Telecopy AO 75-43:on 750717,excessive Leakage Found Through Torus Water Cleanup Pump Inboard Isolation Valve MO-3-14-70. Cause Under Investigation.Line Isolated.Valve Will Be Retested
ML20086H696
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 07/18/1975
From: Ullrich W
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20086H694 List:
References
AO-75-43, NUDOCS 8401190569
Download: ML20086H696 (1)


Text

"

c l

PHILADELPlfIA ELECTHIC COMPANY Peach Bottom Atomic Power Station Delta, Pennsylvania 1731b July 18, 1975 Mr. James P. O'Reilly, Director.  :

i Office of Inspection and Enforcement

~

  • Region 1-United States Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19h06-Subj e ct,: Abnormn1 Occurrence 2h-Hour Notification Confirming W. T. Ullrich's conversation with Mr. Walt Baunack18, (on1975 site),

Re61on 1, United States Nuclear Regulatory Commiscion on July

Reference:

License Number DPR-56 Technical Specification

Reference:

4.7.A.2.f Report No.: 50-278-75-h3 Report Date: July 18, 1975 Occurrence Date: July 17, 1975 Facility: Peach Botton Atomic Power Station R.D. 1, Delta, Pennsylvania 17314 s

Identification3eakage of occurrence:

through the torus water cleanup pump inboard Eiccasive isolation valve MO-3-lk-70.

Conditions Prior to Occurrence:

  • Unit 3 at approximately 50% power.

Description of Occurrence: of the torus water Cleanup During a routine local leak rate test the inboard valve was found to leak pump suction isolatior. valves, in excess of 2000 cc/ min.

Designation of Apparent Cause of Occurrence: --

Under investigation.

Analysis of Occurrence:

Upon an isolation signal, both the inboard valve (MO-70) and the outboard valve (MO-71) receive isolation cignals. The outboard isolation valve MO-71 irdicated no leakage. Therefore, safety o ',

implications of this occ'urrente are minimal.

-Corrective Action:

!- The line was immediately isolated by closing the outboard isolation valve (MO-71). The valve vill be maintained and retested.

4 Failure Data:

None.

j'

  • Very truly yours, '

W. T. Ullrich, Superintendent Peach Bottom Atomic Power Station

. *b 8401190569 750717 g DR ADOCK 05000270 .

PDR ,

h