05000395/LER-1983-038, Forwards LER 83-038/03L-0.Detailed Event Analysis Encl

From kanterella
(Redirected from ML20076C938)
Jump to navigation Jump to search
Forwards LER 83-038/03L-0.Detailed Event Analysis Encl
ML20076C938
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 05/12/1983
From: Dixon O
SOUTH CAROLINA ELECTRIC & GAS CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20076C940 List:
References
NUDOCS 8305200626
Download: ML20076C938 (2)


LER-2083-038, Forwards LER 83-038/03L-0.Detailed Event Analysis Encl
Event date:
Report date:
3952083038R00 - NRC Website

text

r

~

]

e e

'4 SOUTH CAROLINA ELECTRIC & GAS COMPANY Post ospice 7s4 CotuusiA. SOUTH CAROLINA 29218 O. W. DixoN. JR.

Vice PassicaNT NUCLE AR OpamArioNs May 12, 1983 cm Las 2:

l. . t.'

Mr. James P. O'Reilly 23  ;*f o

-m Regional Administrator U.S. Nuclear Regulatory Commission 21 c@

ca m_

Region II, Suite 2900 **

101 Marietta Street, N.W. OE Atlanta, Georgia 30303 Es 9:.]

r.

SUBJECT:

Virgil C. Summer Nuclear Station Docket No. 50/395 Operating License No. NPF-12 Thirty Day Written Report LER 83-038

Dear Mr. O'Reilly:

Please find attached Licensee Event Report #83-038 for Virgil C.

Summer Nuclear Station. This Thirty Day Report is required by Technical Specification 6.9 1.13.(a) as a result of discovering Pressurizer Protection Pressure Channel 457 out of calibration with the Plant operating in Mode 5. This instrument is required to be operable in Modes 1 and 2 by Technical Specification 3.3.1, and Modes 1, 2, and 3 by Technical Specification 3.3.2.

Should there be any questions, please call us at your convenience.

Very truly yours ,

l

0. W. D xon, Jr.

l RJB:0WD/dwr f Attachment cc: V. C. Summer G. J. Braddick l

T. C. Nichols, Jr.,/0. W. Dixon, Jr. J. C. Miller l

E. C. Roberts J. L. Skolds ~~'^

H. N. Cyrus J. B. Knotts, Jr.

Group / General Managers I&E (Washington)

Document Management O. S. Bradham R. B. Clary Branch l

C. A. Price INPO Records Center A. R. Koon NPCF File (Lic./Eng.)

D. A. Lavigne l C. L. Ligon (NSRC)

OFFICIAL CdPY L 8305200626 830512 ./# gg 0500039 gDRADOCK

r 4

'Mr. James P. O'Reilly LER No.83-038 Page Two May 12, 1983 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES On April 15, 1983, with the Plant in Mode 5, Pressurizer Pressure Transmitter IPT-457 was found to be out of tolerance during the performance of a channel calibration. Upon completion of the channel calibration, the pressure test gauge that was used fo r calibration of the transmitter was found to be out of tolerance on the post calibration check.

Corrective action was taken to recalibrate the transmitter, and the channel was declared operable April 22, 1983.

This instrument is required to be operable in Modes 1 and 2 by Technical Specification 3.3.1, and Modes 1, 2, and 3 by Technical Specification 3.3.2.

l There were no adverse consequences from this occurence since the required minimum number of channels were operable.

CAUSE AND CORRECTIVE ACTIONS The cause of this event is contributed to a span and zero shif t of the test instrument used in the calibration of-the transmitter.

Maintenance personnel are to continue to check post calibration data.