Monthly Operating Rept for June 1983
ML20076L305
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 07/06/1983
From: Clayton F, Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NUDOCS 8307190113
Download: ML20076L305 (5)


Text

. . . .- .-

.. s OPERATING DATA REPORT DOCKET NO. 50-364 DATE 7/06/83 ,

COMPLETED BY W.G.Hairston,III I s TELEPHONE (205) 899-5156 OPERATING STATUS Notes

1. Unit Name: Joseoh M. Parlev - Unit 2
2. Reporting Period: June,1983 (1) Cumulative data s.ince 2652 7/30/81, date of
3. Licensed Thermal Power (MWt):

860 commercial operation.

4. Nameplate Rating (Gross MWe):
5. Design Electncal Rating (Net MWe): 829
6. Maximum Dependable Capacity (Gross MWe): 854.'7
7. Maximum Dependable Capacity (Net MWe):

813.7 i

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

N/A

9. Power Level To W1uch Restricted. If Any (Net MWe): N/A
10. Reasons For Restrictions. If Any: N/A This Month Yr to.Dete ' Cunsulative
11. Hours in Reporting Period 720 4343 16,824
12. Number Of Hours Reactor Was Critical 720 4343 15.127.5
13. Reactor Reserve Shutdown Hours 0 0 138.4
14. Hours Generator On.Line 720 4341 14.94s.4
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWy , 1,905,327 11.490.941 36.912.755
17. Gross Electrical Ener ,y Generated (MWH) 594.572 3.654.684 12.327.918
18. Net Electncal Energy Generated (MWH) 565.182 3.478.256 11.694.106
19. Unit Service Factor 100.0 100.0 88.8
20. Unit Availability Factor 100.0 100,0 88.8
21. Unit Capacity Factor (Using MDC Net) 96.5 98.4 -85.4

- 22. Unit Capacity Factor (Using DER Net) 94.7 96.6 83.8

23. Unic Forced Outage Rate 0 0 5.6

~24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each1:

Refuelina outace? Sentomber 16. 1991. npprnvimatn1v 6 wn nle e 1

25. If Shur Down At End Of Report Period. Estimated Date of Startup: N/A
26. Units in Test Status (Prior to Commercial Operation): Forecast Achieved 5/06/81. 5/08/81 O INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 5/24/81' 8/01/81 5/25/81 7/30/81 i

8307190113 830706 gop PDR ADOCK 05000364 PDR R

--- -~ - ~~

-- 364' ~

~

UNIT 2 DATg 7/06/83 C) T A *

  • H O N E. (205) 899-5156 SiONTl! June.1983 )

I DAY AVERACE DAILY FOWER LEVEL DAY AVERACE DAILY POWER LEVEL (MWe-Net) .

(MWe Net)

I, 746 17 785 2 745 13 748 3 788 19 786 4 783 20 785 3 787 21 794 6 . . 790 n 791 7 792 23 782 3 794 24

  • 782 9 793 23- 781 10 794 26 774

!! 779 27 782 12 791 3 783 ,

13 786 3 781 14 791 30 779 15 792 31 16 791 l

l i INSTRUCEONS On this romt:t. list the :venp d:ity unit power levelin MWe Net for each i:y in the reporting munth. Compute to

, the ne:re:t whole mepwatt.

f-k9 ~

!O

'4

'---e w g- ,- - - - + - - .-,,,-w --w-,,, c -~,-w -

y. -

? *

( (

UNIT SilulpOWNS AND POWER REI)UC110NS DOCKET NO. 5d-364 l

UNITNAME J.M. Parley-Unit,$ -

i DATE 7/06/83 June COMPLETED BY W_ G. Hairston ,III .

REPORT MONTil TELEPilONE (205) 899-5156 l

"E -

No. Date

-.F .$ E gg "g E

,, y oc Licensee E v, h Cause & Cassective f]

g Even 3,7 a- Aclions to S o5 oc jisg Repost # _

54 U Ps< vent Recussence 6

There were no ur it s butdowri s or signif icant power ceduci ions in ;he month'of June.

f s

, _ j

l. 2 3 4 '

F: Forced Reason: M-t hJ. Exhibit G . Insisuctions S: Scheduled A Equipmens Failure (Explain) l-Manual for Psepasation of Data n Maintenace of Test 2 Manual Sesam. Enisy Slicens for I.icensee C-Refueling 3 Autunutic Scram. Event Repius (LER) File INUREG-D Regulatosy Resisiccios. 4 Osher (Explain) 01611 E-Operator Training & IJcense Examination F-Administrasive 5 G Opesational Enos (Explain) , Exhibia ! Same Source (9/77) ll Olhes (Explain)

Malling Address .

Atttma Powir Company 600 North 18th Street Post Office Box 2341 Birmingham, Alabama 35291 Telephone 205 783-6081 F. L Clayton, Jr.

%!l@Og'"' g AlabamaPbwer tte souttuxn electrc SySitNn July 12, 1983 Docket No. 50-364

' Director, Of fice of Management Information and Program Control

0. S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Si r:

RE: Joseph M. Farley Nuclear Plant Unit 2 Monthly Operating Data Report Attached are two (2) copies of the June, 1983 Monthly Operating Report f or Joseph M. Farley Nuclear Plant, Unit 2, required by Section 6.9.1.10 of the Unit 2 Technical Speci-fications. As requested by letter f rom Mr. John F. Stolz to Mr. Alan R. Barton, dated October 21, 1977, a " Narrative Summary of Operating Experience" is included in the attached report.

If you have'any questions, please advise.

Yours ve truly, U O F. L. Clayton, J r.

FLCJr/KWM:nac Enclosures xc: Mr. Ted Cintula (1 copy)

Director, IE (10 copies)

Director, RII (1 copy) b f

54 l

p. .

a . . -: .a L

JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE

SUMMARY

OF OPERATIONS

. JUNE, 1983 i.

The Unit experienced no shutdowns or significant power reductions during the month of June.

The following safety-related maintenance was performed in the month of June:

1. Performed miscellaneous maintenance on diesel generators- .
2. Performed preventive maintenance on safety-related breakers EA10 and EC03.
3. Repacked #6 river water pump.

4. Repaired #3 river water pump.

F..