Telecopy Ao:During Routine Surveillance,Hpci Flow Switch 2-2352 Failed to Trip at Differential Pressure.Caused by Binding of Flow Switch Linkage.Linkage Adjusted & Switch Recalibr
ML20084U404
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 02/11/1975
From: Kalivianakis N
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20084U366 List:
References
NJK-75-64, NUDOCS 8306290011
Download: ML20084U404 (1)


Text

_ . _ _ _ _ _ _ _ -

' ['E ,

Commryer.ith Edis:n Quad-Ci! Denerating Station s ,

N

~

- ' N.. Post Offsahn Cordova,lttinois G1242 216 .-

\ *

(d

. q; .." Tc:ephone 30ts/6S4-2241 ^\ s *' .

. - - 4 . ,,

NJY-75-GI; l' '

N ,N '

l

. % U% ,' [p,,(h Telecopy: Region 111, Attention: Mr. C. FeIerabend s'

- Byp> ? .y -p

.a. ,O ', [2'"'A si',.

A February 11, 1975 (6 b 4 4 ;

O7/

Y J. Keppler, Regional Director o M c. -- .

Directorate of Regulatory Operations '

Region lli -

U. S. Atomic Energy Conraission 799 Roosevelt Road Glen Ellyn, Illinois 60137

Reference:

Quad-Citics Ndclear Power Station, Unit 2 Docket No. 50-265, DPR-30 Appendix A, Sections 1.0.A.2, 3.2.A, Table 3 2.1, 6.6.B.I.a

Dear' Mr. Keppler:

The purpose of.this letter is to provide vou with notification of an Abnormal Occurrence as requ! red by Technical Specification 6.6.B.I.a wi thin 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of the occurrence.-

With Unit 2 in the cold shutdown cond' i tion for the current refueling out-age, routine quarterly surveillance on high pressure coolant injection system flow switches revealed that flow switch 2-2352 would not trip at any differential pressure. This inoperable flav switch caused a viola-tion of the operability requirements of Table 3.2.1 of Technical Speci-fications.

The flow switch linkage which was binding, was adjusted and the flow switch was recalibrated.

This occurrence was diicussed by telephone with fir. Knop of your office on February 10, 1975. Further information will be provided by Abnormal Occurrence Report A0 50-265/75-7 which will be submitted within 10 days

  • he date of this occurrence.

Very truly yours, COMMONWEALTH.EDISCH COMPANY

' QUAD-CITIES NUCLEAR P0'.lER STATION

/

/dTshb.ih, N. J. Kalivianakis -'

8306290011 750218 Station Superintendent gDRADOCK 05000265 NJK/lk PDR 1))8