Letter Sequence Request |
---|
TAC:59360, (Approved, Closed) TAC:59361, (Approved, Closed) TAC:59362, (Approved, Closed) TAC:59363, (Approved, Closed) TAC:59364, (Approved, Closed) TAC:59365, (Approved, Closed) TAC:59680, (Open) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
- Supplement, Supplement, Supplement
Results
Other: AECM-82-492, Requests That License Condition 2.C.(44)(i)(a) Be Revised to Require Submittal Re Automatic Depressurization Sys Logic Mods by 821215.Previous Submittal Date of 821029 Erroneously Requested Due to Revised BWR Owners Group Schedule, AECM-82-603, Comments on BWROG-8260, NUREG-0737,Item II.K.3.18,Mod of Automatic Depressurization Sys Logic. Option 4,providing Bypass Timer Delay,Will Assure Adequate Core Cooling During Worst Case Conditions, AECM-85-0014, Forwards Addl Info,Requested in ,Re Concerns Involving Transfer of Control to Remote Shutdown Panel Resulting in Change in Operating Status of Load That May Be Detrimental to Safe Shutdown, AECM-85-0341, Forwards Addl Info Re ECCS Performance Analysis Which Supports Increase in Peak Cladding Temp of 51 F Compared to Current FSAR Analysis,Per Request.Fsar Changes Will Be Made If Design Change Implemented, AECM-85-0396, Advises That Tech Spec Changes Contained in Amends 4 & 6 to License NPF-29 Will Be Effective Before Startup After First Refueling Outage,Per 850918 & 1021 Requests, AECM-86-0006, Forwards Technical Justification for Proposal to Delete Peak Recording Accelerographs Currently Installed on Reactor Piping Locations,Per Section 16.3.1 of Sser 6 (NUREG-0831).Response by 860228 Requested.Fee Paid, AECM-86-0234, Forwards Clarification Re Proposed Mod to License Condition 2.C(20) Concerning Standby Svc Water Sys, AECM-86-0329, Submits List of Affected Tech Spec Pages,Effective Dates & Associated Amend Numbers,In Response to NRC 860827 & 1006 Requests, AECM-86-0332, Advises of Effective Dates for Amends 6 & 8 to License NPF-29 for Listed Tech Specs,In Response to 851021 & 860827 Requests, ML20133P171, ML20154R546, ML20155J934, ML20209D136, ML20209D152
|
MONTHYEARAECM-82-492, Requests That License Condition 2.C.(44)(i)(a) Be Revised to Require Submittal Re Automatic Depressurization Sys Logic Mods by 821215.Previous Submittal Date of 821029 Erroneously Requested Due to Revised BWR Owners Group Schedule1982-10-21021 October 1982 Requests That License Condition 2.C.(44)(i)(a) Be Revised to Require Submittal Re Automatic Depressurization Sys Logic Mods by 821215.Previous Submittal Date of 821029 Erroneously Requested Due to Revised BWR Owners Group Schedule Project stage: Other AECM-82-603, Comments on BWROG-8260, NUREG-0737,Item II.K.3.18,Mod of Automatic Depressurization Sys Logic. Option 4,providing Bypass Timer Delay,Will Assure Adequate Core Cooling During Worst Case Conditions1982-12-14014 December 1982 Comments on BWROG-8260, NUREG-0737,Item II.K.3.18,Mod of Automatic Depressurization Sys Logic. Option 4,providing Bypass Timer Delay,Will Assure Adequate Core Cooling During Worst Case Conditions Project stage: Other AECM-85-0014, Forwards Addl Info,Requested in ,Re Concerns Involving Transfer of Control to Remote Shutdown Panel Resulting in Change in Operating Status of Load That May Be Detrimental to Safe Shutdown1985-01-17017 January 1985 Forwards Addl Info,Requested in ,Re Concerns Involving Transfer of Control to Remote Shutdown Panel Resulting in Change in Operating Status of Load That May Be Detrimental to Safe Shutdown Project stage: Other ML20151L0531985-07-12012 July 1985 Application for Amend to License NPF-29,revising Tech Specs to Reflect Organizational Changes & Addition of Two Primary Containment Penetration Conductor Overcurrent Protection Circuit Breakers Project stage: Request AECM-85-0248, Withdraws 850712 Proposed Change to License NPF-29,Item 7,to Reduce Burden of Requiring Rev to OL W/Each Tech Spec Amend. Change Inconsistent W/Past NRC Practices & Procedures1985-08-12012 August 1985 Withdraws 850712 Proposed Change to License NPF-29,Item 7,to Reduce Burden of Requiring Rev to OL W/Each Tech Spec Amend. Change Inconsistent W/Past NRC Practices & Procedures Project stage: Request ML20133P1711985-08-12012 August 1985 Proposed Tech Specs,Reflecting Design Changes & Editorial Clarification Re Leak Rate Testing of RHR to Head Spray Isolation Valve & ECCS Actuation Instrumentation Project stage: Other AECM-85-0228, Application for Amend to License NPF-29,changing Tech Specs to Reflect Design Changes & Editorial Clarifications.Fee Paid1985-08-12012 August 1985 Application for Amend to License NPF-29,changing Tech Specs to Reflect Design Changes & Editorial Clarifications.Fee Paid Project stage: Request ML20135E7231985-08-30030 August 1985 Notice of Violation from Insp on 850708-12 Project stage: Other AECM-85-0303, Proposed Tech Specs,Changing Table 3.3.7.4-1, Remote Shutdown Sys Controls by Deleting Item 20, RHR to RCIC Head Spray Line1985-09-13013 September 1985 Proposed Tech Specs,Changing Table 3.3.7.4-1, Remote Shutdown Sys Controls by Deleting Item 20, RHR to RCIC Head Spray Line Project stage: Other ML20135G1341985-09-13013 September 1985 Proposed Tech Specs Reflecting one-time Exception for Qualifications of Replacement Individual for Chemistry/ Radiation Control Superintendent Position Project stage: Other ML20135G1291985-09-13013 September 1985 Application for Amend to License NPF-29,requesting one-time Tech Spec Exception for Qualifications of Replacement Individual for Chemistry/Radiation Control Superintendent Position Project stage: Request ML20135F1051985-09-13013 September 1985 Application for Amend to License NPF-29,changing Tech Spec Table 3.3.7.4-1, Remote Shutdown Sys Controls, by Deleting Item 20, RHR to RCIC Head Spray Line. Fee Paid Project stage: Request AECM-85-0263, Forwards Application for Amend to License NPF-29,requesting one-time Tech Spec Exception for Qualifications of Replacement Individual for Chemistry/Radiation Control Superintendent Position.Fee Paid1985-09-13013 September 1985 Forwards Application for Amend to License NPF-29,requesting one-time Tech Spec Exception for Qualifications of Replacement Individual for Chemistry/Radiation Control Superintendent Position.Fee Paid Project stage: Request AECM-85-0304, Application for Amend to License NPF-29,supplementing 850812,23 & 30 Submittals,To Provide Justification for Exemption from Tech Spec 6.3.1 & 6.4.1 Requirements for Senior Reactor Operator Qualifications1985-09-25025 September 1985 Application for Amend to License NPF-29,supplementing 850812,23 & 30 Submittals,To Provide Justification for Exemption from Tech Spec 6.3.1 & 6.4.1 Requirements for Senior Reactor Operator Qualifications Project stage: Supplement ML20133A7611985-09-25025 September 1985 Proposed Changes to Tech Specs 6.3.1 & 6.4.1,providing Justification for Exemption from Requirements for Senior Reactor Operator Qualifications Project stage: Request AECM-85-0314, Provides Addl Info to Support Proposed Change to Tech Specs 4.1.3.3.b.1.b.GE Info Ltr Entitled Hydraulic Control Unit Accumulator Pressure Switches, to Support Proposed Change,Encl1985-09-26026 September 1985 Provides Addl Info to Support Proposed Change to Tech Specs 4.1.3.3.b.1.b.GE Info Ltr Entitled Hydraulic Control Unit Accumulator Pressure Switches, to Support Proposed Change,Encl Project stage: Request AECM-85-0305, Forwards Resumes of Two Individuals Appointed as Supervisors to Organization Radiation Control Function,Per Request for Addl Info Re 850712 Proposed Change to Tech Spec Figure 6.2.2.-11985-10-0202 October 1985 Forwards Resumes of Two Individuals Appointed as Supervisors to Organization Radiation Control Function,Per Request for Addl Info Re 850712 Proposed Change to Tech Spec Figure 6.2.2.-1 Project stage: Request AECM-85-0306, Responds to Request for Addl Info Re 850812 Application for Amend to License NPF-29.Prompt Resolution of Questions & Approval of Previously Submitted Tech Specs Needed for Outage Scheduled to Start on 8510121985-10-0505 October 1985 Responds to Request for Addl Info Re 850812 Application for Amend to License NPF-29.Prompt Resolution of Questions & Approval of Previously Submitted Tech Specs Needed for Outage Scheduled to Start on 851012 Project stage: Request AECM-85-0341, Forwards Addl Info Re ECCS Performance Analysis Which Supports Increase in Peak Cladding Temp of 51 F Compared to Current FSAR Analysis,Per Request.Fsar Changes Will Be Made If Design Change Implemented1985-10-22022 October 1985 Forwards Addl Info Re ECCS Performance Analysis Which Supports Increase in Peak Cladding Temp of 51 F Compared to Current FSAR Analysis,Per Request.Fsar Changes Will Be Made If Design Change Implemented Project stage: Other ML20138J7161985-10-23023 October 1985 Proposed Tech Spec 6.3.1 for one-time Exception of Reg Guide 1.8 Re Qualifications of Chemistry/Radiation Control Superintendent Project stage: Other AECM-85-0346, Application for Amend to License NPF-29,revising Tech Spec 6.3.1 for one-time Exception of Reg Guide 1.8 Re Qualifications of Chemistry/Radiation Control Superintendent1985-10-23023 October 1985 Application for Amend to License NPF-29,revising Tech Spec 6.3.1 for one-time Exception of Reg Guide 1.8 Re Qualifications of Chemistry/Radiation Control Superintendent Project stage: Request ML20138J7011985-10-24024 October 1985 Forwards Application for Amend to License NPF-29,revising Tech Spec 6.3.1 for one-time Exception of Reg Guide 1.8 Re Qualifications of Chemistry/Radiation Control Superintendent.Fee Paid Project stage: Request AECM-85-0350, Discusses Util Commitments Resulting from Proposed Tech Spec Changes Re Acceptable High/Low Pressure Boundary Design for RHR Headspray Line.Handswitches Will Be Removed from Remote Shutdown Panel for Valves E12-F023 & E12-F3941985-10-30030 October 1985 Discusses Util Commitments Resulting from Proposed Tech Spec Changes Re Acceptable High/Low Pressure Boundary Design for RHR Headspray Line.Handswitches Will Be Removed from Remote Shutdown Panel for Valves E12-F023 & E12-F394 Project stage: Other ML20137Q8901985-11-22022 November 1985 Forwards Safety Evaluation Re 850812 Request for Amend to License NPF-29,adding Pressure Permissive Interlocks to Control Circuits for Low Pressure ECCS Injection Valves,Item 13 of 850812 Request Should Be Revised Project stage: Approval ML20137Q8971985-11-22022 November 1985 Safety Evaluation Re Low Pressure ECCS Sys Pressure Permissive Interlocks.Exceeding ASME Code Allowable Design Pressure for Interlocks Unacceptable Project stage: Approval AECM-85-0396, Advises That Tech Spec Changes Contained in Amends 4 & 6 to License NPF-29 Will Be Effective Before Startup After First Refueling Outage,Per 850918 & 1021 Requests1985-12-0606 December 1985 Advises That Tech Spec Changes Contained in Amends 4 & 6 to License NPF-29 Will Be Effective Before Startup After First Refueling Outage,Per 850918 & 1021 Requests Project stage: Other AECM-85-0404, Application for Amend to License NPF-29,revising Tech Spec 6.3.1 to Allow one-time Exception Re Qualifications of Chemistry/Radiation Control Superintendent1985-12-11011 December 1985 Application for Amend to License NPF-29,revising Tech Spec 6.3.1 to Allow one-time Exception Re Qualifications of Chemistry/Radiation Control Superintendent Project stage: Request ML20138H8941985-12-11011 December 1985 Proposed Tech Spec,Allowing one-time Exception Re Qualifications of Chemistry/Radiation Control Superintendent Project stage: Other AECM-86-0006, Forwards Technical Justification for Proposal to Delete Peak Recording Accelerographs Currently Installed on Reactor Piping Locations,Per Section 16.3.1 of Sser 6 (NUREG-0831).Response by 860228 Requested.Fee Paid1986-01-10010 January 1986 Forwards Technical Justification for Proposal to Delete Peak Recording Accelerographs Currently Installed on Reactor Piping Locations,Per Section 16.3.1 of Sser 6 (NUREG-0831).Response by 860228 Requested.Fee Paid Project stage: Other ML20154R5461986-03-21021 March 1986 Proposed Tech Specs Revising License Condition 2.C.(28) Re Requirement for Corporate Mgt Officials on Nuclear Operations Staff & Modifying Tables 3.3.7.2-1 & 4.3.7.2-1 to Reflect Design Change Project stage: Other AECM-86-0082, Supplemental Application for Amend to License NPF-29, Modifying 851114 Proposed Change Re License Condition 2.C.(28) & Revising Tech Specs Concerning Design Changes to Be Implemented During First Refueling Outage.Fee Paid1986-03-21021 March 1986 Supplemental Application for Amend to License NPF-29, Modifying 851114 Proposed Change Re License Condition 2.C.(28) & Revising Tech Specs Concerning Design Changes to Be Implemented During First Refueling Outage.Fee Paid Project stage: Supplement ML20155D8101986-04-0808 April 1986 Summary of 860401 Meeting W/Utils Re Resolution of Issue of Interlocks for ECCS Injection Valves Which Also Function as Pressure Isolation Valves.Viewgraphs & List of Attendees Encl Project stage: Meeting AECM-86-0150, Application for Amend to License NPF-29,adding Another Undervoltage Protection Device & Emergency Override of Test Mode for Div 3 Diesel Generator & Increasing Test Loads for Div 1 & 2 Batteries.Fee Paid1986-05-19019 May 1986 Application for Amend to License NPF-29,adding Another Undervoltage Protection Device & Emergency Override of Test Mode for Div 3 Diesel Generator & Increasing Test Loads for Div 1 & 2 Batteries.Fee Paid Project stage: Request ML20155J9341986-05-19019 May 1986 Proposed Tech Specs Adding Undervoltage Protection Device & Emergency Override of Test Mode for Div 3 HPCS Diesel Generator & Increasing Test Loads for Div 1 & 2 Batteries Project stage: Other ML20205S2021986-05-27027 May 1986 Forwards Safety Evaluation Supporting Util 860110 Proposal to Remove Four Peak Recording Accelerographs Installed on Reactor Piping Due to Inoperability Caused by Operating Transients & Adequacy of Other Seismic Instrumentation Project stage: Approval ML20205S2151986-05-27027 May 1986 Safety Evaluation Supporting Util 860110 Proposal to Remove Four Peak Recording Accelerographs Mounted on Reactor Piping Project stage: Approval AECM-86-0163, Provides Addl Info to 860321 Proposed Change PCOL-86/04 to License NPF-29 Re Mods to Automatic Depressurization Sys Per BWR Owners Group Evaluation of NUREG-0737,Item II.K.3.18. Info Clarifies Changes Made to Sys Initiation Circuitry1986-05-30030 May 1986 Provides Addl Info to 860321 Proposed Change PCOL-86/04 to License NPF-29 Re Mods to Automatic Depressurization Sys Per BWR Owners Group Evaluation of NUREG-0737,Item II.K.3.18. Info Clarifies Changes Made to Sys Initiation Circuitry Project stage: Request AECM-86-0111, Forwards Supplemental Info Re Design Change to Add Interlocks to ECCS Injection Valves,Per NRC 860403 Telcon. Approval of 850812 Proposed Amend to Tech Specs Also Requested1986-05-30030 May 1986 Forwards Supplemental Info Re Design Change to Add Interlocks to ECCS Injection Valves,Per NRC 860403 Telcon. Approval of 850812 Proposed Amend to Tech Specs Also Requested Project stage: Supplement ML20207E7261986-07-15015 July 1986 Proposed Changes to Tech Spec Seismic Monitoring Instrumentation Tables 3.3.7.2-1 & 4.3.7.2-1 to Delete four- Peak Recording Accelerographs on Reactor Piping & Make Measurement Values Consistent Project stage: Request AECM-86-0221, Application for Amend to License NPF-29,changing Tech Spec Seismic Monitoring Instrumentation Tables to Delete four- Peak Recording Accelerographs on Reactor Piping & Make Measurement Values Consistent.Fee Paid1986-07-15015 July 1986 Application for Amend to License NPF-29,changing Tech Spec Seismic Monitoring Instrumentation Tables to Delete four- Peak Recording Accelerographs on Reactor Piping & Make Measurement Values Consistent.Fee Paid Project stage: Request AECM-86-0234, Forwards Clarification Re Proposed Mod to License Condition 2.C(20) Concerning Standby Svc Water Sys1986-07-25025 July 1986 Forwards Clarification Re Proposed Mod to License Condition 2.C(20) Concerning Standby Svc Water Sys Project stage: Other AECM-86-0232, Forwards Tabulation & Analyses for Standby Svc Water Cooling Towers Based on Max 30-day Average Wet Bulb & Refueling Outage 18,per NRC Request for Worst Case Scenario of Util 860519 Analyses1986-07-29029 July 1986 Forwards Tabulation & Analyses for Standby Svc Water Cooling Towers Based on Max 30-day Average Wet Bulb & Refueling Outage 18,per NRC Request for Worst Case Scenario of Util 860519 Analyses Project stage: Request ML20209D1521986-08-28028 August 1986 Notice of Consideration of Issuance of Amend to License NPF-29 & Proposed NSHC Determination & Opportunity for Hearing Re Addition of Specs to Table 3.3.3-1, ECCS Actuation Instrumentation Project stage: Other ML20209D1361986-09-0202 September 1986 Requests Notice of Consideration of Issuance of Amend to License NPF-29 & Proposed NSHC Determination & Opportunity for Hearing Re Addition of Specs to Table 3.3.3-1, ECCS Actuation Instrumentation Be Expeditiously Published in Fr Project stage: Other AECM-86-0329, Submits List of Affected Tech Spec Pages,Effective Dates & Associated Amend Numbers,In Response to NRC 860827 & 1006 Requests1986-10-14014 October 1986 Submits List of Affected Tech Spec Pages,Effective Dates & Associated Amend Numbers,In Response to NRC 860827 & 1006 Requests Project stage: Other AECM-86-0332, Advises of Effective Dates for Amends 6 & 8 to License NPF-29 for Listed Tech Specs,In Response to 851021 & 860827 Requests1986-10-17017 October 1986 Advises of Effective Dates for Amends 6 & 8 to License NPF-29 for Listed Tech Specs,In Response to 851021 & 860827 Requests Project stage: Other 1985-09-13
[Table View] |
Forwards Resumes of Two Individuals Appointed as Supervisors to Organization Radiation Control Function,Per Request for Addl Info Re 850712 Proposed Change to Tech Spec Figure 6.2.2.-1ML20138A265 |
Person / Time |
---|
Site: |
Grand Gulf |
---|
Issue date: |
10/02/1985 |
---|
From: |
Dale L MISSISSIPPI POWER & LIGHT CO. |
---|
To: |
Harold Denton Office of Nuclear Reactor Regulation |
---|
References |
---|
AECM-85-0305, AECM-85-305, TAC-59360, TAC-59361, TAC-59362, TAC-59363, TAC-59364, TAC-59365, TAC-59680, NUDOCS 8510080494 |
Download: ML20138A265 (7) |
|
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217F8911999-10-13013 October 1999 Forwards Copy of FEMA Region IV Final Rept for 990623-24, Grand Gulf Nuclear Station Exercise.Rept Indicates No Deficiencies or Areas Requiring Corrective Action Identified During Exercise ML20216J8891999-10-0404 October 1999 Forwards Details of Existing Procedural Guidance & Planned Administrative Controls.Util Respectfully Requests NRC Review & Approval of Changes by 991020.Date Will Permit to Implement Changes & Realize Full Benefit During Refueling ML20217B0361999-10-0404 October 1999 Refers to Investigation Conducted by NRC OI Re Activities at Grand Gulf Nuclear Station.Investigation Conducted to deter- Mine Whether Security Supervisor Deliberately Falsified Unescorted Access Authorizations.Allegation Unsubstantiated ML20212J8151999-09-29029 September 1999 Forwards Insp Rept 50-416/99-12 on 990725-0904.One Violation Noted & Being Treated as Noncited Violation.Licensee Conduct of Activities at Grand Gulf Facility Characterized by Safety Conscious Operations,Sound Engineering & Maint Practices ML20216J6811999-09-28028 September 1999 Ack Receipt of ,Transmitting Rev 31 to Physical Security Plan for GGNS Under Provisions of 10CFR50.54(p). NRC Approval Not Required,Based on Determination That Changes Do Not Decrease Effectiveness & Limited Review ML20212J7361999-09-28028 September 1999 Forwards Insp Rept 50-416/99-11 on 990830-0903.No Violations Noted.Purpose of Insp to Review Solid Radioactive Waste Management & Radioactive Matl Transportation Programs ML20212J5321999-09-27027 September 1999 Forwards Insp Rept 50-416/99-14 on 990830-0903.No Violations Noted.Inspectors Determined That Radioactive Waste Effluent Releases Properly Controlled,Monitored & Quantified ML20216J7101999-09-26026 September 1999 Forwards NRC Form 536,in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator License Examinations ML20216J8141999-09-26026 September 1999 Forwards Proprietary Renewal Applications for Licensed Operators for Wk Gordon & SA Elliott at Grand Gulf Nuclear Station.Proprietary Info Withheld ML20212F5521999-09-23023 September 1999 Forwards SER Accepting Util Analytical Approach for Ampacity Derating Determinations at Grand Gulf Nuclear Station,Unit 1 & That No Outstanding Ampacity Derating Issues as Identified in GL 92-08 Noted ML20212D9211999-09-16016 September 1999 Informs That NRC Staff Completed Midcycle PPR of GGNS on 990818 & Identified No Areas in Which Licensee Performance Warranted Insp Beyond Core Insp Program.Details of Insp Plan Through March 2000 Encl ML20212A9331999-09-13013 September 1999 Forwards Partially Withheld Insp Rept 50-416/99-15 on 990816-20 (Ref 10CFR73.21).One Violation of NRC Requirements Occurred & Being Treated as Ncv,Consistent with App C of Enforcement Policy ML20211P7631999-09-10010 September 1999 Discusses Staff Issuance of SECY-99-204, Kaowool & FP-60 Fire Barriers at Plant.Proposed Meeting to Discuss Subj Issues Will Take Place in Oct or Nov 1999 ML20212A6951999-09-0909 September 1999 Requests That Licensees Affected by Kaowool Fire Barriers Take Issue on Voluntary Initiative & Propose Approach for Resolving Subj Issues.Staff Plans to Meet with Licensees to Discuss Listed Topics ML20212A8341999-09-0909 September 1999 Requests That Licensees Affected by Kaowool Fire Barriers Take Issue on Voluntary Initiative & Propose Approach for Resolving Subj Issues.Staff Plans to Meet with Licensees to Discuss Listed Topics ML20211Q3471999-09-0909 September 1999 Forwards Federal Emergency Mgt Agency Final Rept for 990623 Plant Emergency Preparedness Exercise.No Deficiencies Noted & One Area Requiring Corrective Action Identified ML20211Q3091999-09-0909 September 1999 Forwards Safety Evaluation Accepting BWROG Rept, Prediction of Onset of Fission Gas Release from Fuel in Generic BWR, Dtd July 1996 ML20211Q4861999-09-0808 September 1999 Informs That Util Has Discovered Dose Calculation Utilized non-conservative Geometry Factor for Parameter.Calculation Error Being Evaluated in Accordance with Corrective Action Program ML20211Q0091999-09-0808 September 1999 Forwards Request for Addl Info Re Individual Plant Exam of External Events for Grand Gulf Nuclear Station,Unit 1. Response Requested by 000615 ML20211N4301999-09-0808 September 1999 Discusses Proposed Meeting to Discuss Kaowool Fire Barriers. Staff Requesting That Affected Licensees Take Issue on Voluntary Initative & Propose Approach for Resolving Issues ML20211P4171999-09-0707 September 1999 Ack Receipt of ,Which Transmitted Addendum to Rev 30 to Physical Security Plan for Ggns,Per 10CFR50.54(p).NRC Approval Is Not Required,Since Util Determined That Changes Do Not Decrease Effectiveness of Plan ML20211P4121999-09-0707 September 1999 Requests NRC Staff Review & Approval of Integrated Nuclear Security Plan (Insp) & Integrated Security Training & Qualification Plan (Ist&Q), for Use by All Entergy Operations,Inc.Encl Withheld,Per 10CFR2.790(d) ML20211K6061999-08-31031 August 1999 Informs That Plant Has No Candidates to Take 991006 Generic Fundamentals Exam ML20211K5641999-08-31031 August 1999 Forwards Rev 39 to Grand Gulf Nuclear Station Emergency Plan Non-Safety Related, IAW 10CFR50,App E,Section V. Changes Do Not Decrease Effectiveness of Plan & Continues to Meets Stds of 10CFR50.47(b) & Requirements of App E ML20211J2321999-08-26026 August 1999 Advises That Info Contained in to Support NRC Review of GE Rept, Prediction of Onset of Fission Gas Release from Fuel in Generic BWR, Will Be Withheld from Public Disclosure ML20211J3761999-08-25025 August 1999 Corrected Ltr Informing That Info Provided (on Computer Disk & in Ltr to Ineel ) Marked as Proprietary Will Be Withheld from Public Disclosure Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954,as Amended.Corrected 990827 ML20211F4881999-08-25025 August 1999 Advises That Info Submitted by 990716 Application & Affidavit Containing Diskette & to Ineel Mareked Proprietary Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954 ML20211F7751999-08-24024 August 1999 Forwards Insp Rept 50-416/99-10 on 990809-13.No Violations Noted.Insp Covered Licensed Operator Requalification Program & Observations of Requalification Activities ML20211C4381999-08-20020 August 1999 Forwards Rev 31 to Physical Security Plan for Protection of Grand Gulf Nuclear Station,Iaw 10CFR50.54(p).Util Has Determined That Rev Does Not Decrease Effectiveness of Plan. Encl Withheld,Per 10CFR73.21 ML20211C5101999-08-19019 August 1999 Forwards Certified Copies of Liability Insurance Policy Endorsements Issued in First Half of 1999 for Each Entergy Operations,Inc Nuclear Unit,Per 10CFR140.15 ML20211B3761999-08-16016 August 1999 Submits Voluntary Response to NRC AL 99-02, Operating Reactor Licensing Actions Estimates, for Fys 2000 & 2001, ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20211A9481999-08-12012 August 1999 Informs of Completion of Analysis of Heat Transfer in Cooler During Fan Coast Down & Concludes That Potential Exists for Steam Foundation,Under Conditions Where Dcw Sys Flow Is Lost Prior to Full Isolation Valve Closure ML20210P8411999-08-0909 August 1999 Forwards Insp Rept 50-416/99-09 on 990613-0724.No Violations Noted.Activities at Facility Generally Characterized by safety-conscious Operations,Sound Engineering & Maint Practices & Careful Radiological Work Controls ML20210N6401999-08-0303 August 1999 Informs That Eighteeen Identified Penetrations Will Be Restored to Conformance with Licensing Requirements Prior to Restart from RFO10,scheduled for Fall 1999,per GL 96-06. Example of Piping Analysis Being Performed,Encl ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210K1951999-07-30030 July 1999 Forwards Insp Rept 50-416/99-03 on 990405-08 & 0510-11.No Violations Identified ML20211K7491999-07-30030 July 1999 Forwards Ltr Rept Documenting Work Completed Under JCN-W6095,analyses Performed at Ineel to Calculate Minimum Time to Fuel Pin Failure in Boiling Water Reactors (BWR) ML20210K6661999-07-29029 July 1999 Forwards Fitness for Duty Program Performance six-month Rept for Period Covering Jan-June 1999,per 10CFR26.71 ML20210F3591999-07-26026 July 1999 Forwards Proprietary Version & Redacted Version of Wyle Test Rept M-J5.08-Q1-45161-0-8.0-1-0,re Pressure Locking & Thermal Binding Test Program.Proprietary Version Withheld ML20210E3251999-07-23023 July 1999 Forwards Insp Rept 50-416/99-07 on 990622-25.No Violations Noted.Emergency Plan & Procedures During Biennial Emergency Preparedness Exercise Was Conducted ML20210D2401999-07-21021 July 1999 Informs of Resignation of Operator WE Griffith,License OP-20806-1,from Entergy Operations,Inc ML20209J0311999-07-16016 July 1999 Forwards Proprietary Info Supporting Review of Generic Alternate Source Term Request.Proprietary Info Withheld Per 10CFR2.790 ML20209G4791999-07-15015 July 1999 Forwards Proposed Emergency Plan Change as Addendum to Changes Previously Submitted Via GNRO-98/00028 & GNRO-99/00007,for NRC Review & Approval ML20210B1031999-07-15015 July 1999 Forwards Insp Rept 50-416/99-08 on 990502-0612.Determined That Three Severity Level IV Violations Occurred & Being Treated as Noncited Violations ML20210H3211999-07-14014 July 1999 Forwards Proprietary Info Supporting Review of 970506 Submittal of BWROG Rept, Prediction of Onset of Fission Gas Release from Fuel in Generic Bwr. Proprietary Info Withheld Per 10CFR2.790 ML20209D7511999-07-0909 July 1999 Responds to RAI on GL 92-01,rev 1,suppl 1, Rv Structural Integrity. as Result of NRC Review of Util Responses,Info Revised in Rvid & Rvid Version 2 Will Be Released ML20209D7671999-07-0101 July 1999 Submits Response to Violations Noted in Insp Rept 50-416/99-02 on 990222-26 & 0308-12.Corrective Actions: Contractor Performance Has Been re-evaluated in Regards to UFSAR Reviews ML20196K4901999-07-0101 July 1999 Discusses Relief Requests PRR-E12-01,PRR-E21-01,PRR-E22-01, PRR-P75-01,PRR-P81-01,VRR-B21-01,VRR-B21-02,VRR-E38-01 & VRR-E51-01 Submitted by EOI on 971126 & 990218.SE Accepting Alternatives Proposed by Util Encl ML20196J5711999-06-30030 June 1999 Advises That Versions of Submitted Info in 990506 Application & Affidavit, Re Proposed Amend to Revise Ts,Marked Proprietary Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEA 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20216J8891999-10-0404 October 1999 Forwards Details of Existing Procedural Guidance & Planned Administrative Controls.Util Respectfully Requests NRC Review & Approval of Changes by 991020.Date Will Permit to Implement Changes & Realize Full Benefit During Refueling ML20216J7101999-09-26026 September 1999 Forwards NRC Form 536,in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator License Examinations ML20216J8141999-09-26026 September 1999 Forwards Proprietary Renewal Applications for Licensed Operators for Wk Gordon & SA Elliott at Grand Gulf Nuclear Station.Proprietary Info Withheld ML20211Q4861999-09-0808 September 1999 Informs That Util Has Discovered Dose Calculation Utilized non-conservative Geometry Factor for Parameter.Calculation Error Being Evaluated in Accordance with Corrective Action Program ML20211P4121999-09-0707 September 1999 Requests NRC Staff Review & Approval of Integrated Nuclear Security Plan (Insp) & Integrated Security Training & Qualification Plan (Ist&Q), for Use by All Entergy Operations,Inc.Encl Withheld,Per 10CFR2.790(d) ML20211K6061999-08-31031 August 1999 Informs That Plant Has No Candidates to Take 991006 Generic Fundamentals Exam ML20211K5641999-08-31031 August 1999 Forwards Rev 39 to Grand Gulf Nuclear Station Emergency Plan Non-Safety Related, IAW 10CFR50,App E,Section V. Changes Do Not Decrease Effectiveness of Plan & Continues to Meets Stds of 10CFR50.47(b) & Requirements of App E ML20211C4381999-08-20020 August 1999 Forwards Rev 31 to Physical Security Plan for Protection of Grand Gulf Nuclear Station,Iaw 10CFR50.54(p).Util Has Determined That Rev Does Not Decrease Effectiveness of Plan. Encl Withheld,Per 10CFR73.21 ML20211C5101999-08-19019 August 1999 Forwards Certified Copies of Liability Insurance Policy Endorsements Issued in First Half of 1999 for Each Entergy Operations,Inc Nuclear Unit,Per 10CFR140.15 ML20211B3761999-08-16016 August 1999 Submits Voluntary Response to NRC AL 99-02, Operating Reactor Licensing Actions Estimates, for Fys 2000 & 2001, ML20211A9481999-08-12012 August 1999 Informs of Completion of Analysis of Heat Transfer in Cooler During Fan Coast Down & Concludes That Potential Exists for Steam Foundation,Under Conditions Where Dcw Sys Flow Is Lost Prior to Full Isolation Valve Closure ML20210N6401999-08-0303 August 1999 Informs That Eighteeen Identified Penetrations Will Be Restored to Conformance with Licensing Requirements Prior to Restart from RFO10,scheduled for Fall 1999,per GL 96-06. Example of Piping Analysis Being Performed,Encl ML20211K7491999-07-30030 July 1999 Forwards Ltr Rept Documenting Work Completed Under JCN-W6095,analyses Performed at Ineel to Calculate Minimum Time to Fuel Pin Failure in Boiling Water Reactors (BWR) ML20210K6661999-07-29029 July 1999 Forwards Fitness for Duty Program Performance six-month Rept for Period Covering Jan-June 1999,per 10CFR26.71 ML20210F3591999-07-26026 July 1999 Forwards Proprietary Version & Redacted Version of Wyle Test Rept M-J5.08-Q1-45161-0-8.0-1-0,re Pressure Locking & Thermal Binding Test Program.Proprietary Version Withheld ML20210D2401999-07-21021 July 1999 Informs of Resignation of Operator WE Griffith,License OP-20806-1,from Entergy Operations,Inc ML20209J0311999-07-16016 July 1999 Forwards Proprietary Info Supporting Review of Generic Alternate Source Term Request.Proprietary Info Withheld Per 10CFR2.790 ML20209G4791999-07-15015 July 1999 Forwards Proposed Emergency Plan Change as Addendum to Changes Previously Submitted Via GNRO-98/00028 & GNRO-99/00007,for NRC Review & Approval ML20210H3211999-07-14014 July 1999 Forwards Proprietary Info Supporting Review of 970506 Submittal of BWROG Rept, Prediction of Onset of Fission Gas Release from Fuel in Generic Bwr. Proprietary Info Withheld Per 10CFR2.790 ML20209D7671999-07-0101 July 1999 Submits Response to Violations Noted in Insp Rept 50-416/99-02 on 990222-26 & 0308-12.Corrective Actions: Contractor Performance Has Been re-evaluated in Regards to UFSAR Reviews ML20209B6081999-06-30030 June 1999 Submits Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Disclosure Encl ML20195J6351999-06-16016 June 1999 Forwards Addendum to Rev 30 of GGNS Physical Security Plan IAW 10CFR50.54(p).Addendum Is Submitted to Announce Relocation/Reconfiguration of Plant Central & Secondary Alarm Station Facilities.Rev Withheld,Per 10CFR73.21 ML20195G0281999-06-0909 June 1999 Submits Summary on Resolution of GL 96-06 Re Eighteen Penetrations Previously Identified as Being Potentially Susceptible to Overpressurization ML20207F5041999-06-0202 June 1999 Forwards Updated Medical Rept IAW License Condition 3 for DA Killingsworth License OP-20942-1.Without Encls ML20206P2981999-05-13013 May 1999 Forwards Responses to RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs, Cancelling 990402 Submittal ML20206N1921999-05-10010 May 1999 Provides Revised Attachment 2 for Alternative Request IWE-02,originally Submitted 990429 Re Bolt Torque or Tension Testing of Class Mc pressure-retaining Bolting as Specified in Item 8.20 of Article IWE-2500,Table IWE-2500-1 ML20206J0941999-05-0404 May 1999 Forwards Proprietary & Redacted ME-98-001-00,both Entitled, Pressure Locking & Thermal Binding Test Program on Two Gate Valves with Limitorque Actuators. Rept ME-98-002-00 Re Flexible Wedge Gate Valves,Encl.Proprietary Rept Withheld ML20206E7811999-04-29029 April 1999 Proposes Alternatives to Requirements of ASME B&PV Code Section XI,1992 Edition,1992 Addenda,As Listed.Approval of Alternative Request on or Before 990915,requested ML20206D8171999-04-29029 April 1999 Informs NRC of Results of Plant Improvement Considerations Identified in GGNS Ipe,As Requested in NRC . Licensee Found Efforts Have Minimized Extent of Radiological Release in Unlikely Event That Severe Accident Occurred ML20206D7281999-04-28028 April 1999 Forwards South Mississippi Electric Power Association 1998 Annual Rept, Per 10CFR50.71(b).Licensee Will Submit 1998 Annual Repts for System Energy Resources,Inc,Entergy Mississippi,Inc & EOI as Part of Entergy Corp Annual Rept ML20206C9551999-04-22022 April 1999 Forwards 1999 Biennial Emergency Preparedness Exercise Scenario. Without Encl ML20205M1311999-04-0202 April 1999 Forwards Response to RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. Info Was Discussed During Conference Call with NRC on 990126.Wyle Position Paper Encl.Subj Paper Withheld ML20205H5861999-04-0101 April 1999 Requests Relief from ASME B&PV Code,Section XI for Period of Time That Temporary non-code Repair Was in Effect,Per 10CFR50.55a(g)(5)(iii) ML20205F1781999-03-31031 March 1999 Forwards Consolidated Entergy Submittal to Document Primary & Excess Property Damage Insurance Coverage for Nuclear Sites of Entergy Operations,Inc,Per 10CFR50.54(w)(3) ML20196K7101999-03-26026 March 1999 Submits Reporting & Recordkeeping for Decommissioning Planning,Per 10CFR50.75(f)(1) ML20205A6511999-03-25025 March 1999 Responds to NRC Re Violations Noted in Insp Rept 50-416/99-01 on 990201-05.Corrective Actions:Program Will Be Implemented to Ensure Accessible Areas with Radiation Levels Greater than 1000 Mrem/H ML20204E7391999-03-15015 March 1999 Forwards Objectives for June 1999 Emergency Preparedness Exercise for Plant.Without Encl ML20207H9291999-03-0404 March 1999 Submits Update to Original Certification of Grand Gulf Nuclear Station Simulation Facility IAW Requirements of 10CFR55.45(b)(5) ML20207E3081999-03-0303 March 1999 Informs That GGNS Severe Accident Mgt Implementation Was Completed on 981223.Effort Was Worthwhile & Station Ability to Respond & Mitigate Events That May Lead to Core Melt Has Been Enhanced ML20207E3221999-03-0303 March 1999 Notifies of Change in Status of Mj Ellis,License SOP-43846. Conditional License Requested to Accommodate Medical Condition.Revised NRC Form 396 with Supporting Medical Evidence Attached.Without Encls ML20207A8161999-02-24024 February 1999 Forwards 1998 Annual Operating Rept for Ggns,Unit 1. Listed Attachments Are Encl ML20207A9901999-02-24024 February 1999 Informs That Util Has No Candidates from GGNS to Nominate for Participation in Planned Gfes,Scheduled for 990407 ML20203A1551999-02-0101 February 1999 Forwards Grand Gulf Nuclear Station Fitness for Duty Program Performance six-month Rept for Reporting Period 980701-981231 ML20202G0791999-01-26026 January 1999 Informs That He Mcknight Has Been Permanently Reassigned from Position Requiring License to Perform Assigned Duties. License Is No Longer Needed,Effective 981231 ML20199K4151999-01-20020 January 1999 Forwards Proposed Addendum to Emergency Plan Changes Previously Submitted Via GNRO-98/00028 for NRC Review & Approval as Required by 10CFR50.54(q) & 50.4 ML20199K6771999-01-14014 January 1999 Provides Notification of Planned ERDS Software Change Scheduled to Take Place on 990215 ML20199D8811999-01-11011 January 1999 Submits Response to SE JOG Program on Periodic Verification of motor-operated Valves,In Response to GL 96-05 ML20199D9521999-01-0808 January 1999 Informs That CE Cresap,License SOP-4220-4,has Been Permanently Reassigned from Position Requiring License & No Longer Has Need for License,Per 10CFR50.74 ML20199A6081999-01-0606 January 1999 Submits List of Plant Info Brochures Disseminated Annually to Public & List of Updated State &/Or Local Emergency Plan Info,Per NRC Administrative Ltr 94-07, Distribution of Site-Specific & State Emergency Planning Info ML20202B7531998-12-21021 December 1998 Submits Ltr Confirming Discussion with J Tapia,Documenting Extension for Response to NOV 50-416/98-13.Util Response Will Be Submitted by 990212 1999-09-08
[Table view] Category:UTILITY TO NRC
MONTHYEARAECM-90-0169, Forwards Operator Licensing Natl Exam Schedule for FY91 Through FY94,per Generic Ltr 90-071990-09-17017 September 1990 Forwards Operator Licensing Natl Exam Schedule for FY91 Through FY94,per Generic Ltr 90-07 AECM-90-0172, Forwards Endorsement 67 to Nelia Policy NF-257 & Endorsement 46 to Maelu Policy MF-1061990-09-17017 September 1990 Forwards Endorsement 67 to Nelia Policy NF-257 & Endorsement 46 to Maelu Policy MF-106 AECM-90-0174, Forwards List of Submittals Pending NRR Review Re Grand Gulf Licensing Activities1990-09-14014 September 1990 Forwards List of Submittals Pending NRR Review Re Grand Gulf Licensing Activities AECM-90-0165, Forwards Addl Info on NRC Bulletin 90-001, Loss of Fill-Oil in Transmitters Mfg by Rosemount1990-09-12012 September 1990 Forwards Addl Info on NRC Bulletin 90-001, Loss of Fill-Oil in Transmitters Mfg by Rosemount AECM-90-0158, Forwards Quarterly Status Rept for Reg Guide 1.97 Re Neutron Monitoring Sys for Period Ending 900630.Rept Includes Major Actions Completed to Date for Unit ex-core Sys.Estimated Milestone Schedule for Activities Also Encl1990-09-0808 September 1990 Forwards Quarterly Status Rept for Reg Guide 1.97 Re Neutron Monitoring Sys for Period Ending 900630.Rept Includes Major Actions Completed to Date for Unit ex-core Sys.Estimated Milestone Schedule for Activities Also Encl AECM-90-0163, Forwards Endorsement 61 to Nelia Policy NF-257,Endorsement 40 to Maelu Policy MF-106,Endorsement 62 to Nelia Policy NF-257,Endorsement 41 to Maelu Policy MF-106 & Endorsement 63 to Nelia Policy NF-2571990-09-0606 September 1990 Forwards Endorsement 61 to Nelia Policy NF-257,Endorsement 40 to Maelu Policy MF-106,Endorsement 62 to Nelia Policy NF-257,Endorsement 41 to Maelu Policy MF-106 & Endorsement 63 to Nelia Policy NF-257 AECM-90-0161, Forwards Quarterly Status Rept Re Degraded Core Accident Hydrogen Control Program, for Apr-June 19901990-08-30030 August 1990 Forwards Quarterly Status Rept Re Degraded Core Accident Hydrogen Control Program, for Apr-June 1990 AECM-90-0149, Forwards Semiannual Radioactive Effluent Release Rept for Jan-June 1990 & Rev 3 to Process Control Program1990-08-30030 August 1990 Forwards Semiannual Radioactive Effluent Release Rept for Jan-June 1990 & Rev 3 to Process Control Program AECM-90-0162, Forwards fitness-for-duty 6-month Rept for Period Ending June 1990,per 10CFR26.Success of Program Evident in Statistical Data Indicating Extremely Low Incident Rate1990-08-29029 August 1990 Forwards fitness-for-duty 6-month Rept for Period Ending June 1990,per 10CFR26.Success of Program Evident in Statistical Data Indicating Extremely Low Incident Rate ML20028G8591990-08-27027 August 1990 Forwards Updated Svc List to Be Used for Licensee Correspondence.Requests That Author Be Primary Addressee for All Correspondence Re Plant AECM-90-0144, Forwards Security Boundary Upgrade Bimonthly Status Rept for Period Ending 900731,per 900330 Commitment.Rept Covering Period 900801-0930 Will Be Submitted in Oct 19901990-08-22022 August 1990 Forwards Security Boundary Upgrade Bimonthly Status Rept for Period Ending 900731,per 900330 Commitment.Rept Covering Period 900801-0930 Will Be Submitted in Oct 1990 ML20056B3511990-08-20020 August 1990 Suppls Info Re 900806 Application for Amend to License NPF-29,changing Tech Specs on Alternate DHR Sys,Per NRC Comments.Proposed Tech Spec 3/4.5.2 Encl AECM-90-0147, Informs That Annual Emergency Preparedness Exercise for Facility Scheduled for Wk of 9108261990-08-14014 August 1990 Informs That Annual Emergency Preparedness Exercise for Facility Scheduled for Wk of 910826 AECM-90-0142, Forwards Supplemental Info Re 900705 Application for Amend to License NPF-29,revising Tech Specs Due to Addition of Alternate DHR Sys1990-08-0909 August 1990 Forwards Supplemental Info Re 900705 Application for Amend to License NPF-29,revising Tech Specs Due to Addition of Alternate DHR Sys AECM-90-0143, Notifies That Cd Bland No Longer Employed by Util,Effective 9007191990-08-0202 August 1990 Notifies That Cd Bland No Longer Employed by Util,Effective 900719 AECM-90-0139, Forwards Endorsement 68 to Nelia Policy NF-257,Endorsement 47 to Maelu Policy MF-106 & Revised Endorsement 35 to Maelu Policy MF-1061990-08-0202 August 1990 Forwards Endorsement 68 to Nelia Policy NF-257,Endorsement 47 to Maelu Policy MF-106 & Revised Endorsement 35 to Maelu Policy MF-106 ML20055J0551990-07-27027 July 1990 Forwards Summary of Environ Protection Program Re Const of Unit for 6-months Ending 900630,per Exhibit 2-A in Subsection 3.E.1 of CPPR-119 AECM-90-0136, Forwards Executed Amend 4 to Indemnity Agreement B-72,per NRC 891214 Request1990-07-27027 July 1990 Forwards Executed Amend 4 to Indemnity Agreement B-72,per NRC 891214 Request AECM-90-0130, Forwards Corrected Pages to Rev 17 to Physical Security Plan.Pages Withheld (Ref 10CFR73.21)1990-07-17017 July 1990 Forwards Corrected Pages to Rev 17 to Physical Security Plan.Pages Withheld (Ref 10CFR73.21) ML20044A9251990-07-0909 July 1990 Forwards Rev 1 to Relief Request I-00018 Correcting Valve Number & Description of One Component.Review & Approval Requested Prior to 901001 ML20044A7861990-06-29029 June 1990 Responds to NRC 900601 Ltr Re Violations Noted in Insp Rept 50-416/90-08.Corrective Actions:Operations Superintendent Counseled Individuals Re Inoperable Reactor Water Level Transmitter & Met W/All Shift Senior Reactor Operators AECM-90-0121, Withdraws 880831 & 890324 Proposed Amends,Deleting Certain Test,Vent & Drain Valves from Tech Spec Table 3.6.4-11990-06-27027 June 1990 Withdraws 880831 & 890324 Proposed Amends,Deleting Certain Test,Vent & Drain Valves from Tech Spec Table 3.6.4-1 AECM-90-0115, Forwards List of Followup Actions as Result of NRC Requalification Reexam of Three Licensed Operators on 900531.Lessons Learned Guideline Will Be Prepared Re Ability of Training Personnel to Evaluate Simulator Crew1990-06-26026 June 1990 Forwards List of Followup Actions as Result of NRC Requalification Reexam of Three Licensed Operators on 900531.Lessons Learned Guideline Will Be Prepared Re Ability of Training Personnel to Evaluate Simulator Crew ML20044A2931990-06-22022 June 1990 Responds to NRC Request for Addl Info Re Boraflex Gap Analysis.If Vibratory Ground Motion Exceeding OBE Occurs,Per 10CFR100,App a & as Previously Committed,Plant Will Be Shut Down.Listed Addl Surveillance Will Be Performed ML20043G6231990-06-14014 June 1990 Forwards Evidence That Cash Flow Would Be Available for Payment of Deferred Premium Obligation for Facility.Sys Energy Resources,Inc Responsible for Generating 90% of Required Cash Flow ML20043G3341990-06-11011 June 1990 Forwards Rev 9 to GGNS-TOP-1A, Operational QA Manual, for Evaluation ML20043G5861990-06-0808 June 1990 Forwards Bimonthly Status Repts Re Security Boundary Upgrade Project for Period Ending 900531 ML20043F5121990-06-0808 June 1990 Forwards List of Directors & Officers of Entergy Operations, Inc.Operation of All Plants Transferred to Entergy on 900606 ML20043E8011990-06-0707 June 1990 Forwards Nonproprietary ANF-90-060(NP), Criticality Safety Analysis for Grand Gulf Fuel Storage Racks W/ANF-1.4 Fuel Assemblies. ML20043E7831990-06-0707 June 1990 Forwards Updated Svc List to Be Used Re Plant Correspondence.Requests WT Cottle Be Primary Addressee for All Correspondence Concerning Plant ML20043E8161990-06-0606 June 1990 Informs That Sys Energy Resources,Inc Received Necessary Regulatory Approvals to Transfer Performance Activities for Facility to Entergy Operations & All Conditions in Amend 9 to CP CPPR-119 Implemented,Effective on 900606 ML20043F2061990-06-0606 June 1990 Forwards 1989 Annual Financial Repts for Sys Energy Resources,Inc & South Mississippi Electric Power Assoc ML20043E8111990-06-0606 June 1990 Informs That Sys Energy Resources,Inc Received Necessary Regulatory Approvals to Transfer Operating Responsibility for Facility to Entergy Operations & All Conditions in Amend 65 to License NPF-29 Implemented,Effective on 900606 ML20043C8611990-05-31031 May 1990 Forwards Preliminary Drafts of Plant Specific Tech Specs in Order to Facilitate NRC Validation of BWR Owners Group Improved Tech Specs,Per NRC Request.Understands That Util & NRC Will Meet During Wk of 900716 to Discuss NRC Review ML20043B6811990-05-24024 May 1990 Forwards Degraded Core Accident Hydrogen Control Program, Quarterly Status Rept for Jan-Mar 1990 ML20043B6021990-05-23023 May 1990 Confirms NRC Understanding That Safety Evaluation Will Be Written for Use of New Tech Spec 3.0.4 Flexibility Regardless of Plant Condition at Time Flexibility Required ML20043B2471990-05-18018 May 1990 Forwards Final Response to Generic Ltr 89-04, Guidance on Developing Acceptable Inservice Testing Programs & Rev 4 to Pump & Valve Inservice Testing Program. ML20043A9651990-05-17017 May 1990 Forwards Draft Tech Specs for Power Distribution Limits,Rcs, ECCS & Plant Sys as Part of Util Involvement W/Bwr Owners Group as BWR-6 Lead Plant ML20042G6931990-05-0909 May 1990 Forwards Rev 4 to Fire Hazards Analysis. Design Changes Include Installation of Alternate DHR Sys & Access Hatch in Pipe Chase ML20042G8681990-05-0909 May 1990 Forwards Response to Recommendations Re Areas of Concern Noted in NRC SER Dtd 900316 & 900316 Request for Addl Info Re Design Criteria for Cable Tray Supports in Turbine Bldg ML20042G6731990-05-0909 May 1990 Notifies of Cancellation of Emergency Plan Procedure 10-S-01-13, Onsite Radiological Monitoring. Info Incorporated Into Procedure 10-S-01-14,Rev 13, Radiological Monitoring. ML20042F4891990-05-0404 May 1990 Requests Extension of 90 Days to Provide Addl Time for Securities & Exchange Commission Review Re Implementation of Amend 65 to License NPF-29 ML20042F4441990-05-0404 May 1990 Forwards Response to Generic Ltr 89-19 Re USI A-47, Safety Implications of Control Sys in LWR Nuclear Power Plants. Plant Has Adequate Automatic Reactor Vessel Overfill Protection,Procedures & Tech Specs ML20042F1791990-04-30030 April 1990 Responds to NRC 900402 Ltr Re Violations Noted in Insp Rept 50-416/90-03.Corrective Actions:Valves Closed,Effectively Isolating Flow of Contaminated Water Into Makeup Water Sys & Demineralized Water Sys Flushed & Cleaned of Contamination ML20042F1811990-04-30030 April 1990 Responds to Generic Ltr 89-15, Emergency Response Data Sys. Util Volunteers to Participate in Emergency Response Data Sys ML20042F3711990-04-30030 April 1990 Forwards Certificate of Insurance for Nuclear Property Insurance Submitted by Nuclear Mutual Ltd for Policy Period 900401-910401 & Certificate of Insurance Evidencing Increased Excess Property Insurance,Per 900330 Ltr ML20042F1751990-04-30030 April 1990 Advises That Util Will Not Be Able to Provide Complete Supplemental Summary Rept on Dcrdr by 900430,as Indicated in Util 891221 Ltr.Supplemental Rept Will Be Submitted by 900930 ML20012F3311990-04-0202 April 1990 Forwards GE Affidavit Requesting That All Drawings Presently Denoted as Proprietary in Rev 4 to Updated FSAR Re Offgas Sys Should Remain Proprietary (Ref 10CFR2.790) ML20012E2961990-03-26026 March 1990 Forwards Updated Svc List for NRC Correspondence to Util. Facility Fee Bills Sent to Wrong Primary Addressee ML20011F2171990-02-23023 February 1990 Responds to NRC 900131 Ltr Re Violations Noted in Insp Rept 50-416/89-30.Corrective Actions:Quality Deficiency Rept Initiated to Document & Resolve Incident & Incident Rept & Reportable Events Procedure Enhanced 1990-09-08
[Table view] |
Text
. .
a-. .
MISSISSIPPI POWER & LIGHT COMPANY
)) Helping Build Mississippi M P. O . B OX 184 0. J AC K S O N, MIS SIS SIP PI 39215-1640 October 2, 1985 NUCLEAR LICEN$ LNG & SAFETY DEPARTMENT U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Washington, D. C. 20555 Attention: Mr. Harold R. Denton, Director
Dear Mr. Denton:
SUBJECT:
Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPF-29 File: 0260/0840/L-860.0 Response to Request for Additional Information AECM-85/0305
REFERENCE:
Letter to Mr. Harold R. Denton from Mr. O. D. Kingsley, Jr. ,
dated July 12, 1985 (AECM-85/0211).
Mississippi Power & Light (MP&L) submitted a proposed change to Technical Specification Figure 6.2.2-1 as Item 6 of the referenced letter. It was proposed to revise the subject figure to appoint two supervisors to the Unit Orr,anization's Radiation Control function.
During recent conversations with your staff, additional information was requested on the qualifications of the two proposed Radiation Control Supervisors. Attached are the resumes for two individuals selected by MP&L to fill these positions.
If any additional information is required, please contact my office.
Yours truly, O
8510080494 851002 I.. F. Dale PDR ADOCK 05000416 P PDR Director WEC/WJil/Silli:dmm Attachments: Resumes on John C. Vincelli & Thomas 0. Ilildebrant. f i l
()hl cc: (See Next Page) , }
J14AECM85091801 - 1 Member Middle South Utilities System
AECM-85/0305 Page 2 cc: Mr. J. B. Richard (w/a)
Mr. : R. B. McGehee- (w/a)
Mr. N. S. Reynolds (w/a)
Mr. H. L. Thomas (w/o)
Mr. R. C. Butcher (w/a)
Mr. James M. Taylor, Director (w/a)
Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Dr. J. Nelson Grace, Regional Administrator (w/a)
U. S. Nuclear Regulatory Commission Region II 101 Marietta St., N. W., Suite 2900 Atlanta, Georgia 30323 J14AECM85091801 - 2
NAME: John C. Vincelli BIRTHDATE: 1952 FORMAL EDUCATION AND TRAINING:
o Navy Nuclear Power Program This program included:
- 1. A three month training course in electrical theory, distribu-tion systems and repair of electrical equipment.
- 2. A six month basic nuclear power training program in math, nuclear physics, thermodynamics, radiation protection, chemistry controls, reactor theory, and plant systems.
- 3. An eight month training period at an operating Navy nuclear unit. This program included applied on-the-job training in the areas of plant operations, maintenance, radiation and chemistry controls. Several specialized training courses were conducted in such areas as equipment maintenance and repair techniques, applied ALARA methods, primary and secondary chemistry controls, and plant system operational interrelationships.
- 4. A three month Engineering Laboratory Technician (ELT) School.
This school consisted of formal classroom training in radio-logical protection and chemistry fundamentals and practical application techniques in the areas of exposure and contamina-tion controls, dosimetry, respiratory protection, shielding, ALARA reviews, radiological surveys, and chemistry controls.
o 110 Credit Hours College Approximately 65 credit hours in math, sciences, and engineering.
i One graduate-level course completed in Radiation Biology.
o General Electric BWR Radiological Engineering School This two month training course included BWR specific topics such as:
- 1. BWR radioactivity sources
- 2. Shielding
- 3. Applied external dosimetry techniques
- 4. Internal dosimetry
- 5. Radiation detection instrumentation PHPC JCV RESUME - 1
- 6. Counting statistics
- 7. Regulations
- 8. Radwaste shipping
- 9. Radiological survey techniques and RWPs
- 10. Air sampling techniques
- 11. BWR exposure and contamination control methods
- 12. Respiratory protection and engineering controls
- 13. Outage Health Physics planning
- 14. Radiological emergencies o Health Physics Training Program This three month training program consisted of basic Health Physics fundamentals and applied techniques for commercial power plant Health Physics technicians. It was conducted at Grand Gulf Nuclear Station, o Other Short Courses Completed
- 1. OSHA Respiratory Protection - I week
- 2. Respiratory Protection for Nuclear Power Plants - 1 week
- 3. BWR Systems - 4 weeks
- 4. Radwaste Shipping and Disposal - 2 weeks
- 5. Mitigation of Core Damage - 2 weeks
- 6. Supervisory Training - I week
- 7. Kepner Tregoe Problem Solving and Decision Making - I week EXPERIENCE 1973 - 1979 U. S. Navy Lead ELT (2 years) - Supervised the ship's radiological protection and chemistry programs. These programs included exposure and contamination control, radiological controls for plant maintenance and operational evolutions, dosimetry, respiratory protection, equipment decontamination, Radwaste, radiological survey instrumentation, training of ship's personnel, primary and secondary system chemistry controls, and radioactive material accountability. During this period I supervised the radiological protection program for an extended overhaul period.
ELT (1 year) - Responsible for the ship's dosimetry program, radio-active material accountability, instrumentation, and training of ship's personnel.
PHPC JCV RESUME - 2
.'. l l
l Radiation Controls Supervisor ( year) - While serving as Lead ELT and ELT. temporarily assigned to two steam generator inspection teams. Responsibilities included supervising the radiological controls for the performance of eddy current testing and plugging of steam generator tubes. Also, directly supervised the post-job plant and equipment decontamination effort.
Radiation Controls Monitor (3/4 year) - Responsibilities included providing radiological coverage for major nuclear repairs of submarines during extended repair periods and the shipping and disposal of Radwaste.
1980 - present Mississippi Power & Light Company Radiation Control Supervisor (3 years) - Responsible for the development and implementation of an effective radiological protection program at the Grand Gulf Nuclear Station. This program includes exposure and contamination control, dosimetry, respiratory protection, ALARA, emergency planning, Radwaste shipping and disposal, and radiological engineering. Directly responsible for the selection, training and qualification of a staff of up to 65 Health Physicists.
Site Emergency Planning Coordinator (1 year) - Developed GGNS's Emergency Plan Procedures and coordinated the successful completion of the station's first NRC Emergency Preparedness Appraisal and Exercise. Additional responsibilities included procurement of emergency supplies, establishment of onsite emergency facilities, and coordination of training programs.
Health Physicist ( year) - Responsible for the development of the respiratory protection program including procedural preparation and the purchase of equipment and supplies. During this period I was temporarily assigned to Hatch Nuclear Station for a two month training period during a major refueling outage.
PHPC JCV RESUME - 3
- . l NAME: Thomas 0. Hildebrandt BIRTHDATE: 1954 FORMAL EDUCATION AND TRAINING o Navy Nuclear Power Program This program included the following schools:
Machinist Mate A School - This training covered Basic Steam and Associated Fluid Systems, Tools, Maintenance, and Operation of the Mechanical Systems in a Steam Electric Plant.
Nuclear Power School - This six month course covered Basic Nuclear Plant Design, Operation, Shielding, Units of Radio-activity, Radiation Detection Equipment, Biological Effects of Radiation, Sources of Radiation, Radiation Surveys and Equipment, Contamination Control, Exposure Control, Radioactive Waste Disposal, and Radiological Casualty Control.
Naval Nuclear Power Training Unit - This six month Training Program consisted of completing the qualification as a Mechanical Operator and assuming responsibility of the various watchstations at an operational reactor facility.
o A. S. General Sciences, University of the State of New York - This Degree consists of 115 semester hours which were obtained through various methods while serving in the Navy during extended deployments.
o Health Physics Training Program - This three month training program consisted of Basic Health Physics fundamentals and Applied Techniques for Health Physics personnel and was conducted at Grand Gulf Nuclear Station.
o Applied Health Physics Training, Oakridge, TN - This five week course covered atomic and nuclear structure, modes of radioactive decay, laboratory techniques, rates of radio-active decay, charged particle interactions, gas filled radiation detectors, electronics pulse formatien and processing, counting statistics, gamma ray emission, photon interactions, detection limits, radiation biology, acute effects of radiation, air sampling equipment, scintillation detectors, gamma ray spectroscopy, radiation shielding, dosimetry and personnel monitoring, ionization radiation detectors, delayed effects of radiation, transient and secular equilibrium, transportation regulations, glove boxes and hot cells, internal dosimetry, radiation accidents, personnel decontamination, semiconductor detectors, sealed source design, respiratory protection, waste disposal, low level waste burial, neutron activation, neutron shielding, fission and criticality, and the nuclear fuel cycle.
PHPC TOH RESUME - 1
EXPERIENCE:
o U. S. Navy (May 1972 - May 1980)
U.S.S Von Steuben (SSBN 632) - Qualified as Mechanical Operator on all watchstations through Engineeroom Supervisor including completion of the ELT Qualcard during this 4 year tour of duty. Perfo rmed routine and corrective maintenance of Reactor and Secondary systems during operation and maintenance shutdowns.
U.S.S. Fulton (AS-11) - Qualified as Radiation Control Supervisor and was assigned Leading Duty Officer during this two year tour of duty. Responsibilities included providing Health Physics coverage for major nuclear repairs during extended repair periods for ten fast attack submarines. These repairs included steam generator inspections and replacement of various plant components. As Leading Petty Officer responsibilities included scheduling of personnel, assignment of work, and direct supervision of approximately 30 personnel.
U.S.S. Shark (SSN-591) - Qualified as Engineeroom Supervisor during this five month deployment. As M Division Leading Petty Officer responsibilities included direct supervision of approximately twenty mechanical operators through all aspects of plant operations and maintenance, o Mississippi Power & Light Company Senior Health Physicist - (June 1980 - November 1982) Assigned responsibility for the Radiation Dosimetry Section of Health Physics, duties included the preparation and implementation of the necessary directives for the successful operation of a complete external dosimetry program, utilizing a computer data base to maintain the necessary records and generate reports. Also responsible for the procurement and setup of the required equipment for the Dosimetry System including the development of the software specifications, implementation, and testing.
Health Physics Supervisor - (November 1982 present) Responsible for coordinating, developing, and organizing the activities of the Health Physics Lab with approximately forty Health Physics personnel. These activities include program development, selection and procurement of equipment, radiological and non-radiological air sampling and monitoring, first aid, radioactive source accountability and management, routine radiation surveys.
Administration of the Radiation Work Permit Program, Daily Dosimetry and Exposure Tracking, ALARA Reviews, and Radiological Work coverage for all aspects of plant operation and maintenance from startup through commercial operation.
PHPC T0H RESUME - 2