Forwards Info Packages Identified in Util 820419 Ltr Supporting Justification for Interim Operation of Equipment Not Qualified to Seismic Qualification Review Team Criteria
ML20052B162
Person / Time
Site: Grand Gulf, Zimmer
Issue date: 04/26/1982
From: Dale L
MISSISSIPPI POWER & LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20052B163 List:
References
AECM-82-190, NUDOCS 8204300101
Download: ML20052B162 (4)


Text

MISSISSIPPI POWER & LIGHT COMPANY Helping Build Mississippi EmmHhtuddB P. O. B O X 16 4 0. J A C K S O N. MIS SI i 05

\

April 26, 1982 Y < D

,  :: D-nuctrAn encoucitoN DEPARTMENT { // b U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation f [ ff'/

c/ R 3

gk '

Washington, D.C. 20555 , ['(('y j.;

se <s Attention: Mr. Harold R. Denton, Director fg d'W o f l hp

Dear Mr. Denton:

SUBJECT:

Grand Gulf Nuclear Station Units 1 and 2 Docket Nos. 50-416 and 50-417 File 0260/L-814.2 SQRT; Additional Information Supporting Justification for Interim Operation

References:

AECM-82/128; April 5, 1982 AECM-82/173; April 19, 1982 AECM-82/190 Mississippi Power & Light Company's (MP&L) letter of April 19, 1982 (AECM-82/173) transmitted to the NRC additional information to support MP&L's initial Justification for Interim Operation submitted on April 5,1982 (AECM-82/128) for equipment not qualified to the SQRT criteria.

The purpose of this letter is to provide the NRC/EQB with the information packages identified in MP&L's letter of April 19, 1982 (AECM-82/173) and hand delivered to the NRC/EQB during MP&L's and NRC/EQB's meeting on Wednesday, April 21, 1982, to discuss MP&L's Justification for Interim Operation for equipment not qualified to the SQRT criteria.

The following information is provided:

A. Attachment No. 1 9P,Q Main Steam Isolation Valve (B21-F022/F028)

[ be Y ) Rev. 1 of the April 17, 1982 MSIV Justification for Interim

', \ Operation is provided. Rev. I has three (3) corrections (G% incorporated.

dA iy, 1) Page 7: Natural frequency changed from 13 Hz to 28 Hz

2) Page 8: Moment of 280 in-lbs to 945,663 in-lbs
3) Page 8: Moment of 263 in-lbs to 752,043 in-lbs 8204300lol 9w AE2Y1 Member Middle South Utilities System e )

a AECM-82/190 MICISSIPPI POWER O LI2HT COMPANY Page 2 4

B. Attachment No. 2 Justification for Interim Operation for HPCS Valve Actuator (E22-FC01/F004/F010/F011/F012/F015/F023)

C. Attachment No. 3 Justification for Interim Operation for HPCS Diesel Generation System (E22-S001/S002/S003/S004)

E22-S002/S003/S004 are qualified. E22-S001 is not.

D. Attachment No. 4 Electroswitch Series 20K switches on Panel H13-P601 The following information is provided:

1) Seismic and Hydrodynamic Loads Requalification Certification, dated April 20, 1982
2) Excerpts (2) from initial Seismic Qualification Re-evaluation Package, dated March 27, 1981
3) Electroswitch Corporation Engineering Test Report No. 2392-10
4) Electroswitch Corporation Engineering Test Report No. 1981-2 All switches identified in MP&L's letter of April 5, 1982 (AECM-82/128) are qualified to the SQRT criteria.

! E. Attachment No. 5 Pressure Indicator (B21-R005/R009)

The following information is provided:

1) B21-R005; Seismic & Hydrodynamic Loads Requalification Certification, dated April 20, 1982. (B21-R005 is now qualified.)
2) B21-R009; Justification for Interim Operation If you have any questions or require further information, please contact this office.

Yours truly,

/.

L. F. Dale h

j Manager of Nuclear Services RAB/SHH/JDR:Im 1

Attachments: (See Next Page)

AE2Y2 l

L

AECM-82/190 MIKISSIPPI POWER Q LICHT COMPANY Page 3 Attachments: 1. Main Steam Isolation Valve

2. HPCS Valve Actuator
3. HPCS Diesel Generator Systems
4. Switches (Electroswitch 20K)
5. Pressure Indicator cc: Mr. N. L. Stampley (w/o)

Mr. G. B. Taylor (w/o)

Mr. R. B. McGehee (w/o)

Mr. T. B. Conner (w/o)

Mr. Richard C. DeYoung, Director (w/o)

Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Mr. J. P. O'Reilly, Regional Administrator (w/a)

Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission Region II 101 Marietta St., N.W., Suite 3100 Atlanta, Georgia 30303 AE2Y3 I

I t

k ATTACHMENT NO. 1 Main Steam Isolation Valve B21-F022/F028 i

}

4 f

a i

1 AE2ZI

. , . _ - - _ , . . ._-. _ , , ,. . _ _ , , _ . , - _ . . - - , , . , , - , , . . - . _ _ . . , _ . . . . , , , , . . . , . . _ . . , . - - . , - - _ _ _