r-A12ama Power Company 40 inverness Center Parkway -

' Post Offee Box 1295

  • Dwmingnam. Alabama 35201 Telephone 205 868 5581 W. G. Hairston, til Senior Vice President -

Nuclear Operations February-12, 1991 <AlabamaPower-

. the southern electrc system l d

Docket No. 50-364

.(

U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Vashington, D. C. 20555-Joseph H. Parley Nuclear Plant -

Unit:2 Honthly Operating-Data Report-Attached is _ the January 1991 Honthly Operating Report for Joseph H. Farley:

Nuclear Plant Unit 2, as required by Section 6.9.1.10 of the Technical .-;

Specifications.

If you have any questions, please advise.

Respectfully submitted, "

d V.- Gl. Ilairston, III JAR scj04-4351 '

Attachments '

cc: Mr. S. D. Ebneter Mr. S. T. Hoffman Mr. G. F. . Maxwell

. i i

j q

~

9102200058 910131 ADOch0500g4 3; DR  ;

W

JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2  !

NARRATIVE

SUMMARY

OF OPERATIONS January, 1991 The cycle 7 - 8 refueling outage continued into the month of' January.

The generator was taken off line at 2037 on January 6 to perform a turbine overspeed trip test. The unit returned to power operation at 2158 on January 6.

At approximately 1930 on 1-1-91, during p.ier.t heat-up and pressurization in Mode 3, pressurizer power operated relief valit iPORV) 445A opened. The PORV and the PORV block valve vere closed immediately. The cause of this event va's improper setup of the air operated actuator. The PORV was repaired and returned to service on 1-2-91. The PORV opened previously on 12-31-90 and maintenance had just been completed when the valve opened a second time. The previous opening of the PORV was reported in the December Operating Report.

The following major safety-related maintenance was performed in the month of January:

1. The 2B reactor coolant pump was balanced.
2. Miscellaneous corrective and preventive maintenance was performed on the diesel generators.

I 1

1

A

, OPERATING DATA REPORT DOCKET NO. 50-364 DATE 7ebruary 7,1991 COMPLETED BY- D. N. Morey TELEPHONE T2U5)899-5156 OPERATING STnTUS Notes l

1. Unit Name: Joseph H. Farley - Unit 2 1) Cumulative data since
2. Reporting Period: January 1991 7-30-81, date of
3. Licenseo Thermal Power (MVt): 2,652 commercial operation.
4. Nameplate Rating (Gross MVe): 860
3. Design Electrical Rating (Net HVe): 829
6. Maximum Dependable Capacity (Gross MVe): 864.2
7. Maximum Dependable Capacity (Net MVe): 824
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: Gross and Net Maximum Dependable Capacities (items 6 and 7) have been .;

changed due to evaluation of operating experience. -

9. Power Level To Which Restricted, If Any (Net HVe): N/A [
10. Reasons For Restrictions, If Any: N/A ,

a 1

This Month Yr-to-Date Cumulative

11. Ilours In Reporting Period _

744 744 83,353

12. Number Of Hours Reactor Vas Critical 677.7 677.7 71,061.9
13. Reactor Reserve Shutdown Hours 0.0 0.0 138.C
14. Hours Generator On-Line 613.5 613.5 70,164.7
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0  ;

, 16. Gross Thermal Energy Generated (HVH) 1,459,221 1,459,221 178,663,170  ;

17. Gross Electrical Energy Generated (HVH) 473,412- -473,412 58,679,368 _i
18. Net Electrical Energy Generated'(MVH) 444,644 444,644 155,638,766
19. Unit Service Factor 82.5 82.5 84.2
20. Unit Availability Factor .

82.5 82.5 84.2

21. Unit Capacity Factor (Using HDC Net) 72.5 72.5 81.5
22. Unit Capacity Factor (Using DER Net) 72.1 72.1 80.5
23. Unit Forced Outage Rate 0 0 4.3
24. Shutdowns Scheduled Over Next 6 Honths (Type, Date, and Duration-of Each):

N/A

25. If Shut Down At End Of Report Period, Estimated Date of Startup: N/A
26. Units In Test Status (Prior to Commercial Operation): ' Forecast Achieved INITIAL CRITICALITY 05/06/81 05/08/81 INITIAL ELECTRICITY 05/24/81 05/25/81 COMMERCIAL OPERATION 08/01/81- 07/30/81s i

Form 2/30 <

\

)

, i f

_ . . . i - . . = , .. -- - - -

- DOCKET NO. 364 UNIT' 2

DATE !- February 7, 1991 COMPLETED.BY D. N.-Morey TELEPHONE _(205)899-5156 MONTH January DAY AVERAGE DAILY POVER LEVEL DAY AVERAGE DAILY. POWER LEVEL:

(MVe-Net) '(MWe-Net)i 1 0 1 17, 840 2 0 ' 18 : _

840 3 0- -19 ~837 4 0 '20 836-5' O 21 '837' 6 16 -22 839 7 168 23 840E 8 195 24- 039' r 9 383 25- 839:

10 477 -26 783 11' 758 '27 838-12 831 28 832

13- 838 -29; '831-14 837 30 829-l 15 833 31- 836:

j . -16 . 835 .

. INSTRUCTIONS

. -On this format, list the average daily'., unit pover' level .in HVe-Net for each day-in I'

the reporting ~ month. Compute.to the nearestivhole megawatt.

.:.- .. , , . ...:-. .:: . . . . ,. a .. ..a. . . , . l

.- l

. i e L 6.

a

  • UNIT SHLN AND POWER REDUCTICIES DOCKET m . 50-364 ,

12 FIT NAfE J. M.'FARMY - UNIT 2 ,

DhTE February 7, 1991 CDNP M TED BY D. N. MuttET '

REPORT PEIffH JMEUNtf TEMPWOHr -(205)899-5156 '

l l ~l 1 I I nETuc.) or ItIcEnsEE I l- I c mse a a=REcrIvt I I ouRuIm I iEvENr i srsTwii m eoamer -I mIoN w I i i 1 .

,,,s

-Im.

1. nee IrrrE . I (umRs) i Rras=2 y,, ;I swerIm

,,,,,3 , , , , , , , , ,,,4  ; , ,,,y,,, _ _  ;

-l001 l910101, ? l .. S -

j129.2 l C l 1 l N/A l N/A -. l N/A . l The cycle .7-4 refueling outage continued free l 1 1- .1 I I I I I i !10-13-$o- I l' l- 1 I I I I l ' l- l .I

'l002 l910106 -l .. S - l.1.3 -l B l .N/A l R/it l R/A l R/A l The generator was taken offline for a turbine l

!~ l '- l- l l -l l~ l' l' .. l loverspeedtriptest. The reactor remained' l

.l -l l l l l l' l l l critical daring this test. l 1 1 1. 1 I .I' I -l I I i

'l: 1- ,

I i l l' I i l l- I-

1. ll l I l 'l .I I i 1; .I 1 -i l' l- 1 1 1 I I l- I l' I l- 'l -l i I I I i l~

l :I ' ,1 I 1 .1 - I .I 1- Ji-

'l :1. ll 1 -l 1 --l. I I l l' l- 1 1- i i ?l. -i -1 i. 1 l 1 l F  ! l 1 I 1. I 'l- l-

1 1 1 1 I i 'l- -l l 1..

I - 1: 1 11 .! 1 I l- 1 I I L1 IL .i T 11 '! - .i I i l i 1: 1 1:- :I -1 1- 1 l- :l l l

1- T  ! -1 -

- l- l-- _ i 1. -I l '-  !

IL w . l -- -1 .I

_ 1- 1 - l. l- I 1: I

.l. l-  !? 'l' 1: I + 1: -1 i l~ 'l c

I F5' Forced Reasoni MotlDd: Exhibit G-Instructions 2: Schemed - A-Erc2peent railure .(EsplaiM ' 1el for Preparation of Data B-Maintenance or Test f2-Menual Scris. Entry Sheets for licensee

.C-Refueling'

-)-Asatomatic Scras. Event Report (MR) File (IIIMthG-D-Regulatory Rodraction h r (Explain)' 0161).-

3.E-operator Training.a Lic e e Examination ,

I F-Administrative' EshihibI-SameSarce

. G-operational Errorc (Explain) -',

H-Other ..(Expla' int '

W

^ " - - -' " * ~ * ' --' #- ' ' ' ' " " '-- -"--'E'- " - ' ' " - -

"2''"I-~-' - - " " ' * ' " " - '

_.:_'.RC___'.,.

~

-