, Jr., Director, Nuclear and Simulator Training
  • W. Powell, Director, Training HTU
  • J. Harness, Acting Plant General Manager
  • J. Thompson, Operations Manager
  • Attended Exit Meeting 2.

Examiners:

  • C. Casto D. Nelson W. Dean
  • Chief Examiner 3.

Exit Meeting At the conclusion of the site visit the examiners met with representatives of the plant staff to discuss the results of the examination.

There were three generic weaknesses noted during the simulator examina-tion.

The areas of below normal performance were:

1) interpretation of Tech. Spec. 3.1.1 for the Reactor Trip Breakers; 2) interpretation of OWP-11 for P-13 bistable tripping; and 3) method of shutdown for the Emergency Diesel Generators with a Safety Injection signal present.

i The cooperation given to the examiners during the simulator examinations was noted and appreciated.

The licensee did not identify as proprietary any of the material provided to or reviewed by the examiners.

j l

1 e