MONTHYEARML20086G2701976-01-0808 January 1976 AO 75-79:on 751229,local Leak Test Identified through- Leakage of B Loop RHR Torus Spray Valve MO-3-10-38B & Torus Cooling Return Valve MO-3-10-34B.Cause Under Investigation ML20086G2721976-01-0505 January 1976 AO 75-78:on 751226,drywell Radiation Monitor Inoperative. Caused by Flow Blockage in on Stream Sample Line.Sample Point Changed to Reestablish Sample Flow to Drywell Radiation Monitor ML20086G2741975-12-30030 December 1975 AO 75-76:on 751220-21,local Leak Rate Test Identified through-leakage on Loop a & B RHR Outboard Injection Valves MO-3-10-154A & B.Cause Not Determined.Inboard Isolation Valves Verified as Leaktight & Closed ML20086H0411975-12-0505 December 1975 AO 75-72:on 751126,core Spray 3A Full Flow Test Valve MO-3-14-26A Failed to Close.Caused by Broken Wire on Closing Torque Switch in Valve Operator.Broken Wire Repaired & Proper Valve Operator Verified ML20086F8431975-12-0505 December 1975 AO 75-77:on 751126,LS-4223 Failed to Operate RHR Head Spray Line High Point Vent SV-4223 on Low Accumulator Level.Caused by Blown Fuse in Solenoid Valve Circuit.Grounded Wire Repaired & Vent Valve Returned to Svc ML20086F8491975-12-0101 December 1975 Telecopy AO 75-77:on 751126,LS-4223 Failed to Operate SV-4223 on Low Accumulator Level.Caused by Blown Fuse in Solenoid Valve Circuit.Operator Manually Vented Accumulator to Ensure Head Spray Line Maintained Filled ML20086F8711975-11-26026 November 1975 AO 75-75:on 751117,reservoirs of Two Hydraulic Snubbers Found Empty.Caused by Leaking O-rings & Gaskets.Defective gaskets,seals,O-rings & Fittings Will Be Replaced & Snubbers Will Be Checked ML20086F8551975-11-26026 November 1975 AO 75-76:on 751117,rigid Pipe Support Found Broken on RHR Shutdown Cooling Suction Line.Caused by Component Failure. Pipe Support Replaced.Investigation Continuing ML20086F8801975-11-26026 November 1975 AO 75-74:on 751116,setpoint of RCIC Steam Supply Line Area High Temp Switch TE-TS 4939A Found Less Conservative than Specified by Tech Specs.Caused by Slight Setpoint Drift. Switch Recalibr,Tested & Returned to Svc ML20086H0461975-11-26026 November 1975 Telecopy AO 75-72:on 751126,core Spray Full Flow Test Valve MO-3-14-26A Failed to Close.Caused by Broken Wire on Closing Torque Switch in Valve Operator.Broken Wire Repaired & Proper Valve Operation Verified ML20086F8961975-11-21021 November 1975 AO 75-73:on 751113,leak Observed on RHR Sys Relief Valve RV-35B.Caused by Throttling of MO-2-10-154B Valve Resulting in Crack.Weld Repairs Will Be Made to Relief Valve in Accordance W/Approved Procedures ML20086F8611975-11-18018 November 1975 Telecopy AO 75-76:on 751117,rigid Pipe Support Found Broken on RHR Shutdown Cooling Suction Line.Cause Under Investigation.Corrective Action to Be Determined After Investigation ML20086F8741975-11-18018 November 1975 Telecopy AO 75-75:on 751117,two Outside Drywell Snubbers Found to Have Empty Reservoirs.Cause Under Investigation. Corrective Action to Be Determined After Investigation ML20086F8901975-11-17017 November 1975 Telecopy AO 75-74:on 751116,setpoint of RCIC Steam Supply Line High Temp Switch TE-TS 4939A Found Less Conservative than Allowed by Tech Specs.Caused by Slight Setpoint Drift. Switch Recalibr & Returned to Svc ML20086F9061975-11-17017 November 1975 AO 75-71:on 751107,cracked Weld on 1-inch Line to Relief Valve RV-35B Observed.Caused by Throttling MO-2-10-154B Resulting in Cracked Weld.Repairs Completed in Accordance W/Approved Procedure ML20086F9181975-11-14014 November 1975 AO 75-70:on 751104,reservoirs of Five Hydraulic Snubbers Found Empty.Caused by Leaking O-rings & Gaskets.Defective Gaskets & O-rings Will Be Replaced ML20086F9021975-11-14014 November 1975 Telecopy AO 75-73:on 751113,leak on Body of RV-35B RHR Sys Relief Valve Observed.Caused by Throttling of MO-2-10-154B Valve Resulting in Crack.Rhr Loop B Shut Down in Preparation for Repair of Relief Valve ML20086F9111975-11-10010 November 1975 Telecopy AO 75-71:on 751107,cracked Weld on Line to RV-35B Observed.Caused by Throttling Down on MO-2-10-154B Resulting in Weld Crack.Repairs Completed.Pipe Vibration Readings Taken to Determine If Mods Required ML20086H0521975-11-0707 November 1975 AO 75-71:on 751030,drywell Oxygen Analyzer Sample Sys Outer Isolation Valve SV-3978B Failed.Caused by Dirt on Seat & in Body of Valve.Valve Internals & Seat Cleaned.Valve Disc, Piston Rings & Bonnet O-ring Replaced ML20086F9231975-11-0505 November 1975 Telecopy AO 75-70:on 751104,reservoirs of Five Hydraulic Snubbers Found Empty.Cause Under Investigation.Corrective Action to Be Determined After Investigation ML20086H0621975-11-0303 November 1975 AO 75-70:on 751024,drywell Purge Supply Isolation Valve A0-3520 Operated W/O Manual Initiation.Caused by Incorrect Implementation of Mod.Piping Corrected & Will Be Monitored ML20086H0751975-10-31031 October 1975 AO 75-68:on 751021,torus Makeup Supply Isolation Valve AO-3523 Found to Leak in Excess of 2,000 Cc/Minute.Caused by Closing Spring Not Providing Sufficient Force to Fully Close Valve.Closing Spring Adjusted ML20086H0561975-10-31031 October 1975 Telecopy AO 75-71:on 751030,isolation Valve SV 3978B Failed. Cause Under Investigation.Corrective Action to Be Determined ML20086F9291975-10-31031 October 1975 AO 75-69:on 751021,nitrogen Found to Leak Out of Test Connection on Inboard Flange of AO-2519.Caused by Use of Wrong Connection for Testing Double O-ring Seal.Connection Capped & Leak Checked Successfully ML20086H0851975-10-31031 October 1975 AO 75-67:on 751021,torus Makeup Supply Isolation Check Valve 276Y Found Leaking in Excess of 2,000 Cc/Minute.Caused by Valve Piston Being Hung Up During Operation.Check Valve Repaired & Local Rate Test Repeated ML20086F9381975-10-31031 October 1975 AO 75-68:on 751021,O-ring Gasket Leak Discovered on Torus Purge Supply Valve AO-2521B.Caused by Use of Improper Connection for Testing Double O-ring Seal.Connection Capped & Leak Checked Successfully ML20086F9521975-10-30030 October 1975 AO 75-66:on 751020,APRM B Flow Bias Signal Failed Upscale. Caused by Internal Ground in Channel Flow Transmitter D Combined W/Installed Instrument Loop Ground,Lowering Total Loop Resistance.Defective Components Replaced ML20086F9661975-10-24024 October 1975 AO 75-65:on 751015,setpoints on Reactor High Pressure Scram Switches Found Less Conservative than Specified by Tech Specs.Caused by Instrument Setpoint Shift.Channel D Switch Recalibr,Tested & Returned to Svc ML20086H0741975-10-24024 October 1975 Telecopy AO 75-69:on 751023,O-ring Gasket Leak Found on Drywell Purge Supply Valve AO-3505.Cause Under Investigation.Corrective Action to Be Determined After Investigation ML20086H0681975-10-24024 October 1975 Telecopy AO 75-70:on 751024,drywell Purge Supply Isolation Valve AO-3520 Operated W/O Manual Initiation.Caused by Incorrect Implementation of Mod.Valve Failed Closed & Will Be Repaired ML20086F9331975-10-21021 October 1975 Telecopy AO 75-69:on 751021,O-ring Gasket Leak Discovered on Drywell & Torus Inerting Nitrogen Supply Valve AO-2519.Cause Under Investigation.Corrective Action to Be Determined After Investigation ML20086F9491975-10-21021 October 1975 Telecopy AO 75-67:on 751021,diesel Generator Breaker E-4 Inoperable.Caused by Inoperative Charging Motor Failing Due to Brush Wear.Breaker Replaced ML20086H0901975-10-21021 October 1975 Telecopy AO 75-67:on 751021,torus Makeup Supply Isolation Check Valve 276Y Found Leaking in Excess of 2,000 Cc/Minute. Cause Under Investigation.Corrective Actions to Be Determined After Investigation ML20086H0811975-10-21021 October 1975 Telecopy AO 75-68:on 751021,torus Makeup Sys Isolation Valve AO-3523 Found to Leak in Excess of 2,000 Cc/Minute.Cause Under Investigation.Corrective Action to Be Determined After Investigation ML20086F9581975-10-21021 October 1975 Telecopy AO 75-66:on 751020,logic Aprm/Rbm B Flow Bias Signal from FT-2-2-110D Failed Upscale.Caused by Failure of Second Ground on Recirculation Drive Flow Transmitter Signal Loop.Flow Signal Corrected ML20086F9441975-10-21021 October 1975 Telecopy AO 75-68:on 751021,leak Found on O-ring Gasket on Torus Purge Supply Valve AO 2521A.Cause Under Investigation. Corrective Action to Be Determined After Investigation ML20086H0961975-10-16016 October 1975 AO 75-66:on 751006,RCIC Inboard Steam Supply Isolation Valve MO-3-13-15 Failed to Close.Cause Not Identified.Valve Stroked Successfully.Failure Not Repeatable ML20086F9701975-10-16016 October 1975 Telecopy AO 75-65:on 751015,setpoint on Reactor High Pressure Scram Switches Found to Be Less Conservative than Specified by Tech Specs.Caused by Instrument Setpoint Shift. Channel D Switch Recalibr,Tested & Returned to Svc ML20086H1061975-10-10010 October 1975 AO 75-65:on 751002,drywell Radiation Monitor Inoperable. Caused by Rust Blockage of Pressure Control Valve.Valve Cleaned,Reassembled & Returned to Svc ML20086F9811975-10-10010 October 1975 AO 75-64:on 751002,upper Isolation Valve to LS-2-3-231C Found Closed.Caused by Technician Error.Technicians Involved Interviewed & Seriousness of Error Stressed ML20086H1171975-10-0909 October 1975 AO 75-64:on 750929,main Steam Line High Flow Switch DPIS-3-2-116A Found to Trip at Value Slightly Higher than Tech Spec.Caused by Setpoint Shift.Device Checked for Setpoint Repeatability & Recalibr ML20086H1011975-10-0707 October 1975 Telecopy AO 75-66:on 751006,RCIC Inboard Steam Supply Isolation Valve MO-3-13-15 Failed to Close.Cause Under Investigation.Corrective Action to Be Determined After Investigation ML20086F9741975-10-0303 October 1975 Telecopy AO 75-65:on 751015,alarm Received Indicating Sampling Sys Exhaust Pump Suction Low.Cause Under Investigation.Corrective Action to Be Determined After Investigation ML20086H1111975-10-0303 October 1975 Telecopy AO 75-65:on 751002,drywell Radiation Monitor Inoperable.Cause Under Investigation.Corrective Action to Be Determined After Investigation ML20086F9861975-10-0303 October 1975 Telecopy AO 75-64:on 751002,upper Isolation Valve to LS-2-3-231C Found Closed.Caused by Technician Error. Technicians Involved Interviewed & Seriousness of Error Stressed ML20086F9891975-09-30030 September 1975 Telecopy AO 75-63:on 750929,outer Isolation Valves 86C & 86D Closed in 1.7 & 2.3 S,Respectively.Caused by Insufficient Hydraulic Fluid in Valve Actuator.Hydraulic Fluid Added & Adjustments Made to Closing Speed ML20086G4221975-09-30030 September 1975 AOs 50-277-75-62 & 50-278-75-61:on 750920,main Stack Flow Transmitters Failed.Caused by Lightning Strike.Damaged Components Replaced.Util Begun Study to Provide Permanent Resolution of Problem ML20086H1201975-09-29029 September 1975 Telecopy AO 75-64:on 750929,main Steam Line High Flow Switch DPIS-3-2-116A Found at Value Slightly Higher than Specified by Tech Spec.Caused by Setpoint Shift.Device Checked for Setpoint Repeatability & Recalibr ML20086H1301975-09-22022 September 1975 Telecopy AO 75-62:in 750921,RHR Head Spray Stay Fill Vent LS-5223 Found Inoperable.Caused by Binding in Switch Float Assembly.Stay Fill Tank Refilled & Switch Will Be Repaired ML20086G4261975-09-22022 September 1975 Telecopy AOs 50-277-75-62 & 50-278-75-61:on 750920,main Stack Flow Transmitters Failed.Caused by Lightning Strike. Damaged Components Replaced 1976-01-08
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217K9931999-10-14014 October 1999 Safety Evaluation Supporting Amend 234 to License DPR-56 ML20217B4331999-10-0505 October 1999 Safety Evaluation Supporting Amend 233 to License DPR-56 ML20217G3541999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pbaps,Units 2 & 3. with ML20216H7091999-09-24024 September 1999 Safety Evaluation Supporting Amends 229 & 232 to Licenses DPR-44 & DPR-56,respectively ML20212D1281999-09-17017 September 1999 Safety Evaluation Supporting Proposed Alternatives CRR-03, 05,08,09,10 & 11 ML20212A5871999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Peach Bottom,Units 2 & 3.With ML20211D5501999-08-23023 August 1999 Safety Evaluation Supporting Amends 228 & 231 to Licenses DPR-44 & DPR-56,respectively ML20212H6311999-08-19019 August 1999 Rev 2 to PECO-COLR-P2C13, COLR for Pbaps,Unit 2,Reload 12 Cycle 13 ML20210N7641999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for PBAPS Units 2 & 3. with ML20209H1121999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pbaps,Units 2 & 3. with ML20195H8841999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pbaps,Units 2 & 3. with ML20206N1661999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Pbaps,Units 2 & 3. with ML20206A2921999-04-20020 April 1999 Safety Evaluation Concluding That Proposed Changes to EALs for PBAPS Are Consistent with Guidance in NUMARC/NESP-007 & Identified Deviations Meet Requirements of 10CFR50.47(b)(4) & App E to 10CFR50 ML20205K7411999-04-0707 April 1999 Safety Evaluation Supporting Amends 227 & 230 to Licenses DPR-44 & DPR-56,respectively ML20205P5851999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Peach Bottom Units 2 & 3.With ML20207G9971999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Peach Bottom Units 2 & 3.With ML20199E3471998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Peach Bottom,Units 1 & 2.With ML20205K0381998-12-31031 December 1998 PECO Energy 1998 Annual Rept. with ML20206P1651998-12-31031 December 1998 Fire Protection for Operating Nuclear Power Plants, Section Iii.F, Automatic Fire Detection ML20206D3651998-12-31031 December 1998 1998 PBAPS Annual 10CFR50.59 & Commitment Rev Rept. with ML20206D3591998-12-31031 December 1998 1998 PBAPS Annual 10CFR72.48 Rept. with ML20196G7021998-12-0202 December 1998 SER Authorizing Proposed Alternative to Delay Exam of Reactor Pressure Vessel Shell Circumferential Welds by Two Operating Cycles ML20196E8261998-11-30030 November 1998 Response to NRC RAI Re Reactor Pressure Vessel Structural Integrity at Peach Bottom Units 2 & 3 ML20198B8591998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Pbaps,Units 2 & 3. with ML20206R2571998-11-17017 November 1998 PBAPS Graded Exercise Scenario Manual (Sections 1.0 - 5.0) Emergency Preparedness 981117 Scenario P84 ML20198C6751998-11-0505 November 1998 Rev 3 to COLR for PBAPS Unit 3,Reload 11,Cycle 12 ML20195E5341998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Pbaps,Units 2 & 3. with ML20155C6071998-10-26026 October 1998 Safety Evaluation Supporting Amend 226 to License DPR-44 ML20155C1681998-10-22022 October 1998 Safety Evaluation Accepting Proposed Alternative Plan for Exam of Reactor Pressure Vessel Shell Longitudinal Welds ML20155H7721998-10-12012 October 1998 Rev 1 to COLR for Peach Bottom Atomic Power Station Unit 2, Reload 12,Cycle 13 ML20154J2401998-10-0505 October 1998 Safety Evaluation Supporting Amends 224 & 228 to Licenses DPR-44 & DPR-56,respectively ML20154H4771998-10-0505 October 1998 Safety Evaluation Supporting Amends 225 & 229 to Licenses DPR-44 & DPR-56,respectively ML20154G6821998-10-0101 October 1998 SER Related to Request for Relief 01A-VRR-1 Re Inservice Testing of Automatic Depressurization Sys Safety Relief Valves at Peach Bottom Atomic Power Station,Units 2 & 3 ML20154G6631998-10-0101 October 1998 Safety Evaluation Supporting Amends 223 & 227 to Licenses DPR-44 & DPR-56,respectively ML20154H5541998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Pbaps,Units 2 & 3. with ML20153B9651998-09-14014 September 1998 Safety Evaluation Supporting Amend 9 to License DPR-12 ML20151Y2901998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Pbaps,Units 2 & 3. with ML20238F2661998-08-24024 August 1998 Safety Evaluation Supporting Amend 222 to License DPR-44 ML20237B9531998-08-10010 August 1998 Specification for ISI Program Third Interval,Not Including Class Mc,Primary Containment for Bpaps Units 2 & 3 ML20237A7761998-08-10010 August 1998 SER Accepting Licensee Response to NRC Bulleting 95-002, Unexpected Clogging of RHR Pump Strainer While Operating in Suppression Pool Cooling Mode ML20237A5351998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Pbaps,Units 2 & 3 ML20236R8281998-07-15015 July 1998 Safety Evaluation Approving Proposed Alternative (one-time Temporary non-Code Repair) Pursuant to 10CFR50.55a(a)(3) (II) ML20236M3471998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Pbaps,Units 2 & 3 ML20249C4791998-06-0202 June 1998 Rev 6 to COLR for PBAPS Unit 2 Reload 11,Cycle 12 ML20248F4781998-06-0101 June 1998 Corrected Page 1 to SE Supporting Amends 221 & 226 to Licenses DPR-44 & DPR-56,respectively.Original Page 1 of SE Had Three Typos ML20248F7441998-05-31031 May 1998 Reactor Vessel Working Group,Response to RAI Regarding Reactor Pressure Vessel Integrity ML20248M3001998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Pbaps,Units 2 & 3 ML20247N5351998-05-11011 May 1998 SER Accepting Third 10-year Interval Inservice Program for Pump & Valves for Plant,Units 2 & 3 ML20249C4751998-05-0707 May 1998 Rev 5 to COLR for PBAPS Unit 2 Reload 11,Cycle 12 ML20247G0721998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Pbaps,Units 2 & 3 1999-09-30
[Table view] |
Text
. .
i PHILADhlall A EUC7kl0 COMPC:'
Pench TRatfor Atomic Power Stat ,
Delt a. Pennnylvnnin .
)g h h
/
. f. k .
Tebrusry 21, 197k .
Mr. Onr.en P. O'keilly, D2 rector .
cJ/f- 3 37 -// fD Unit ed St aten Ato-ic Erarcy Cor.riction Direct ornt e of Recair. tory Operat 2or.c g Ut') -
~
631 Pnr): Avenue 1 ir.g of Prur.r.ir., Penncylvanin 19406 ,
D.:b. lee t : Abnor .1 Decurrence Pk-Unur l'otifiention Confirr.ing cy telephor.e cor.verration with Mr. 70.1 Shed}owrJ:y, A.P.C. Begior.1 Pegalntory Operntionc Office on Tebruary 21, 1974.
Referenet: 1,1cence );urber DPR 44, A'endr.ent Kurber 1, iB 7echnien1 Crecifiestion Section 4.5.A M .,
. m-
, , ,6 , -
heport )lo. : 50-277-74 .S %;
Report Dat c :
Occurrenee Th.te:
2/21/74 2/2D/74 p[hh
/j racility: Pench Battor Atcmic Pover Stt tion - Unit 2 e3 ~- 4
- h. D. is Deltn, Penney)ve.nis 1731k
. w:.. y 3dentifier. tion of Occurrence: myn.C; ISR Re19y 3DA-1;?.3.A f ailed t o perforn itc decirn functio:: in the Rw. J;.? / .*
"A" 1.coyr Se)eet locie . ;)}.7%
,.g Conditior.c Prior to Occurrencet 1*.M.: ;
Ur,it 2 Cencrator cross Sond P30 L', Unit 2 reactor BSD W therna). u 1. 4 Pir.nt conditior.c vore atcble. vf.dQ
,3.,v-:
lveriptice of 0:currer.ce: INN Daring norr..1 rurveinence ter ting of the "A" kilk logie Sycte .. Re3ny fj.R i. i 10A-):33A $ci3(5 to tranc .it voltr.ge nerocc itc contacic and therefore up===E the loop cc)cetion 30cic sequence could not be corpleted.
Decipr. tion of Apprent Cnure of Occurrence:
'Tne reir:y c',oi) did energire, but the relay contnetc did not trar.r.it the voltr.re. A dirty contcet or n foreign dirt psrticle npprcntly ecuced the fr.D ure.
An.)ycit of Occurrence:
Tuilure of the 10A-X3% reiry to functior, vould prevent the "A" PR f Iopic from. celectinc n ) cop for injection. However, the "B" M!E 3or.ie !
vould perforr. thic function and th< refore the logic cyctem vac not h ,,
D DP*' '*
8402070090 740228 PDR ADOCK 05000277 f.'i .
i Corrective Action: S PDR y 7r,e reiny contt.cte vere cleaned and the reiny action chechcd by reloy technicinnr. After thit vork vnr. corplet ed, the reiny perforned
_ _.,,_ . c.9 t i e f n e t or D y i n t he,RHH hoop Sel e c t lor,.i c . , .
-f
l- .. ;
O O '
MEMO ROUTE SLIP 5" '" ' b a ' '"' * - """"'""- '*'"a-Form AIC-9 4 ( Res. Mai 14.19 4t p AILM n240 No'e and retura For ti tastate. { For leform ation.
TO (Name 493 WNt) thifiALS REMARR$
RO Chief, FS&EB PilILADELPilIA ELECTRIC, PB-2 RO:llQ (4)
DL (4) '
oATE A0 50-277-74-5 RO Files DR Central Files TO (Name acd uniti IMITI ALS REMARK $
OGC The above A0 is forwarded for information.
oArt Distribution will be made by this office to the
, PDR, Local PDR, NSIC, DTIE, and State 10 (Name and unit) thlilALS REMARn$
Representatives.
oATE F ROM (Name and wa.tl REMARas iN c.y p ' n .> r .
E. J. Brunner -
Region I PHONE NO. DATE 8-337-t246 3/4/74 USE OTHER $4DE FOR ADDITION AL REM ARKS cro s tain o . ges.esa i ,