Other: AECM-82-492, Requests That License Condition 2.C.(44)(i)(a) Be Revised to Require Submittal Re Automatic Depressurization Sys Logic Mods by 821215.Previous Submittal Date of 821029 Erroneously Requested Due to Revised BWR Owners Group Schedule, AECM-82-603, Comments on BWROG-8260, NUREG-0737,Item II.K.3.18,Mod of Automatic Depressurization Sys Logic. Option 4,providing Bypass Timer Delay,Will Assure Adequate Core Cooling During Worst Case Conditions, AECM-85-0014, Forwards Addl Info,Requested in ,Re Concerns Involving Transfer of Control to Remote Shutdown Panel Resulting in Change in Operating Status of Load That May Be Detrimental to Safe Shutdown, AECM-85-0341, Forwards Addl Info Re ECCS Performance Analysis Which Supports Increase in Peak Cladding Temp of 51 F Compared to Current FSAR Analysis,Per Request.Fsar Changes Will Be Made If Design Change Implemented, AECM-86-0006, Forwards Technical Justification for Proposal to Delete Peak Recording Accelerographs Currently Installed on Reactor Piping Locations,Per Section 16.3.1 of Sser 6 (NUREG-0831).Response by 860228 Requested.Fee Paid, AECM-86-0329, Submits List of Affected Tech Spec Pages,Effective Dates & Associated Amend Numbers,In Response to NRC 860827 & 1006 Requests, AECM-86-0332, Advises of Effective Dates for Amends 6 & 8 to License NPF-29 for Listed Tech Specs,In Response to 851021 & 860827 Requests, ML20133P171, ML20154R546, ML20209D136, ML20209D152, ML20210L795, ML20215E405
|
MONTHYEARAECM-82-492, Requests That License Condition 2.C.(44)(i)(a) Be Revised to Require Submittal Re Automatic Depressurization Sys Logic Mods by 821215.Previous Submittal Date of 821029 Erroneously Requested Due to Revised BWR Owners Group Schedule1982-10-21021 October 1982 Requests That License Condition 2.C.(44)(i)(a) Be Revised to Require Submittal Re Automatic Depressurization Sys Logic Mods by 821215.Previous Submittal Date of 821029 Erroneously Requested Due to Revised BWR Owners Group Schedule Project stage: Other AECM-82-603, Comments on BWROG-8260, NUREG-0737,Item II.K.3.18,Mod of Automatic Depressurization Sys Logic. Option 4,providing Bypass Timer Delay,Will Assure Adequate Core Cooling During Worst Case Conditions1982-12-14014 December 1982 Comments on BWROG-8260, NUREG-0737,Item II.K.3.18,Mod of Automatic Depressurization Sys Logic. Option 4,providing Bypass Timer Delay,Will Assure Adequate Core Cooling During Worst Case Conditions Project stage: Other AECM-85-0014, Forwards Addl Info,Requested in ,Re Concerns Involving Transfer of Control to Remote Shutdown Panel Resulting in Change in Operating Status of Load That May Be Detrimental to Safe Shutdown1985-01-17017 January 1985 Forwards Addl Info,Requested in ,Re Concerns Involving Transfer of Control to Remote Shutdown Panel Resulting in Change in Operating Status of Load That May Be Detrimental to Safe Shutdown Project stage: Other AECM-85-0228, Application for Amend to License NPF-29,changing Tech Specs to Reflect Design Changes & Editorial Clarifications.Fee Paid1985-08-12012 August 1985 Application for Amend to License NPF-29,changing Tech Specs to Reflect Design Changes & Editorial Clarifications.Fee Paid Project stage: Request ML20133P1711985-08-12012 August 1985 Proposed Tech Specs,Reflecting Design Changes & Editorial Clarification Re Leak Rate Testing of RHR to Head Spray Isolation Valve & ECCS Actuation Instrumentation Project stage: Other AECM-85-0304, Application for Amend to License NPF-29,supplementing 850812,23 & 30 Submittals,To Provide Justification for Exemption from Tech Spec 6.3.1 & 6.4.1 Requirements for Senior Reactor Operator Qualifications1985-09-25025 September 1985 Application for Amend to License NPF-29,supplementing 850812,23 & 30 Submittals,To Provide Justification for Exemption from Tech Spec 6.3.1 & 6.4.1 Requirements for Senior Reactor Operator Qualifications Project stage: Supplement ML20133A7611985-09-25025 September 1985 Proposed Changes to Tech Specs 6.3.1 & 6.4.1,providing Justification for Exemption from Requirements for Senior Reactor Operator Qualifications Project stage: Request AECM-85-0306, Responds to Request for Addl Info Re 850812 Application for Amend to License NPF-29.Prompt Resolution of Questions & Approval of Previously Submitted Tech Specs Needed for Outage Scheduled to Start on 8510121985-10-0505 October 1985 Responds to Request for Addl Info Re 850812 Application for Amend to License NPF-29.Prompt Resolution of Questions & Approval of Previously Submitted Tech Specs Needed for Outage Scheduled to Start on 851012 Project stage: Request AECM-85-0341, Forwards Addl Info Re ECCS Performance Analysis Which Supports Increase in Peak Cladding Temp of 51 F Compared to Current FSAR Analysis,Per Request.Fsar Changes Will Be Made If Design Change Implemented1985-10-22022 October 1985 Forwards Addl Info Re ECCS Performance Analysis Which Supports Increase in Peak Cladding Temp of 51 F Compared to Current FSAR Analysis,Per Request.Fsar Changes Will Be Made If Design Change Implemented Project stage: Other ML20137Q8971985-11-22022 November 1985 Safety Evaluation Re Low Pressure ECCS Sys Pressure Permissive Interlocks.Exceeding ASME Code Allowable Design Pressure for Interlocks Unacceptable Project stage: Approval ML20137Q8901985-11-22022 November 1985 Forwards Safety Evaluation Re 850812 Request for Amend to License NPF-29,adding Pressure Permissive Interlocks to Control Circuits for Low Pressure ECCS Injection Valves,Item 13 of 850812 Request Should Be Revised Project stage: Approval AECM-86-0006, Forwards Technical Justification for Proposal to Delete Peak Recording Accelerographs Currently Installed on Reactor Piping Locations,Per Section 16.3.1 of Sser 6 (NUREG-0831).Response by 860228 Requested.Fee Paid1986-01-10010 January 1986 Forwards Technical Justification for Proposal to Delete Peak Recording Accelerographs Currently Installed on Reactor Piping Locations,Per Section 16.3.1 of Sser 6 (NUREG-0831).Response by 860228 Requested.Fee Paid Project stage: Other AECM-86-0082, Supplemental Application for Amend to License NPF-29, Modifying 851114 Proposed Change Re License Condition 2.C.(28) & Revising Tech Specs Concerning Design Changes to Be Implemented During First Refueling Outage.Fee Paid1986-03-21021 March 1986 Supplemental Application for Amend to License NPF-29, Modifying 851114 Proposed Change Re License Condition 2.C.(28) & Revising Tech Specs Concerning Design Changes to Be Implemented During First Refueling Outage.Fee Paid Project stage: Supplement ML20154R5461986-03-21021 March 1986 Proposed Tech Specs Revising License Condition 2.C.(28) Re Requirement for Corporate Mgt Officials on Nuclear Operations Staff & Modifying Tables 3.3.7.2-1 & 4.3.7.2-1 to Reflect Design Change Project stage: Other ML20155D8101986-04-0808 April 1986 Summary of 860401 Meeting W/Utils Re Resolution of Issue of Interlocks for ECCS Injection Valves Which Also Function as Pressure Isolation Valves.Viewgraphs & List of Attendees Encl Project stage: Meeting ML20205S2021986-05-27027 May 1986 Forwards Safety Evaluation Supporting Util 860110 Proposal to Remove Four Peak Recording Accelerographs Installed on Reactor Piping Due to Inoperability Caused by Operating Transients & Adequacy of Other Seismic Instrumentation Project stage: Approval ML20205S2151986-05-27027 May 1986 Safety Evaluation Supporting Util 860110 Proposal to Remove Four Peak Recording Accelerographs Mounted on Reactor Piping Project stage: Approval AECM-86-0163, Provides Addl Info to 860321 Proposed Change PCOL-86/04 to License NPF-29 Re Mods to Automatic Depressurization Sys Per BWR Owners Group Evaluation of NUREG-0737,Item II.K.3.18. Info Clarifies Changes Made to Sys Initiation Circuitry1986-05-30030 May 1986 Provides Addl Info to 860321 Proposed Change PCOL-86/04 to License NPF-29 Re Mods to Automatic Depressurization Sys Per BWR Owners Group Evaluation of NUREG-0737,Item II.K.3.18. Info Clarifies Changes Made to Sys Initiation Circuitry Project stage: Request AECM-86-0111, Forwards Supplemental Info Re Design Change to Add Interlocks to ECCS Injection Valves,Per NRC 860403 Telcon. Approval of 850812 Proposed Amend to Tech Specs Also Requested1986-05-30030 May 1986 Forwards Supplemental Info Re Design Change to Add Interlocks to ECCS Injection Valves,Per NRC 860403 Telcon. Approval of 850812 Proposed Amend to Tech Specs Also Requested Project stage: Supplement ML20207E7261986-07-15015 July 1986 Proposed Changes to Tech Spec Seismic Monitoring Instrumentation Tables 3.3.7.2-1 & 4.3.7.2-1 to Delete four- Peak Recording Accelerographs on Reactor Piping & Make Measurement Values Consistent Project stage: Request AECM-86-0208, Forwards Addl Info Re Emergency Containment Venting in Response to Item 1.1 of 860527 Request.Encl Rev 1 to ...Emergency Procedures Upgrade Program Procedures Generation Package Addresses Remaining Request1986-07-15015 July 1986 Forwards Addl Info Re Emergency Containment Venting in Response to Item 1.1 of 860527 Request.Encl Rev 1 to ...Emergency Procedures Upgrade Program Procedures Generation Package Addresses Remaining Request Project stage: Request AECM-86-0221, Application for Amend to License NPF-29,changing Tech Spec Seismic Monitoring Instrumentation Tables to Delete four- Peak Recording Accelerographs on Reactor Piping & Make Measurement Values Consistent.Fee Paid1986-07-15015 July 1986 Application for Amend to License NPF-29,changing Tech Spec Seismic Monitoring Instrumentation Tables to Delete four- Peak Recording Accelerographs on Reactor Piping & Make Measurement Values Consistent.Fee Paid Project stage: Request ML20209D1521986-08-28028 August 1986 Notice of Consideration of Issuance of Amend to License NPF-29 & Proposed NSHC Determination & Opportunity for Hearing Re Addition of Specs to Table 3.3.3-1, ECCS Actuation Instrumentation Project stage: Other ML20210L7951986-08-28028 August 1986 Notice of Consideration of Issuance of Amend to License NPF-29 & Proposed Nhsc Determination & Opportunity for Hearing Re 850812,0925,1005 & 22 Requests for Revs to Listed Tech Spec Tables on ECCS Actuation Instrumentation Project stage: Other ML20209D1361986-09-0202 September 1986 Requests Notice of Consideration of Issuance of Amend to License NPF-29 & Proposed NSHC Determination & Opportunity for Hearing Re Addition of Specs to Table 3.3.3-1, ECCS Actuation Instrumentation Be Expeditiously Published in Fr Project stage: Other ML20215E4051986-10-0606 October 1986 Amend 20 to License NPF-29,revising Tech Specs to Reflect Installation of Pressure Interlocks for Injection Valves in Low Pressure ECCS & Mod to Automatic Depressurization Sys Actuation Logic Project stage: Other ML20215E4131986-10-0606 October 1986 Safety Evaluation Supporting Amend 20 to License NPF-29 Project stage: Approval AECM-86-0329, Submits List of Affected Tech Spec Pages,Effective Dates & Associated Amend Numbers,In Response to NRC 860827 & 1006 Requests1986-10-14014 October 1986 Submits List of Affected Tech Spec Pages,Effective Dates & Associated Amend Numbers,In Response to NRC 860827 & 1006 Requests Project stage: Other AECM-86-0332, Advises of Effective Dates for Amends 6 & 8 to License NPF-29 for Listed Tech Specs,In Response to 851021 & 860827 Requests1986-10-17017 October 1986 Advises of Effective Dates for Amends 6 & 8 to License NPF-29 for Listed Tech Specs,In Response to 851021 & 860827 Requests Project stage: Other 1986-10-14
[Table View] |
Text
F.
SEP 2M Docket Nos. 50-416/417 Director, Office of the Federal Register 1100 L Street, N.W.
Washington, D. C.
20403
Dear Director:
This is a request to expedite the publishing of the enclosed Federal Register Notice for the Nuclear Regulatory Commission. The notice was hand carried to the NRC Coordinator for these notices on August 23 at 5:00 p.m.
We understand our contract carrier failed to pick up the notice on Friday August 29, 1986.
If this notice is not published by Wednesday, September 3, 1986, so the 30 day notice period expires Friday, October 3,1986, the result would be unneces-sary delays in restarting the plant, which would not be in the best interest of the public. The ECCS interlock instrumentation involved in the amendment must be installed and operable on Saturday, October 4,1986, so that the licensee may use the residual heat removal system (of which the interlocks are a part) for decay heat removal during the first refueling outage.
Resched-uling work involving these interlocks will prolong the outage and delay restart of the plant.
Thank you for your cooperation in this matter.
Sincerely, CrtgLvst signed by Walter R. Butler, Director BWR Project Directorate No. 4 Division of BWR Licensing
Enclosure:
DISTRIBUTION Federal Register Notice LDocket f.ile.'
for Grand Gulf Unit 1 NRC PDR LPDR PD#4 Rdg.
RBernero M0'Brien LKintner Young,0GC(Bethesda)
ACRS(10)
((
PD#4/PM PD#4/D LKintner:1b WButler N 09/.1./86 09/L/86 e609090207 060902 ADOCK0500g6 DR