H.B. Robinson Unit 2 Annual Assessment Meeting 2019 Reactor Oversight Process (ROP)

U.S. Nuclear Regulatory Commission Region 2 / Division of Reactor Projects ML20132A000

Agenda Introductions - Robinson Resident Inspectors and Regional Staff Responsible for Robinson Oversight Strategic Plan Goals Annual Assessment Summary Findings Performance Indicators NRC Plans for 2020 COVID-19 Response

Introductions

Resident Inspectors Matthew Fannon- Senior Resident Inspector Amy Beasten, PhD- Resident Inspector Regional Personnel Randy Musser - Branch Chief Lundy Pressley - Senior Project Engineer Adam Wilson - Project Engineer

The NRCs Resident Inspectors NRC Strategic Plan Goals Safety - Ensure adequate protection of public health and safety and the environment Security - Ensure adequate protection of the secure use and management of radioactive materials

NRC Annual Assessment Summary H.B. Robinson Duke Energy Progress, LLC/H.B. Robinson operated the plant safely and in a manner that preserved the public health and safety and protected the environment.

H.B. Robinson was in the licensee response Column (Column 1 of IMC 0305) of the NRCs ROP Action Matrix for the last quarter of 2019.

NRC Inspection Activities H.B. Robinson for 2019 Approximately 6000 hours0.0694 days <br />1.667 hours <br />0.00992 weeks <br />0.00228 months <br /> of inspection and related activities 2 Resident inspectors onsite for full-time inspection coverage throughout the year 8 Onsite inspections involving regional inspectors

NRC Inspection Activities H.B. Robinson for 2019 - cont.

2 major team inspections Emergency Preparedness Exercise Inspection Design Basis Assurance Inspection

H.B. Robinson PIs and Findings January 1 through December 31, 2019 All Green Performance Indicators One Green Non-cited violation 3 Apparent Violations, which were closed out to a Confirmatory Order issued in March 2020

NRC Plans for 2020 NRC plans baseline inspections at H.B. Robinson for the remainder of 2020.

This includes:

Force-on-Force Exercise Inspection Inservice Inspection (ISI)

Radiation Safety during Refueling Outage Design Basis Assurance Inspection (Programs)

Triennial Fire Protection Program Inspection Problem Identification and Resolution Inspection (completed)

NRC Response to Mission Critical Functions Monitoring plant activities remotely through inspections and oversight Maintaining emergency response capabilities with Regional IRCs and HQ Limiting and risk-informing on-site inspections by residents and region-based inspectors

NRC Response to Additional Actions Expanded use of telework Ongoing Review of Continuity of Operations Plan Coordinating actions with industry to minimize inspection impacts while protecting inspectors and plant staff

H.B. Robinson Plant Response The H.B. Robinson priority is maintaining the health and safety of its employees.

The site is engaged in social distancing by conducting virtual meetings and having employees telework when possible.

Work on site will be focused on a narrow set of responsibilities to ensure customer needs are met.

Getting in Touch with the NRC Website - www.nrc.gov Questions/Information -

OPA2.Resource@nrc.gov or 404-997-4417 Allegations 800-695-7403 Employment - 301-415-7400 or www.usajobs.gov

NRC Social Media

  • GovDelivery:

https://service.govdelivery.com/accounts/USNRC/subscriber/new

End of Presentation Nuclear Regulatory Commission Region 2 Please submit questions or feedback regarding the meeting by emailing Randy.Musser@nrc.gov Roger.Hannah@nrc.gov

NRC - Region 2 QUESTIONS?