ML20084E211

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Mar 1984
ML20084E211
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 03/31/1984
From: Clayton F, Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NUDOCS 8405020179
Download: ML20084E211 (4)


Text

( / .

JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE

SUMMARY

OF OPERATIONS MARCH, 1984 During the month of March, there was one (1) automatic shutdown which occurred on March 27, 1984.

The following safety-related maintenance was performed in the month of March:

1. Performed miscellaneous maintenance on diesel generators.
2. Repacked #2 river water pump.
3. Replaced B seal injection filter.

8405020179 840331 PDR ADOCK 05000364 R pop _

e . DOC)2's fiO. 50-364

.'. UNIT 2

~ . . '

DATE 4-1 RA COMPLETED BY W.C. Hairston, III TELEPHONE (205) 899 5156 March, 1984

.40El -

DAY AVERAGE DAILY FO*.vER LEVEL DAY AVERAGE DAILY P0tVER LEVEL (SIWE Net) (SIWE Net!

g, 840 17 825 R14 13 828 2

3 838 19 827 ,,

4 835 ;0 Ros 3

830 21 831 6 830 r, R70 836 830 7 23 g 837 24 826 9 838 25 n'A 10 a'o 26 831 11 837 27 408 A1A ;3 167 32 13 827 ;9 _ 817 j [4 832 30 R,i 830 3g 832 15 16 828 C G tCEONS I

On this form:t list the sve.-2;; daily unit power icvelin MWe Net for c:ch day in the reporting month. Campute Io

, the neste:t whule me;: watt.

(997) 1

- . j

  • l OPERATING DATA REPORT DOCKET NO. 50-364 DATE 4-3-84 COMPLETED BY W.G. Itairston.. III TELEPHONE (?nsi 899-5156 OPERATING STATUS J seph M. Farley - Unit 2 Notes
1. Unit Name:

farc h, 1984

2. Reporting Period: 1) Cumulative data since
3. Licensed Thermal Power (MWt): 2652 7-30-81, date of
4. Nameplate Rating (Gross MWe): 860 commercial operation.
5. Design Electrical Rating (Net MWe): 829
6. Maximum Dependable Capacity (Gross MWe): 852.5 j
7. Maximum Dependable Capacity (Net MWe): 809.I
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Gise Reasons:

N/A 9 Power Lesel To which Restricted. If An N/A

10. Reasons For Restrictions.lf Any: /(ANet MWe):

This Month Yr..to Date Cumulatise

11. Hours in Reporting Period 744 2.184 23.425
12. Number Of Hours Reactor Was Critical 711 o 2.147.7 20,690.5
13. Reactor Reserve Shutdown Hours 0.0 _,

0.0 138.0

14. Hours Generator On Line 724.5 _  ? 1n1 9 9n An? n
15. Unit Resene Shutdown Hour, 0.0 ,_, n.n n_n
16. Gross Thermal Energy Generated (MWH) 1.895.910 ,_S.453.396 50.791.240 -
17. Gross Electrical Energy Generated (MWH) 622.002 _,_1.786.768 16.773.644
18. Net Electrical Energy Generated (MWH) 592,374 1.699.700 15.899.726
19. Unit Senice Factor 97.4 96.3 87.I
20. Unit Asailability Factor 97.4 _ 96.3 87.1
21. Unit Capacity Factor (Using MDC Net) na A 96.2

,y o

22. Unit Capacity Factor (Using DER Net) 96.n 01_o ai_q
23. Unit Forced Outage Rate 2.6 3.7 5.2
24. Shutdowns Scheduled Oser Nest 6 Months (Type. Date and Duration of Each):

N/A

25. If Shut Down At End Of Report Period. Estimated Date of Startup: 't / ^
26. Units in Test Status (Prior to Commercial Operation): Forecast Achiesed INITIAL CRITICALITY 5-6-81 5-8-81 INITIAL ELECTRICITY 5-24-81 5-25-81 COMMERCIAL OPER ATION R 1.At _7-1n-n1 (9/77)

/-  % '

s I)OCK E T NO.

50-364 UN4T SilU1 DOWNS AND POWER REI)UCTIONS UNIT NAME J. M. Farley-Unit 2 13AIE 4 LRA COMPLETEls ity 13 c, no v ,.g t mg , 111 REFORT MONiil March. 1984 TELLPilONE (?ns) 999--5155 n.

3 E a

EiLCflse*C h*F,  % CJuic 10su re(IInc Ni.. , thae k 3g jgy E,ent sy al Attiim tis

  • g5E E j;5g 50 Repeat * ,

fU Prevent Recurrence d

004 840327 F 19.5 H 3 84-004-00 NA NA Reactor trip due to lightning induced surges.

4 e

t-I 1

i I

i l

l I 2 3 4

f
I.uted Reas.=: Methad: Eminbit G-lastrutti. ns l S. Ssheduled A figuirsemens Faelews(Emplaan) -

1 Manual f. < Preparatum of Ibia

) R Maimec===re a4 Tess 2 Manual Scraan. Eni:y Sheets sin lacus.:e O Ref eling 3 Aus miasac Scrans. Esent Rep.=I Il.ER1l'i!c INtIREG-13 Reguias.=y stessekse.no 44hhes (Emplain) 0161)

I 4)penas.w Teaemeng A Ikense Eaasmenasiin F-AJssenastiasiw 5 G (Ipciatunnel Ln.4 (E agdasal IN!nbisI.52nie S.nasce rs/J7) ll thhes (Ear saing

/ '

Malling Address

, Alabima Power Company 600 North 18th Street Post Office Box 2641 Dirmingham, Alabama 35291 Telephone 205 783-6081 F. L Clayton, Jr. i S

4

' 0 " 4*"' AlabamaIbwer Itna s(MihtYn clet: llc Sy%ft4n April 11,1984 Docket No. 50-364 Director, Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C. 20555 ,

Dear Sir:

RE: Joseph M. Farley Nuclear Plant Unit 2 Monthly Operating Data Report Attached are two (2) copies of the March 1984 Monthly Operating Report for Joseph M. Farley Nuclear Plant, Unit 2, required by Section 6.9.1.10 of Appendix A of the Technical Specifications. As requested by letter from Mr. John F. Stolz to Mr. Alan R. Barton, dated October 21, 1977, a

" Narrative Summary of Operating Experience" is included in the attached report.

If you have any questions, please advise.

Yours very rul ,

l' /

F. L. Clayton, Jr.

FLCJr/KWM: sam Enclosures xc:

Mr. Ted Cintula Director, (1 copy))

IE (10 copies Director, RII (1 copy)

S k

__ -_ --