Forwards IE Insp Repts 50-400/82-07 & 50-401/82-07 on 820308-12 & Notice of Violation
ML20054G941
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 04/19/1982
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Jackie Jones
CAROLINA POWER & LIGHT CO.
Shared Package
ML20054G931 List:
References
NUDOCS 8206220430
Download: ML20054G941 (2)


See also: IR 05000400/1982007

Text

. .

- -

pen

Ml 1 3 1982

Carolina Power and Light Company

ATTN: Mr. J. A. Jones, Senior Exec tive

Vice President and Chief

Operating Officer

411 Fayetteville Street

Raleigh, NC 27602

Gentlemen:

Subject: Report Nos. 50-400/82-07 and 50-401/82-07

This refers to the routine audit :onducted by Mr. R. W. Wright and others of

this of fice on March 8-12, 1982, )f the quality assurance program for design,

procurement, and construction of .he Shearon Harris facility as authorized by

NRC Construction Permit Nos. CPPR 158 and CPPR-159. Our preliminary findings

were discussed with Mr. H. R. Bani.s. Manager Corporate Quality Assurance, at

the conclusion of the inspection.

Areas examined during the inspection and our findings are d scussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

During the inspection, it was found that certain activities under your license

appear to violate NRC requirements. This item and references to pertinent

requirements are listed in the Notice of Violation enclosed herewith as

Appendix A. Elements to be included in your response are delineated in

Appendix A.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures will

be placed in the NRC's Public Document Room unless you notify this office, by

telephone, within ten days of the date of this letter and submit written appli-

cation to withhold information contained therein within thirty days of the date

of this letter. Such application must be consistent with the requirements of

2.790(b)(1).

The responses directed by this letter and the enclosures are not subject to the

clearance procedures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, PL 96-511.

8206220430 820608

PDR ADOCK 05000400

G PDR

)

- ,

- .

. .

. *

Carolina Power and Light Company 2 19 19R

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

M

R. C. Lewis, Director

Division of Project and

Resident Programs

Enclosures:

1. Appendix A, tiotice of Violation

2. Inspection Report flos. 50-400/82-07

and 50-401/82-07

cc w/ encl:

R. Parsons, Site Manager

, blind 2 5

bcc w/ encl:

IIRC Resident Inspector -

Document fianagement Branch

State of florth Carolina

.

  • // ,

/ldsciet:ntn MCwJpright ARHerdt C an FJ Long

4: 382 4/Qf 32 4/, , /82 4/jc/82 4ff'82