Letter Sequence Other |
|---|
|
Results
Other: AECM-85-0303, Proposed Tech Specs,Changing Table 3.3.7.4-1, Remote Shutdown Sys Controls by Deleting Item 20, RHR to RCIC Head Spray Line, AECM-85-0350, Discusses Util Commitments Resulting from Proposed Tech Spec Changes Re Acceptable High/Low Pressure Boundary Design for RHR Headspray Line.Handswitches Will Be Removed from Remote Shutdown Panel for Valves E12-F023 & E12-F394, ML20133P171, ML20135E723, ML20135G134, ML20136B957, ML20138H894, ML20138J716
|
MONTHYEARML20133P1711985-08-12012 August 1985 Proposed Tech Specs,Reflecting Design Changes & Editorial Clarification Re Leak Rate Testing of RHR to Head Spray Isolation Valve & ECCS Actuation Instrumentation Project stage: Other AECM-85-0228, Application for Amend to License NPF-29,changing Tech Specs to Reflect Design Changes & Editorial Clarifications.Fee Paid1985-08-12012 August 1985 Application for Amend to License NPF-29,changing Tech Specs to Reflect Design Changes & Editorial Clarifications.Fee Paid Project stage: Request ML20135E7231985-08-30030 August 1985 Notice of Violation from Insp on 850708-12 Project stage: Other AECM-85-0263, Forwards Application for Amend to License NPF-29,requesting one-time Tech Spec Exception for Qualifications of Replacement Individual for Chemistry/Radiation Control Superintendent Position.Fee Paid1985-09-13013 September 1985 Forwards Application for Amend to License NPF-29,requesting one-time Tech Spec Exception for Qualifications of Replacement Individual for Chemistry/Radiation Control Superintendent Position.Fee Paid Project stage: Request ML20135G1341985-09-13013 September 1985 Proposed Tech Specs Reflecting one-time Exception for Qualifications of Replacement Individual for Chemistry/ Radiation Control Superintendent Position Project stage: Other ML20135G1291985-09-13013 September 1985 Application for Amend to License NPF-29,requesting one-time Tech Spec Exception for Qualifications of Replacement Individual for Chemistry/Radiation Control Superintendent Position Project stage: Request AECM-85-0303, Proposed Tech Specs,Changing Table 3.3.7.4-1, Remote Shutdown Sys Controls by Deleting Item 20, RHR to RCIC Head Spray Line1985-09-13013 September 1985 Proposed Tech Specs,Changing Table 3.3.7.4-1, Remote Shutdown Sys Controls by Deleting Item 20, RHR to RCIC Head Spray Line Project stage: Other ML20135F1051985-09-13013 September 1985 Application for Amend to License NPF-29,changing Tech Spec Table 3.3.7.4-1, Remote Shutdown Sys Controls, by Deleting Item 20, RHR to RCIC Head Spray Line. Fee Paid Project stage: Request AECM-85-0305, Forwards Resumes of Two Individuals Appointed as Supervisors to Organization Radiation Control Function,Per Request for Addl Info Re 850712 Proposed Change to Tech Spec Figure 6.2.2.-11985-10-0202 October 1985 Forwards Resumes of Two Individuals Appointed as Supervisors to Organization Radiation Control Function,Per Request for Addl Info Re 850712 Proposed Change to Tech Spec Figure 6.2.2.-1 Project stage: Request AECM-85-0346, Application for Amend to License NPF-29,revising Tech Spec 6.3.1 for one-time Exception of Reg Guide 1.8 Re Qualifications of Chemistry/Radiation Control Superintendent1985-10-23023 October 1985 Application for Amend to License NPF-29,revising Tech Spec 6.3.1 for one-time Exception of Reg Guide 1.8 Re Qualifications of Chemistry/Radiation Control Superintendent Project stage: Request ML20138J7161985-10-23023 October 1985 Proposed Tech Spec 6.3.1 for one-time Exception of Reg Guide 1.8 Re Qualifications of Chemistry/Radiation Control Superintendent Project stage: Other ML20138J7011985-10-24024 October 1985 Forwards Application for Amend to License NPF-29,revising Tech Spec 6.3.1 for one-time Exception of Reg Guide 1.8 Re Qualifications of Chemistry/Radiation Control Superintendent.Fee Paid Project stage: Request AECM-85-0350, Discusses Util Commitments Resulting from Proposed Tech Spec Changes Re Acceptable High/Low Pressure Boundary Design for RHR Headspray Line.Handswitches Will Be Removed from Remote Shutdown Panel for Valves E12-F023 & E12-F3941985-10-30030 October 1985 Discusses Util Commitments Resulting from Proposed Tech Spec Changes Re Acceptable High/Low Pressure Boundary Design for RHR Headspray Line.Handswitches Will Be Removed from Remote Shutdown Panel for Valves E12-F023 & E12-F394 Project stage: Other ML20136B9571985-11-0808 November 1985 Amend 7 to License NPF-29,modifying Tech Specs Re Valves Listed in Tables 3.3.7.4-1,3.6.4-1 & 4.3.2-1 & Electrical Protective Devices in Tables 3.8.4.1-1 & 3.8.4.2-1 Project stage: Other AECM-85-0404, Application for Amend to License NPF-29,revising Tech Spec 6.3.1 to Allow one-time Exception Re Qualifications of Chemistry/Radiation Control Superintendent1985-12-11011 December 1985 Application for Amend to License NPF-29,revising Tech Spec 6.3.1 to Allow one-time Exception Re Qualifications of Chemistry/Radiation Control Superintendent Project stage: Request ML20138H8941985-12-11011 December 1985 Proposed Tech Spec,Allowing one-time Exception Re Qualifications of Chemistry/Radiation Control Superintendent Project stage: Other 1985-11-08
[Table View] |
Text
ENCLOSURE 1 NOTICE OF VIOLATION Mississippi Power and Light Company Docket No. 50-416 Grand Gulf License No. NPF-29 The following violation was identified during an inspection conducted on July 8-12, 1985. The Severity Level was assigned in accordance with the NRC Enforcement Policy (10 CFR Part 2, Appendix C).
10 CFR 20.201(b)(2) required the licensee to make or cause to be made such surveys as may be necessary for the licensee to comply with the regulations in this part and are reasonable under the circumstances to evaluate the extent of radiation hazards that may be present.
10 CFR 20.201(a) defines survey as an evaluation of the radiation hazards incident to the production, i
use, release, disposal or presence of radioactive materials under a specific set of ' conditions.
10 CFR 20.103(a)(3) required the licensee to use suitable measurements of concentrations of radioactive materials in air for detecting and evaluating airborne radioactivity in restricted areas.
10 CFR 20.401(b) required that each licensee maintain records showing the results of surveys required by 10 CFR 20.201(b).
Technical Specification 6.11 required that procedures for personnel radiation protection shall be approved, maintained and adhered to for all operations involving personnel radiation exposure.
Contrary to the above, the licensee failed to adhere to NRC requirements on June 21, 1985, during maintenance of the transverse incore probes in that:
a.
air samples collected on June 21, 1985, were not analyzed to determine the concentration of airborne radioactivity in the transverse incore probe drive area prior to permitting individuals to work in the area; b.
the licensee failed to document beta radiation surveys performed inside the "E" TIP drive box on June 21, 1985, to demonstrate compliance with licensee administrative controls and NRC exposure limits; and c.
radiation protection procedures were not followed.
Specifically:
(1) The health physics technician providing job coverage for the TIP drive work failed to wear all of the protective clothing specified by the applicable radiation work permit as required by plant procedure 08-S-01-24.
(2) A high contamination area was not established in the TIP area when the contamination levels exceeded 10,000 dpm/100 cm2 as required by plant procedure 08-S-01-20.
I 0509170009 850830 PDR ADOCK 05000416 i
O PDR l
- Mississippi Power and Light Company 2
Docket No. 50-416 Grand Gulf License No. NPF-29 (3) Eight of twelve licensee personnel who entered the TIP area failed to wear an alarming dosimeter specified by the applicable radiation work permit as required by plant procedures 01-S-08-3 and 08-5-01-24.
This is a Severity Level IV violation (Supplement IV).
Pursuant to 10 CFR 2.201, you are required to submit t*,
this office within 30 days of the date of this Notice, a written statement or explanation in reply, including:
(1) admission or denial of the alleged violations; (2) the reasons for the violations if admitted; (3) the corrective steps which have been taken and the results achieved; (4) corrective steps which will be taken to avoid further violations; and (5) the date when full compliance will be achieved.
Security or safeguards information should be suomitted as an enclosure to facilitate withholding it from public disclosure as required by 10 CFR 2.790(d) or 10 CFR 73.21.
Date:
F L