Telecopy AO 75-21:on 750317,improper Valving Resulted in Defeating Recirculation Pump B Differential Pressure Switches.Caused by Personnel Error.Improper Valving Corrected by Clearing Block on Affected Valving
ML20086J042
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 03/18/1975
From: Ullrich W
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
AO-75-21, NUDOCS 8401230068
Download: ML20086J042 (1)


Text

.

v gg (

. Ac t Peach Ikstron Atomic Power Sggion g

Delta, Pennsylvania (9 17314

' f.1 rc h 13, 1975 tr. Jene s P. O'Reilly, C irector

)ffice af Inspection and Enforcement legion 1 Inited States Nuclear Regulatory Comission i31 Park Avenue

'ing of Prussia, Pennsylvania 19406 iubicct:

Abnnemi Occurrence 24-l!our Notification

onfimin3 J.

F. Frnn:'

me conver sat ion with Mr. Walt Baunack, Region 1 United St iuclear heculatory Coc-nit.on on March 17, 1975.

5

  1. ference:

Licence Num.ber DPR-44

-Td 3 2.B.._.. _.

r}

h:hnienLS onc i f i cat icn.Referenc e - ______'r_.

==

tenort Na.

50' 27T-7a-a w=

-- ---- ~m.-mu a :- - --- -

z ---

e

=c are f < w,r,>$yirwqmg7 yau-ur.1

)Ccu?N.1Ce Uate ;

kirCn 17, 1vi> -


U

- ~ ~. - - - -.

.acility:

Peach Ecttoa Atenic Power Station R.D. 1, Delta, Fennsylvania 17314

[

)

Ider*ification of Occurrence:

T Icpreper valving u:lich resulted in defeating :.he "6" Recire pu::p differential '

ll!

pressure switches.

)

'onditions Prior to Occurrence:

t Unit 2 at fall power

)cscription of Cccurrence:

i It was discovered that a blocking work pemit applied to the ceron root valve for the "B" P.ecirc puap difforcatial pressare switches for the repair of a val bicek had not been cleared prior to reactor operation.

These switches supply y

J infornation to the LPCI loop seicetion logic as to which pu::pa are running.

I

{

Designation of Apnarent Cruse of Occurrenec-(

I:cdivid'11 t'nilure to identify that the block was on a safety related system

'during conpletica of the startup check -off-list.

Analysis of Occurrence:

Analysis of the possible itecire. pr p re:ning conbinations and Eccire. pu;p br 1ccaticas for a LCCA condition irdienter that if the LPCI were needc4 loop selection vould have been properly nada.

The cafety implications of this occurrence are therefore considered minit.ul.

Cerrective Action:

'Ihe icproper valving was ic::cdiately corrected by clearing the bicek on the af fccts d v.21ving.

8401230068 750318 Failuro Data.

PDR ADOCK 05000277 5

PDR Nonc previcus Very truly yours,,

p

.;, y # 6 -c -

L T. Ullrich, Superintendent, Peach Cotto:s Ato aic Power Station