Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20217A993 | 30 September 1999 | NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data | |
SVP-99-204, Monthly Operating Repts for Sept 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With | 30 September 1999 | Monthly Operating Repts for Sept 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With | |
ML20217A169 | 22 September 1999 | Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers | |
ML20212J050 | 21 September 1999 | Safety Evaluation Re Licensee Implementation Program to Resolve USI A-46 at Plant,Per GL 87-02,Suppl 1 | Safe Shutdown Ultimate heat sink Safe Shutdown Earthquake Operability Determination Earthquake |
SVP-99-179, Monthly Operating Repts for Aug 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With | 31 August 1999 | Monthly Operating Repts for Aug 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With | |
ML20210L866 | 2 August 1999 | Safety Evaluation Accepting License 60-day Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs | Stroke time |
SVP-99-155, Monthly Operating Repts for July 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With | 31 July 1999 | Monthly Operating Repts for July 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With | |
SVP-99-148, Monthly Operating Repts for June 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With | 30 June 1999 | Monthly Operating Repts for June 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With | |
ML20196H862 | 30 June 1999 | NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept | High Radiation Area Power change |
ML20195K148 | 16 June 1999 | Safety Evaluation Authorizing Relief Request RV-23A for Duration of Current 10 Yr IST Interval on Basis That Compliance with Code Requirements Would Result in Hardship Without Compensating Increase in Level of Quality & Safety | Stroke time Incorporated by reference |
SVP-99-123, Monthly Operating Repts for May 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With | 31 May 1999 | Monthly Operating Repts for May 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With | |
ML20195B259 | 19 May 1999 | Rev 66a to CE-1-A,consisting of Proposed Changes to QAP for Dnps,Qcs,Znps,Lcs,Byron & Braidwood Stations | Offsite Dose Calculation Manual Process Control Program |
SVP-99-104, Monthly Operating Repts for Apr 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With | 30 April 1999 | Monthly Operating Repts for Apr 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With | |
SVP-99-102, Summary Rept of Changes,Tests & Experiments Completed, Covering Period 990201-0430. with | 30 April 1999 | Summary Rept of Changes,Tests & Experiments Completed, Covering Period 990201-0430. with | Safe Shutdown Unanalyzed Condition Hydrostatic Excess Flow Check Valve Battery sizing Turbine Missile Fuel cladding Fire Protection Program Flow Induced Vibration Overspeed trip Manual Operator Action |
ML20205Q529 | 16 April 1999 | SER Concluding That Quad Cities Nuclear Power Station,Unit 1,can Be Safely Operated for Next Fuel Cycle with Weld O2BS-F4 in Current Condition Because Structural Integrity of Weld Will Be Maintained | Weld Overlay Stress corrosion cracking |
ML20205J601 | 7 April 1999 | Safety Evaluation Accepting Proposed Merger of Calenergy Co, Inc & Midamerican Holdings Co for Quad Cities Nuclear Power Station,Units 1 & 2 | |
SVP-99-071, Monthly Operating Repts for Mar 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With | 31 March 1999 | Monthly Operating Repts for Mar 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With | Safe Shutdown |
ML20205C567 | 19 March 1999 | Simulator Four-Yr Certification Rept | Safe Shutdown |
ML20207D234 | 1 March 1999 | Post Outage (90 Day) Summary Rept, for ISI Exams & Repair/Replacement Activities Conducted 981207-1205 | Reactor Vessel Water Level Weld Overlay Hydrostatic VT-2 Intergranular Stress Corrosion Cracking EVT-1 Liquid penetrant Flow Induced Vibration Operability Assessment |
ML20204B157 | 28 February 1999 | Monthly Operating Repts for Feb 1999 for Quad Cities,Units 1 & 2.With | Shutdown Margin |
SVP-99-021, Quarterly Summary SER of Changes,Tests & Experiments Completed, Covering Period of 981101-990131,IAW 10CFR50.59 & 10CFR50.71(e).With | 31 January 1999 | Quarterly Summary SER of Changes,Tests & Experiments Completed, Covering Period of 981101-990131,IAW 10CFR50.59 & 10CFR50.71(e).With | Safe Shutdown Shutdown Margin Reactor Vessel Water Level Ultimate heat sink Grab sample Offsite Dose Calculation Manual Stroke time Weld Overlay Internal Flooding Hydrostatic Temporary Modification High Energy Line Break Flow Accelerated Corrosion Feedwater Heater Feedwater Controller Failure Excess Flow Check Valve Turbine Missile Scaffolding Flow Induced Vibration Unidentified leakage Overspeed trip Manual Operator Action |
ML20205D131 | 31 December 1998 | 1998 Decommissioning Funding Status Rept for Yr Ending 981231 for Quad Cities Nuclear Power Station,Units 1 & 2 | |
ML20205M706 | 31 December 1998 | Unicom Corp 1998 Summary Annual Rept. with | |
SVP-99-007, Monthly Operating Repts for Dec 1998 for Quad Cities Nuclear Power Station,Units 1 & 2,IAW GL 97-02 & TS 6.9.With | 31 December 1998 | Monthly Operating Repts for Dec 1998 for Quad Cities Nuclear Power Station,Units 1 & 2,IAW GL 97-02 & TS 6.9.With | |
ML20196C839 | 30 November 1998 | Rev 0 to GE-NE-B13-01980-030-2, Assessment of Crack Growth Rates Applicable to Induction Heating Stress Improvement (IHSI) Recirculation Piping in Quad Cities Unit 1 | Stress corrosion cracking |
SVP-98-364, Monthly Operating Repts for Nov 1998 for Quad Cities Nuclear Power Station,Units 1 & 2.With | 30 November 1998 | Monthly Operating Repts for Nov 1998 for Quad Cities Nuclear Power Station,Units 1 & 2.With | |
ML20196G124 | 30 November 1998 | COLR for Quad Cities Unit 1 Cycle 16 | |
ML20196D965 | 30 November 1998 | Safety Evaluation Supporting Relief Requests CR-21 & CR-24, Respectively.Relief Request CR-23,proposed Alternative May Be Authorized,Per 10CFR50.55a & Relief Request CR-22 Was Withdrawn by Licensee | VT-2 |
ML20196C873 | 30 November 1998 | Rev 0 to GE-NE-B13-01980-30-1, Fracture Mechanics Evaluation on Observed Indications at Two Welds in Recirculation Piping of Quad Cities,Unit 1 Station | Weld Overlay Stress corrosion cracking |
ML20196A976 | 20 November 1998 | Safety Evaluation Re Licensee 180-day Response to GL 95-07, Thermal Binding of Safety-Related Power-operated Gate Valves | Power-Operated Valves Backfit |
ML20196A419 | 19 November 1998 | Safety Evaluation Accepting QA TR CE-1-A,Rev 66 Re Changes in Independent & Onsite Review Organization by Creating NSRB | |
SVP-98-346, Monthly Operating Repts for Oct 1998 for Quad Cities Nuclear Power Station,Units 1 & 2.With | 31 October 1998 | Monthly Operating Repts for Oct 1998 for Quad Cities Nuclear Power Station,Units 1 & 2.With | Ultimate heat sink |
SVP-98-358, Summary Rept of Changes,Tests & Experiments Completed, Including SEs Covering Period on 980716-1031.With | 31 October 1998 | Summary Rept of Changes,Tests & Experiments Completed, Including SEs Covering Period on 980716-1031.With | Hot Short Safe Shutdown High Radiation Area Stroke time Time to boil Hydrostatic Operating Basis Earthquake Temporary Modification Emergency Lighting High Energy Line Break Test box Local Leak Rate Testing Scram Discharge Volume Hardened vent Water hammer |
SVP-98-326, Monthly Operating Repts for Sept 1998 for Quad Cities Nuclear Power Station,Units 1 & 2.With | 30 September 1998 | Monthly Operating Repts for Sept 1998 for Quad Cities Nuclear Power Station,Units 1 & 2.With | |
ML20153D019 | 18 September 1998 | Part 21 Rept Re Defect in Gap Conductance Analyses for co- Resident BWR Fuel.Initially Reported on 980917.Corrective Analyses Performed Demonstrating That Current Operating Limits Bounding from BOC to Cycle Exposure of 8 Gwd/Mtu | Fuel cladding |
ML20153C677 | 17 September 1998 | Part 21 Rept Re Defect Relative to MCPR Operating Limits as Impacted by Gap Conductance of co-resident BWR Fuel at Facilities.Operating Limit for LaSalle Unit 2 & Quad Cities Unit 2 Will Be Revised as Listed | |
ML20151T271 | 4 September 1998 | Safety Evaluation Accepting Licensee Response to NRC Bulletin 95-002 | Coatings Foreign Material Exclusion |
ML20151Y726 | 31 August 1998 | Monthly Operating Repts for Aug 1998 for Quad Cities Nuclear Power Station | |
ML20237E233 | 21 August 1998 | Revised Pages of Section 20 of Rev 66 to CE-1-A, QA Topical Rept | Offsite Dose Calculation Manual Process Control Program Fire Protection Program |
ML20151Y730 | 31 July 1998 | Revised MOR for Jul 1998 for Quad Cities Nuclear Power Station,Units 1 & 2 | |
ML20237A625 | 31 July 1998 | Monthly Operating Repts for July 1998 for Quad Cities Nuclear Power Station,Unit 1 & 2 | Scram Discharge Volume |
SVP-98-328, Summary Rept of Changes,Tests & Experiments Completed, Including SEs Covering Period of 971001-980715,per 10CFR50.59 & 10CFR50.71(e).With | 15 July 1998 | Summary Rept of Changes,Tests & Experiments Completed, Including SEs Covering Period of 971001-980715,per 10CFR50.59 & 10CFR50.71(e).With | Hot Short Safe Shutdown Ultimate heat sink Offsite Dose Calculation Manual Fire Barrier Stroke time Internal Flooding Hydrostatic Operator Manual Action Temporary Modification Zebra Mussel Emergency Lighting Test box Operability Determination Battery sizing Earthquake Biofouling Pressure Boundary Leakage Fire Protection Program Scaffolding Unidentified leakage Overspeed trip Manual Operator Action Water hammer |
SVP-98-249, Monthly Operating Repts for June 1998 for Quad Cities Nuclear Power Station,Units 1 & 2 | 30 June 1998 | Monthly Operating Repts for June 1998 for Quad Cities Nuclear Power Station,Units 1 & 2 | Scram Discharge Volume |
SVP-98-215, Monthly Operating Repts for May 1998 for Quad Cities Nuclear Power Station Units 1 & 2 | 31 May 1998 | Monthly Operating Repts for May 1998 for Quad Cities Nuclear Power Station Units 1 & 2 | Stroke time Scram Discharge Volume |
ML20247N628 | 19 May 1998 | Rev 2 to COLR for Quad Cities Unit 2 Cycle 15 | Feedwater Controller Failure |
ML20216C056 | 30 April 1998 | Safe Shutdown Rept for Quad Cities Station,Units 1 & 2, Vols 1 & 2.W/22 Oversize Figures | Hot Short Safe Shutdown Fire Barrier Emergency Lighting Exemption Request Fire Protection Program |
SVP-98-176, Monthly Operating Repts for Apr 1998 for Quad Cities Nuclear Power Station,Units 1 & 2 | 30 April 1998 | Monthly Operating Repts for Apr 1998 for Quad Cities Nuclear Power Station,Units 1 & 2 | Safe Shutdown Operator Manual Action Scram Discharge Volume |
ML20217D028 | 22 April 1998 | Part 21 Rept Re Additive Constants Used in MCPR Determination for Siemens ATRIUM-9B Fuel by Core Monitoring Sys Were Found to Be non-conservative.SPC Personnel Notified All Customers w/ATRIUM-9B Lead Test Assemblies | Fitness for Duty |
ML20217G395 | 8 April 1998 | TS 3/4.8.F Snubber Functional Testing Scope Quad Cities Unit 2 TS (Safety-Related) Snubber Population 129 Snubbers | |
SVP-98-128, Monthly Operating Repts for Mar 1998 for Quad Cities Nuclear Station Units 1 & 2 | 31 March 1998 | Monthly Operating Repts for Mar 1998 for Quad Cities Nuclear Station Units 1 & 2 | Scram Discharge Volume |