Forwards Errata Sheet Documenting Errors Found in Ser. Requests Issuance of Sser to Note Changes,Providing NRC in Agreement
ML20138B850
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 03/17/1986
From: Bailey J
GEORGIA POWER CO.
To: Youngblood B
Office of Nuclear Reactor Regulation
References
GN-827, NUDOCS 8603250185
Download: ML20138B850 (3)


Text

o Georgia Power Company Route 2. Box 299A Waynesboro, Georgia 30830 Telephone 404 554-9961

  • 404 724 8114 Southern Company Services. Inc.

Post Office Box 2625 Birmingham, Alabama 35202 Telephone 205 870-6011 Vogtle Proj.ect March 17, 1986 Director of Nuclear Reactor Regulation File: X7BC35 Attention: Mr. B. J. Youngblood Log: GN-827 PWR Project Directorate #4 Division of PWR Licensing A U. S. Nuclear Regulatory Commission Washington, D.C. 20555 NRC DOCKET NUMBERS 50-424 AND 50-425 CONSTRUCTION PERMIT NUMBERS CPPR-108 AND CPPR-109 V0GTLE ELECTRIC GENERATING PIANT - UNITS 1 AND 2 SER CORRECTIONS

Dear Mr. Denton:

Attached for your staff's review is an errata sheet which documents errors which have appeared in the VEGP SER, including Supplement 1. If your staff agrees with the items listed, please note them in a supplement to the SER.

If your staff requires any additional information, please do not hesitate to contact me.

Sincerely,

.h. e J. A. Bailey Project Licensing Manager JAB /sm Attachment xc: R. E. Conway G. Bockhold, Jr.

R. A. Thomas NRC Resident Inspector J. E. Joiner, Esquire D. C. Teper B. W. Churchill, Esquire W. C. Ramsey M. A. Miller (2) L. T. Gucwa B. Jones, Esquire Vogtle Project File ,

0053V $M n \

8603250185 860317 PDR ADOCK 05000424 E PDR

- .~ _ . - . ~ - .- . . . . _ - . . . _ _ _ _ _ _ _ _ _ _ _ _ _

i se ATTACINENT i

4 SER PG # SER DESCRIPTION CURRENT VEGP POSITION I 2-1 Fourth line from bottom, j (Sup. 1) "... materials with more than..." "... materials with less than..."

I~

Fourth line from bottom,

"...No.'200 sieve." "...No. 200 sieve and

' 3.5 lb/ft3 for the backfill materials with more than 6%

3 passing the No. 200 sieve."

2-14 SER Sect. 2.4.1.3, Second FSAR Sect. 2.4.1.2, pg. 2.4.1-2 paragraph, " Rainfall averages states annual rainfall is at about 43 in. annually." 80 in.

i 1 2-15 SER Sect. 2.4.1.3, Fifth FSAR Sect. 2.4.1.2, pg. 2.4.1-1 paragraph, states that Savannah states the river depth is 9 to River depth is 9 to 13 feet 16 feet at VEGP.'

l at VEGP.

{ 2-18 SER Sect. 2.4.7, third paragraph FSAR Sect. 2.4.7, third i states that the depth inside paragraph states the normal river intake structure is intake structure water depth normally 24 ft. is 14 ft.

3-3, Ref erences made to "BC-TOP-3" Change to "BC-TOP-3A" 4&5 3-5 Third paragraph from bottom Change to "... prevent damage to i second line "... prevent safety related equipment structural damage during..." during. . . " {

i 3-31 Second paragraph linen 2 and 3 Delete "...and constructed..."

" designed and constructed to.. ." (see FSAR 3.8.1.8)

I 5-13 Section 5.2.5, third paragraph, Change to, "...in the leakoff fourth line, "...in the leakoff lines (except from valve lines to" stems) to" i

) 5-28 Second paragraph fourth line, Change to, "... low flow from i "... low flow to the RHR..." the RHR..."

l 5-32 First paragraph second line, Change to, "... pumped to the

"... pumped to the gaseous liquid radwaste..."

radwaste..."

6-10 Section 6.2.2, third paragraph Change to, "... containment spray

, 9th line, "... containment system (except for the spray i

spray system has been ring and headers) has been designed . . . " designed..."

i i

-._. .- ~,.. .-, , , ~ . _ _ , _ . , . . . _ , , _ _ . _ _ , . _ , . _ _ , _ , _ , _ _ . _ , . _ . , _ _ , . _ , . , _ . , _ , . . . , _ , , _ , _ , _ ,,

c o

SER PG # SER DESCRIPTION CURRENT VEGP POSITION 9-8 Fourth paragraph second line Change to "...by the fuel

"...by the spent fuel pool handling crane..."

bridge crane..."

9-12 Second paragraph sixth line, Delete "and" to read

"... containment and air ". . . containment air coolers , . . . "

Coolers,..."

9-34 Third paragraph second line Change to "...and exhaust fans

"...and exhaust fans, (common to both units),

ductwo rk. . . " ductwo rk. . . "

9-39 Section 9.4.3, fourth paragraph Change to "...in the penetration third line, "...in the areas to areas and EEF rooms to prevent prevent releases..." releases..."

9-42 Fourth paragraph, lines 3 and 4 Change to "...two banks of HEPA

...two HEPA filters..." filters..."

9-44 Section 9.4.6, third paragraph Change to, "Each set of piping line 4, "The piping restraints..."

restraints..."

Sixth line, ". . . redundant 100% Change to "...two 50%

capacity..." capacity..."

9-63 Section 9.5.4.2, second Change to "...just before the paragraph, subparagraph (2) day tank... generator building line 3 "...just below where wall."

the day tank... generator building roof."

9-64 Subparagraph (2) first line Change to " . . . te rminates

"...line terminates on the immediately outside the wall roof of the..." of the..."

9-65 Fifth paragraph first line Change to ". . . storage tank and

"... storage tank fill lines day tank vent..."

and the vent..."

10-16 Third line from top Change to "... isolation valves

"... isolation valves and and the five way restraints control valves is..." is..."

11-9 First paragraph first line Change to "... transfer of spent l

". . . transfer of spent resin..." I regenerative resin..." l l

13-19 Third line from bottom "...will Change to "...will be i be complete when the pre- substantially completed when operational..." the preoperational..." (see FSAR Fig. 13.2.2-1 also matches wording in SRP Sec.13.2.2.II.3) 0392V