Monthly Operating Rept for Aug 1990 for Jm Farley Nuclear Plant Unit 2
ML20059J735
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 08/31/1990
From: Hairston W, Dennis Morey
ALABAMA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NA-90-5502, NUDOCS 9009200143
Download: ML20059J735 (5)


Text

.

t - Alabama Power Company a u*

  • . 40 invstness Osntar Parkwa/.

e . Post Office Box 1295

  • Birmingham, Alabama 35201 Telephone 205 868-5581 -

W. G Hairston, til Senior Vice President Nuclear Operations September 13,,1990 - %3 hag %%fCl - -

NA-90-5502 thesouthem ekctresystem i

n Docket No. 50-364 U. S. Nuclear Regulatory: Commission ATTN: Document Control Desk Washington,.D. C. 20555-Joseph M. Farley Nuclear. Plant Unit 2 Monthly Operating Data Report Attached is the August 1990 Monthly Operating" Report for Joseph M.~Farley.

Nuclear-Plant Specifications.

Unit 2, required by~Section 6.9.'l'.10!of'the Technical.

If you have any questions, please advise.

Respectfdlly submitted,.

gbA%

G. Hairston, III JARiedb3014 Attachments cci Mr. S. D. Ebneter Mr. S. T. Hoffman Mr. G. F. Maxwell 5

07 GOD 1 9009200143 900831 .

DR ADOCK05000ga ,

j /[

. s. .

r ,

JOSEPH H. FARLEY NUCLEAR PLANT

' UNIT 2 i NARRATIVE

SUMMARY

OF OPERATIONS August, 1990-There vere no unit shutdowns or significant-power reductions during the month of August.

The following major safety-related maintenance vas performed in'the month-  :

of Augusts s

1. Miscellaneous corrective and preventive maintenance was performed-c on the diesel generators.

2.

Adjusted.the stroke on turbine driven auxiliary feedvater pump to-2C steam generator flov' control valve. - Also performed  ;

miscellaneous corrective and preventive maintenance on the: turbine-driven auxiliary feedvater pump.

t 6

l '

i I

1' 1

1 o

~

l 14 e u a

d i

i

-l - a 4 e ,- -

_w s ,,,-a ,- , - - + - . ., , y - p

~

l ,

  • ', OPERATING DMR REP 0hT DOCKET NO. 50-364 DME September 7, 1990 '

OCBIPLETED BY D. N. Morey

'tELEPIKBef~{205)899-5156 -

OPERATING S1WEUS Notes

1. Unit Name: Joseph M. Farley - Unit 2 1) Cumulative. data since
2. Reporting Period: August 1990 7-30-81, date of
3. Licensed 'Iternal Power (PMt): 2,652 commercial operation.
4. Nameplate Rating-(Gross MNe): 860
5. Design Electrical Rating (Net W e): 829

.6. Maximum Dependable capacity (Gross Mwe): 868.6

7. Maximum Dependable Capacity (Net MWe): 828.2
8. If Changes Occur in capacity Ratings (Items Number 3 Through 7) Since-Last Report, Give Reasons: N/A
9. Power Level To Which Restricted, If Any (Net MWe): N/A
10. Reasons For Restrictions, If Any: N/A

'Ittis Month Yr-to-Date Cumulative

11. Hours In Reporting Period 744 -5,831 79,680
12. Number Of Hours Reactor Was Critical 744.0- 5,487.4 69,370.5 -
13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0 l
14. Hours Generator On-Line 744.0 5,470.8 68,542.8
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1.970,095 14,285,281 174,541,548 Lj
17. Gross Electrical-Energy Generated (MH) 636,670 4,674,686 57,341,228
18. Net Electrical Energy Generated (MWH) 606,178 4,443,994 54,387,384
19. Unit Service Factor 100.0 93.8 86.0 1
20. Unit Availability Factor 100.0 93.8 86.0 1
21. Unit Capacity Factor (Using MDC Net) -98.4 92.0 83.4
22. Unit Capacity Factor (Using DER Net) 98.3- 91.9 82.3
23. Unit Forced Outage Rate 0.0 1.6 4.2  !
24. ' Shutdowns Scheduled Over Next 6 Months -(Type, Date, and Duration of Each):

Refueling / Maintenance Outage, October 12, 1990, approximately-7 weeks. )

i

25. If Shut Down At End Of Report Period, Estimated Date of Startup: N/A
26. Units In Test Status (Prior to Commercial' Operation): Forecast- .{

Achieved

;1 1

INITIAL CRITICALITY 05/06/81 05/08/81 INITIAL ELECTRICITY 05/24/81 05/25/B1 Capes 3CIAL OPERATION 08/01/81 07/30/81-i Form 2/30 ,

3

i

-- . 4,.-

  • DOCKET NO.~ 50-364 UNIT. 2 ,

MTE September 7, _1990-C.T,'"2TED BY D. N. Morey -

t TELEPHONE (205)899-5156: l M0tml August F MY AVERAGE MILY POWER LEVEL MY AVERAGE MILY POWER LEVEL [

(MNe-Net)- q (PMe-Net) l 1 809 17 813  ;

l 2 816 18; 811 -

a 3 818- 19 815 >

8151  ?

4 817 20

~

5 794 21 815

.L 6 815 22- ,

'61S a i

7 818' 23 815- j 8 817 24 815:

9 817 25 813 L

l' 10 819- 26 813 11 824 27- 814 4 12 819 28 812 ,

P 13 820 29 812 14 819 30 813 15 815 '31 816 ,

L 16 816 {

INSTRUCTIONS

-On this format, list the average daily unit' power level in MWe-Net for each day'in the reporting month. Compute to the nearest whole megawatt'. i r

LForm 13/21 ,

l

..l t __ - . -. ., . - w _ , , . , ,

  • UNIT SRUTDOWNS AND POWER REDUCTIONS DOCERT NO. 50-364" ,.

UNIT NAME~ J. M. FARLET - UNIT.2 DATE- September 7, 1990

  • x CORPLETED ST p. f t. MORET . ' *i REPORT . N AUGUST TELEPBONE (2051899-5156 *4 1 l l 1 1 I METseD or -1I.ICENSEE I 1 l CmSE a wamECrIn 1 I .- 1 I I DvRATIoM i i SnUrrING I Ens 1 SYSTEx ! ConroNEWr i ACTIoM To 1-

-- l No. l DATE l TYPE .l (NOURS) l REASON l DOWN REACTOR l REPORT $ 1 CODE I CODE l PRETEWr RECURRENCE _... 'l' lThsre were no unit shutdowns or significant power reductions during the month of August. l l l l l 1 1 I I I I I .l.

1 I I -l i I I I I l- 51 ~ -

I .I I i i l i I i 1. 'l l i I I i i i I I I l- -

1 I I I I I i l l 1 1 1 -l l I I I I I I I - 1.

! :1 i i i l I I I i i i i l i l I I i i I l-1 I I I I I i 1 1 I I l- 1 I I I I I I I I I I I I I I I i i I i 1.

I I I I I i l i i 1 l-1 I I I i  ! I l I l- 1.

I I I I I I l I l -l -1 1 l l l l l l 1 l- 1. 1:

I l l l l I 'l 1 I l .1-1 I I I I I l I. I I - 1 l i I I i i  ! 1 I l- l '

I I I l l 1 1 1 I I- _ li l- 1 1 1 1 l I- 1 I I I l~ l i I I I -l l I -1 -1 l

' F: Forced- Reason: Method: Ezhibit G-Instructions _

S: Scheduled A-Equipment Failure.(Explain) 1-Manual for Preparation of Data B-Maintenance or. Test 2-Manual Scram. Entry Sheets for Licensee .

C-Refueling '.3-Automatic Scram. Event Report lLER) File (NUREG-D-Regulatory Restriction - 4-Other.(Emplain) 0161).

E-Operator Training.s License Examination-5 F-Administrative ' - Exhibit I -Same Source ..

G~ operational Error (Explain)-

H-other (Explain) -

~ 'IIDI Rxri 3/2