4

' GRAND GULF NUCLEAR >

STATION i UNITS 1 & 2 SEISMIC QUALIFICATION REEVALUATION CLASS 1E EQUIPMENT I .

COMPONENT NAME: CONTR01 ROOM PAnete MPL OR EDL ITEM NO.: AS ATTACHED i

! MPL

REFERENCE:

H13-P601 l

THE SEISMIC QUALIFICATION REPORT (S) IDENTIFIED HEREIN HAVE BEEN EVALUATED AND REQUALIFIED WHERE NECESSARY TO SHOW THAT THE ABOVE-MENTIONED COMPONENT IS CAPABLE OF MEETING THE NUCLEAR REGULATORY COMMISSION SEISMIC QUALIFICATION REVIEW TEAM (SORT) REQUIREMENTS.

1 16 / pI I.B.

PREPARED BY. YNF DATE MARCH 27, 1981 l

1 ORGANIZATION ScienCO ADDlications. Inc ,

l REVIEWED BY:

R. H. Hardy g,7g /' d a/ M N SORT PROGRAM MANAGE APPROVED BY. S. E. Hassan 1 6 M oxyg 3 t 7 -W RESPONSIBLE DESIGN ENGINEER GENERAL @ ELECTRIC 8 2 0 4 3 083 'l k a 3-2

e f =

Ovalification suma$r of Ecutoment ,

I. Plant Name: GRAND GULF g

1. Utility: MISSISSIPPI POWER & LIGHT PWR
2. NS$$: GE 3. A/E: BECHTEL BWR 6 Mk III II. Component Name Control Room Panel
1. Scope: [X3MSSS []B0P l
2. Model Number: H13-P601 Quantity: one
3. Vendor: General Electric Co.
4. If the component is a cabinet or panel, name and sedel No. of 'the devices included: See attached device list
5. Physical Description a. Appearance Vertical / Bench Board
b. Dimensions 117.5" X 84" x30" NA
c. Weight
6. Location: Building: Co'ntrol Elevation: See attached device list
7. Field Mounting Conditions [X3 Bolt (No. * . Size 5/8" )

} Weld (Length )

  • On 6" centers.
8. a. System in which located: Reactor Core Coolino system

, b. Functimal

Description:

Reactor Core Coolino Bench Board 1

c. Is the equipment required for [ ] Hot Standby [] Cold Shutdown

[X] Both [] Neither

9. Pertinent Reference Design Specifications: coa refo,anco 4.3.4 l

l 12/80 3-3

2 III. Is Eouipment Available for Inspection in the Plant: [X3 Yes [] No IV. Equipment Qualification Method:

[x 3 Test [3 Analysis [ 3 Combination of Test and Analysis Qualification Report *: Seismic Test Report'H12-P870 (No. , Title and Date) See Reference 4.3.1 _-

Compay that Prepared Report: General Electric Co.

I Compav that Reviewed Report: General Electric Co.

V. Vibration Input:

1. Loads considered: a.[X3 Seismic only b.C 3 Hydro (ynamic only c.[ 3 Explosive c d.[. 30ther_(Specify) e.[ 3 Combination of
f. Method of Combining RRS: [ ] Absolute Sum [ 3SRSS [X] NA

, (other, specify)

.. _ 2. Required. Response Spectra (attach the graphs): See section 2

3. ' Damping. Corresponding to RRS: OBE 3% SSE 3%
4. Required Acceleration in Each Direction: [x3ZPA [ 30ther OBE ,_S/S_=

.254 pfg . .254 V f*E'".tibf)

SSEl__ SIS.= .507 F/B = .50/ V= .239

5. Is long-term vibration load effects considered [ 3Yes [x JNo
  • Note: The H13-P601 panel is simi.lar to the tested prototype H12-P870 panel.

The results of the H12-P870 test were applied to the H13-P601 panel per the methodology described in the text.

l 3-4

- 12/80

3 VI. If Qualification by Test, then Complete:

[ ] random

1. [ ] Single Frequency [X3 Multi-Frequency: [ ] sine beat

[x] rn and out-of-ohnso

2. [ ] Single Axis [X3 Multi-Axis 5 SSE 1 Other .
3. No. of Qualification Tests: 08E (specify)
4. Frequency Range: 1-33 Hz
5. Natural Frequencies in Each Direction (Side / Side, Front /Back,, Vertical):

S/S = 13 F/B = 15.5 V= None l

6. Method of Detenntning Natural Frequencies l

[ ] Insitu Test [ ] Analysis

[x] Lab Test

7. TRS enveloping RRS using Multi-Frequency Test [X3 Yes (Attach TRS & RRS grap!

[ ] No See Section 2

8. Input g-level Test: OBE S/S = 1.0 F/B = 1.0 V= 1.0 SSE S/S = 1.5 F/8 = 1.5 V= 1.5
9. Laboratory Mounting: (All mounting holes used).
1. [X3 Bolt (No. , Size 5/s ) [] Weld (Length- ) [x] clamne
10. Functional operability ve..fted: [ XJ Yes [ ] No [ ] Not Applicable
11. Test Results including modifications made: The Danel maintained its l

structural integrity and the devices performed their Class IE function.

12. Other test perfonned (such as aging or fragility test, including results):

Fragility test results were applied as noted on the device list to establish seismic capability of certain devices.

l l

1 12/80 3-5 l

I

4 VII. If Qualification by Analysis or by the Combination of Test and A9alysis, then Conclete:

1. Descripition of Test including Results: NA
2. Method of Analysis:

[ ] Static Analysis [ ] Equipment Static Analysis

. [ ] Dynamic Analysis: [ ] Time-History

" [ ] Response Spectrum

3. Natural Frequencies in Each Direction (Side / Side Front /Back. Vertical):

S/S = F/B = V=

4. Method of Determining Natural Frequencies

[ ] Lab test -

[ ]Insitu Test [ ] Analysis.

5. ' Model Type: [ ] 3D []2b [][D

[ ] Finit Element [ ] Beam [ ] Closed Form Solution

6. [ 3' Computer Codes:

Freque,ncy Range and No. of modes considered:

[ ] Hand Calculations ,

7. Method of Combining Dynamic Responses: [ ] Absolute Sum [ ] SRSS

' ~

[ 30ther:

(specify)

8. Damping: OBE Basis for the damping used:

SSE ._

9. Support Considerations in the model:

Critical Structural Elements:

~

10.

Governing Load or Response Seismic Total Stress A. Identification Location Combination Stress Stress Allowable Maximum Allowable Deflection B. Max. Critical to Assure Functional Oper-Deflection Location ability 3-6 12/80

  • ISMIC QU-ALIFICATION REEYALUATION 117.5 INCH WIDE CONTROL ROOM PANEL N" LASS 1E EQUIPMENT j

i Panel MPL Ref: H13-P601 .

System: Reactor Core Cooling Bench Board i Location, Elevation: Central Floor, 166' .

Panel Dimension: 117.5" x 84" X 30" '

l CURRENT SEIS!!IC l l

' l . CAPABILITY / l MAXIMUM EXPECTED l I MALFUNCTION "-'

LIMIT l PEAK ACCELERATION l EQUIPilENT ,

f l I i j MPL NO2 DESCRIPTION ' / IDENTIFICATION l f-b s-s v I f-b s-s v l REMAPES ,

3 E12A-S07B l Switch -

l 145C3040P013 1 20 1 20 1 20 1 11.7 l 1.7 10.3 l See Note 3.1.3 S10BC 1, l l 1 l l l l l S12BC l- l l l l l l l l S16BC l- l l l l l l l l S35B S36B

'l l _l l l l l l l I -

l _ i l l l l l 1 l

S37B l .l l l 1 l l l l

- S39B l 'l . .I l l l l l l

,- S40B l l l l l l l l

, l S54B l l

, I .1- l l l- l l

/- S58B l I I 'l- l l

, l l l-F ,

S59B l , l l l l l l l l S688  ; ' '

,  ;  ; j i j -

569B  ; ' i E12A-S03BC l Switch l 272A7689P001 l - 1 -

I -

l 11.7 1 1.9 1 0.3 IInsuficient Data E12A-SO4BC l Switch l 145C3040P007 l 20 l 20 l 20 l 11.7 l 1.8 l 0.3 l See Note 3.1.3 E12A-S04B-1 l Switch l 145C3040P018 l 20 l 20 1 20 l 11.7 l 2.0 1 0.3 l See Note 3.1.3 SO4C-1 1 I l l 1 l l l l E12A-S20BC l Switch l 145C3040P001 1 20 1 20 1 20 1 11.7 l 1.9 1 0.3 1 See Note 3.1.3 E12A-S60 l Switch l 145C3040P004 l 20 l 20 1 20 l 7.8 l 2.0 1 0.3 l See Note 3.1.3 E12A-S61 l Switch 1 145C3040P006 1 20 1 20 1 9n 1 7.8 l 1.6 1 0.3 l See Note 3_1.t E12A-S57 l Switch 1 2T2A7561P002 l l l l 11.7 l 1.9 1 0.3 lInsuficient Data noin. conn e, i e., % . s eicconsinonnx  ! yn  ! vn e. w _t 7 r i ic e a, e e -- i.+ - .-

P SEISMIC QUALIFICATION REEYALUATION 117.5 INCH WIDE CONTROL ROOM PANEL CLASS 1E EQUIPMENT Panel MPL Ref: H13-P601 System: Reactor Core Cooling Bench Board Location, Elevation: Central Floor, 166' Panel Dimension: 117.5" X 84" X 30" l CURRENT SEISMIC 1 l l CAPABILITY / l MAXIMJM EXPECTED l l MALFUNCTION LIMIT I PEAK ACCELERATION I EQUIPMENT l l l MPL NO. DESCRIPTION IDENTIFICATION l f-b s-s v I f-b s-s v 1 -REMARKS B21H-S76B l Switch 1 145C3040P006 l 20 1 20' l 20 17.8 l 1.6 1 0.3 1 Sec .!ote 3.1.3 C41 A-S06B i l l l l l l l l B21H-S24B l Switch, Contact Block i 145C3040P009 l 20 1 20 l 20 111.7 l 2.0 1 0.3 1 See Note 3.1.3

- S24D-1 l l l l l 1 1 I l 1 Switch. Contact Block i 145C3040P010 1 20 1 20 1 20 1 11.7 l 1.9 1 0.3 l See Note 3.1.3

{l,B21HSI5B-1, lC41 A-S06B-1 Contact Block l 145C3040P009 1 20 1 20 1 20 1 11.7 1 2.0 1 0.3 1 See Note 3.1.3 B21H-S33 l Switch l 272A8971G001 1 7.51 4.0 l 10 1 3.6 l 1.6 1 0.3 l See Note 3.1.14 B21H-S75 l Switch l 145C3040P004 l 20 1 20 1 20 1 7.8 1 2.0 1 0.3 l See Note 3.1.3 C41A-S05B i l l I I I l I l h21H-S76B-1 l Switch, Contact Block l 145C3040P010 l 20 1 20 1 20 l 11.7 l 1.9 1 0.3 l See Note 3.1.3 C41A-S01B l Switch  ! 272A7561P001 l -

I -

I - l 4.9 l 2.0 1 0.3 lInsuficient Data B21H-S01A.D l Switch 1 145C3040P015 1 20 l 20 l 20 l 11.7 l 1.9 1 0.3 l See Note 3.1.3 B21H-S03A,0 l Switch l 145C3040P017 l 20 l 20 1 20 l 11.7 l- 1.9 l 0.3 i See Note 3.1.3 B21H-S05 l Switch . I 145C3040P019 l 20 1 20 1 20 1 11.7 l 1.9 1 0.3 1 See Note 3.1.3 SW i I i l I I I I l B21H-S05-1 1 Switch, Contact Block I 145C3040P010 l 20 l 20 l 20 1 11.7 l 1.9 1 0.3 i See Note 3.1.3 S27-1 1 I I I I I I I I B21C-S30AB l Switch: Pushbutton i 145C3230P004- l 10 1 10 110 1 3.6 l 1.6 I 0.3 I ee S Note 3.1.3 S31AB l l l l l l l l l B21C-S12AB l Switch 1 145C3040P020 1 20 1 20 1 20 1 1.2 1 1.1 1 0.3 l See Note 3.1.3 S13AB l l I i l I I i l B21C-S38A.E I Switch 1 145C10403132 1 ?@ l ?n I ?n l99 1 1 1_ l n1 I saa Mota 1 1 1

E SEISMIC QUALIFICATION REEVALUATION 117.5 INCH WIDE CONTROL ROOM PANEL CLASS 1E EQUIPMENT Panel MPL Ref: Il13-P601 System: Reactor Core Cooling Bench Board Location, Elevation: Central Floor,166' Panel Dimension: 117.5" X 84" X 30" l CURRENT SEISMIC l l l CAPABILITY / l MAXIMUM EXPECTED I l HALFUNCTION LIMIT l PEAK ACCELERATION l EQUIPMENT l l l MPL NO. DESCRIPTION IDENTIFICATION I f-b s-s v I f-b s-s v l REMARKS B21H-S388,F l Switch 1 145C3040P002 l 20 l 20 1 20 1 1.2 1 1.1 10.3 l See Note 3.1.3 B21C-S37AB i Switch l 145C3040P004 l 20 l 20 1 20 17.8 l 2.0 1 0.3 1 See Note 3.1 3

,, C41A-S05A l l l l 1 I l l I d3 B21H-S24A l Switch, Contact Block i 145C3040P009 l 20 1 20 1 20 11 1 . 7 1 2.0 1 0.3 l See Note 3.1.3 S24C-1 l l l l l l l l l j B21H-S24A,C l Switch i 145C3040P006 l 20 i 20 1 20 l 7.8 l 1.6 1 0.3 1 See Note 3.1.3

B21H-S76A-1 l Switch, Contact Block i 145C3040P010 1 20 1 20 1 20 11 1 . 7 l 1.9_l 0.3 I See Note 3.1.3 B21H-S32 1 Switch 1 27?A8971P001 1 7.51 4.0 l 10 13.6 l 1.6 I 0.3 l See Note 3.1.14 B2111-S74 l Switch -

l 145C3040P044 l 20 1 20 l 20 14.6 l 2.0 10.3 l See Note 3.1.3 i

B21H-S76A l Switch 1 145C3040P006 l 20 ,120 1 20 17.8 l 1.6 1 0.3 l See Note 3.1.3 C41A-S01A l Switch 1 272A7561P001 1 l

1 14.9 1 2.0 1 0.3 l Insuficient Data C41A-S06A-1 l Switch, Contact Block i 145C3040P009 1 20 20 1 20 11 1 . 7 1 2.0 1 0.3 l See Note 3.1.3 E12A-S61-1 Switch, Contact Block 145C3_040P010 H 20 20 ' 20 l 1.0 ln3 C41A-S06A Switch 11 1 _ 7 I saa Nata 1 1_3 17.8 20 l See Note 3.1.3 145C3040P006___  ! 20 20 l 1.6 10.3 B21H-S74-1 Switch 145C3040P018 20 20 20 11.7 2.0 0.3 Sep Nate 3.1.3 521R-S28-1 Switch. Contact Block la5C3040P010 20 20 2n 11 7 1_o 0.3 See_ Note 3_1_3 B21H 329-1 l Switch  ! 145C3040P010  ! 20 1 20 1 20 11 1 . 7. I 2.0 10.3 l_Sep Note 3.1.3 B21H-S18 l Switch  ! 1dscandnpnn1  ! 20 1 20 1 20 !11.7 1 1.9 10.3 I See Note 3_1.3 B23H:301 1 Switch  ! 149C3040P001 1 20. I 20 I 20 111.7 1 1.9 I O.3 l Sep Nnto 3.1.3 E51A-S17 i Switch  ! 145C3040P001 1 20 1 20 1 20 11 1 . 7 1 1.9 10.3 i See Note 3.1.3

SEISMIC QUALIFICATION REEYALUATION 117.5 INat WIDE CONTROL ROOM PANEL CLASS 1E EQUIPMENT Panel Dimensions: MPL Ref: H13-P601 System: Reactor Core Cooling Bench Board Location, Elevation: Central Floor,166' Panel Dimension: 117.5 X 84" X 30"

. 1 CURRENT SEIS!!IC l l l CAPABILITY / l MAXIMUM EXPECTED l

~ l HALFUNCTION LIMIT l PEAK ACCELERATION l EQUIPMENT l I l i

MPL No. DESCRIPTION IDENTIFICATION l f-b s-s v I f-b s-s v l REMARKS B21A-S20A.D l Switch l 145C3040P007 l 20 l 20 l 20 l11.7 l 1.8 l 0.3 i See Note 3.1.3 go B21A-S20A.D-;l Switch, Contact Block l 145C3040P009 l 20 l 20 l 20 111.7 12.0 10.3 lSee Note 3.1.3 g; B21C-S08A l Switch 1 145C3040P022 l 20 l 20 l 20 l 11.7 l 1.8 10.3 iSee Note 3.1.3 SO9A l l l l l l 1 l l thru S11A l l l l l l l 1, l S15A l l l l l l l l l S17A l l l l l l l l l thru S29A l l l l l l l l 1 S32A I l l l l l l l. l S33A l l l l l l l l' l B21H-S02A,0l Switch 1 145C3040P015 l 20 l 20 1 20 111.7 l 1.9 10.3 lSee Note 3.1.3 l B21H-SO4A.D l Switch 1 145C3040P017 l 20 l 20 l 20 l11.7 l 1.9 10.3 iSee Note 3.1.3 B21H-S06 l Switch i 145C3040P019 l 20 1 20 1 20 l11.7 l 1_4 I n.3 lSee Nnto 3.1_3 B21H-S37 i Switch l 145C3040P019 l 20 1 20 1 20 l11.7 l 1.9 l 0.3 lSee Note 3.1.3 S38 I l l l l 1 I l l S35 l l l 1 l 1 I l 1 S36 l l l l l l l l l S28 l l l l l l l -l l S29 l l l 1 I l l l l B21H-S06-1 l Switch, Contact Block l 145C3040P010 1 20 1 20 l 20 111.7 l 1.9 l 0.3 l See Note 3.1.3 l

335-1 I l l l l l 1 1 I thru S38-1 l l l l l l l l l

i SEISMIC QUALIFICATION REEVALUATION 117.5 INCH WIDE CONTROL ROOM PANEL CLASS 1E EQUIPMENT Panel MPL Ref: H13-P601 System: Reactor Core Cooling Bench Board Location, Elevation: Central Floor, 166' Panel Dimension: 117.5" x 84" x 30" I CURRENT SEISMIC l l l CAPABILITY / I MAXIMUM EXPECTED l I HALRJNCTION LIMIT l PEAK ACCELERATION I EQUIPMENT l l  ! l MPL NO. DESCRIPTION IDENTIFICATION I f-b s-s v I f-b s-s v l REMARKS B21H-S26A l Switch 1 145C3040P001 1 20 1 20 1 20 1 11.71 1.91 0.3 1 See Note 3.1.3 E12A-S64A I l l 1 l l l l l E12A-S62A l Switch l 145C3040P006 l 20 l 20 1 20 l 7.81 1.61 0.3 l See Note 3.1.3 E12A-S62A-1 l Switch, Contact Block l 145C3040P010 l 20 l 20 1 20 1 11.7 l 1.9 l 0.3 i See Note 3.1.3

)$

E12A-S63A l Switch: Pushbutton i 145C3230P004 l 10 1 10 1 10 1 3.6 l 1.61 0.3 l See Note 3.1.3 E12A-S41A I Switch i 145C3040P003 1 20 l 20 1 20 1 11.7 l 1.9 1 0.3 l See Note 3.1.3 E12-R602A l Indicator Unit i 164C5288P163026 l 18 l 18 17 l 4.0 1 1.7 1 0.3 1 See Note 3.1.3 R603A I l l l l l l l l B21H-S10 l Switch l 145C3040P019 l 20 1 20 l 20 1 11.7 l 1.9I 0.3 l See Note 3.1.3 S12 l l l l l l l l- l S13 I I I I I I I I I B21H-S10-1 l Switch, Contact Block i 145C3040P010 1 20 1 20 l 20 1 11.7 l 1.91 0.3 l See Note 3.1.3 S12-1 l l l l l l l l 1 S13-1 1 I I I I I I I I B21H-S17 l Switch 1 145C3040P003 1 20 1 20 1 20 1 11.7 l 1.91 0.3 l See Note 3.1.3 E12A-S06A 1 l l l l l l l l E12A-S34A l l l l l l l .I I E12A-S02A l Switch 1 145C3040P013 l 20 1 20 1 20 1 11.7 l 1.9 l 0.3 l See Note 3.1.3 SO5A I l l l l l l l l SWA l l l l l l l l l S10A l l l l l l l l l S12A l l l l l l l l l

4 SEISMIC QUALIFICATION REEYALUATION 117.5 INCH WIDE CONTROL ROOM PANEL CLASS 1E EQUIPMENT Panel MPL Ref: H13-P601 System: Reactor Core Cooling Bench Board Location, Elevation: Central Floor, 166' Panel Dimension: 117 5" X 84" X 30" 9

l l CURRENT SEISMIC l l

! I CAPABILITY / l MAXIMUM EXPECTED l

) l MALFUNCTION LIMIT l PEAK ACCELERATION l l EQUIPMENT l l i l MPL NO. DESCRIPTION IDENTIFICATION l f-b s-s v I f-b s-s v l REMARKS B21H-S26B l Switch l 145C3040P001 l 20 l 20 1 20 1 11.7 l 1.9 l 0.3 l See Note 3.1.3 E12A-S56 l l l l l l l l l E12A-S64B l l l l l l l l l

{l E12A-S21 l Switch: Pushbutton i 145C3230P004 l 10 l 10 l 10 1 3.6 l 1.61 0.3 lSee Note 3.1.3 r*

E12A-S43BC l Switch 1 145C3040P004 l 20 1 20 l 20 l 7.8 l 2.01 0.3 l See Note 3.1.3 E12A-S$3B l Switch l 145C3230P004 1 10 1 10 1 10 1 3.6 3 1.61 0.3 ! See Note 3.l.3 ,

E12A-S62BC l Switch 1 145C3040P006 l 20 l 20 l 20 l 7.8 1 1.6 l 0.3 l See Note 3.1.3 E12A-S62B-1 l Switch, Contact Block l 145C3040P010 l 20 l 20 1 20 l 11.7l 1.91 0.3 l See Note 3.1.3 S62C-1 l l l l l l l l l E12A-S41B l Switch 1 145C3040P003 1 20 1 20 1 20 1 11.7 l 1.91 0.3 l See Note 3.1.3 l

E12-R602B l Indicator Unit l 16405288P163026 l 18 l 18 l7 1 4.0 l 1.7 l 0.3 l See Note 3.1.3 R603BC l l l l l l l l l B21H-S09 l Switch l 145C3040P019 l 20 1 20 1 20 l 11.7l 1.91 0.3 l See Note 3.1.3

- S14 l l l l l l 1 l l B21H-S09-1 l Switch, Contact Block l 145C3040P010 1 20 l 20 l 20 l 11.7l 1.9 l 0.3 l See Note 3.1.3

- S14-1 l l l l l 1 l l l B21H-S69 l Switch l 145C3040P003 1 20 l 20 l 20 l 11.7l 1.91 0.3 l See Note 3.1.3 S70 l l l l l l l l l E12A-S06B l l l l l l l l l E12A-S34B l l I i 1 I l l l E12A-S02B l Switch 1 145C3040P013. l 20 1 20 1 20 1 11.71 1.91 0.3 l See Note 3.1.3 S05B l l l l l l l l I

i -

SEISMIC QUALIFICATION REEYALUATION 117.5 INCH WIDE CONTROL ROOM PANEL CLASS 1E EQUIPMENT Panel MPL Ref: H13-P601 System: Reactor Core Cooling Bench Board Location, Elevation: Central Floor, 166' Panel Dimension: 117.5" X M" X 30" l CURRENT SEISMIC l l CAPABILITY / MAXIMUM EXPECTED l l MALFUNCTION LIMIT l PEAK ACCELERATION l

! EQUIPMENT l l j l MPL NO. DESCRIPTION IDENTIFICATION l f-b s-s v I f-b s-s v l REMARKS

! E12A-S16A I Switch . l 145C3040P013 l 20 1 20 l 20 l 11.7 1 0.9l'0.3 l See Note 3.1.3 i S35A l l l l l l l l l u2 S36A l l l l I  ! I

' d; l -- S54A j l l l l [

1 l

l l l S58A l l l l l l l l l S59A l l l l l l l l l S68A l l l l l l l l l S69A I l l l l l l l l E12A-S03A l Switch l 272A7689P001 1 - I -

1 - l 11.7 l 1.9 1 0.3 I Insufucient Data E12A-SO4A I Switch l 145C3040P007 l 20 l 20 l 20 l 11.7 l 1.8 I 0.3 l See Note 3.1.3 E12A-SO4A-1 i Switch i 145C3040P018 l 20 l 20 1 20 1 11.7 1 2.0 1 0.3 l See Note 3.1.3 E21A-S08 l Switch l 145C3040P001 l 20 l 20 l 20 l 11.7 l 1.9 l 0.3 l See Note 3.1.3 E51A-S18 l l l l l l l l l

E51A-S23 l l l l l l l l l l E21A-SO9 l Switch
Pushbutton l 145C3230P004 1 10 1 10' l 10 1 3.6 1 1.6 1 0.3 l See Note 3.1.3 -

E21A-S10 l Switch l 145C3040P004 l 20 l 20 l 20 1 7.8 l 2.0 1 0.3 l See Note 3.1.3 E21A-S11-1 l Switch l 145C3040P010 1 20 l 20 l 20 1 11.7 l 1.9 l 0.3 l See Note 3.1.3 E21A-S11 l Switch 1 145C3040P006 1 20 l 20 l 20 1 7.8 l 1.6'l 0.3 i See Note 3.1.3 E21-R600 l Indicator Unit l 164C5288P163026 l 18 1 18 17 1 4.0 1 1.7 1 0.3 i See Note 3.1.3 E51A-S16 l Switch 1 145C3040P006 l 20 1 20 1 20 1 7.8 l 1.6 1 0.3 l See Note 3.1.3 S25 l l 1 l l 1 l l l S41 l l l l l l l l l .

SEISMIC QUALIFICATION REEVALUATION 117.5 INCH WIDE CONTROL ROOM PANEL CLASS 1E EQUIPMENT Panel MPL Ref: H13-P601 System: Reactor Core Cooling Bench Board Location, Elevation: Central Floor, 166' Panel Dimension: 117.5" x 84" X 30" l CURRENT SEISMIC l l l CAPABILITY / I HAXIMUM EXPECTED l l MALFUNCTION LIMIT l PEAK ACCELERATION I EQUIPMENT l l i l MPL NO. DESCRIPTION IDENTIFICATION l f-b s-s v I f-b s-s v l REMARKS E51A-S42 l Switch i 145C3040P006 l 20 1 20 l 20 l 7.8 l 1.61 0.3 i See Note 3.1.3 l E51A-S19 l Switch 1 145C3040P004 1 20 l 20 1 20 17.8 1 2.0 l 0.3 l See Hote 3.1.3 S20 l l l l l l l l 1 S37 l l l 1 1 I I I I c, E51A-S41-1 i Switch, Contact Block i 145C3040P010 l 20 1 20 l 20 l 11.7 l 1.91 0.3 l See Note 3.1.3 Jo -

S42-1 l l 1 l l l l l l E51A-S16-1 l Switch, Contact Block l 145C3040P009 l 20 1 20 1 20 l 11.7 1 2.01 0.3 l See Note 3.1.3 S25-1 l l l l l l l l l E51-K601 l Sq. Root Converter i 159C4486P001 1 10 1 2.1 1 1.5 14.0 l 1.71 0.3 I E51-R600 l controller i 163C1392P014 1 10 l 2.1 l 1.5 14.0 l 1.71 0.3 l E51-R606 l Indicator Unit l 164CS288P261040 l 18 l 18 l7 1 4.0 1 1.7 l 0.3 l See Note 3.1.3 E21A-S06 l Switch l 2T2A7689P001 1 - 1 -

I l 11.7 l 1.91 0.3 l Insuficient Data E21A-S07 l Switch  ! 272A7561P002 1 1

I - l11.7 1 1.91 0.3 l Insuficient Data E21A-S01 l Switch 1 145C3040P007 1 20 1 20 1 20 l 11.7 l 1.81 0.3 i See Note 3.1.3 E21A-S01-1 l Switch 1 145C3040P018 l 20 1 20 l 20 l 11.7 l 2.01 0.3 1 See Note 3.1.3 E21A-S02 l Switch i 145C3040P013 l 20 l 20 l 20 111.7 l 1. 9. l 0.3 l See Note 3.1.3 SO4 l l l l l l l l 1 SOS I l l 1 -

1 l l l l E51 A-S26 l l l l l l l l l E51A-SO4 I I l l l l l l 1 E51A-S05 I I l l 1 1 1 l l

1 i

SEISMIC QUALIFICATION REEVALUATION 117.5 INCH WIDE CONTROL ROOM PANEL CLASS 1E EQUIPMENT Panel MPL Ref: H13-P601 System: Reactor Core Cooling Bench Board Location, Elevation: Central Floor,166' Panel Dimension: 117.5" X 84" X 30" l CURRENT SEISMIC l l l CAPABILITY / I MAXIMUM EXPECTED l l MALRJNCTION LIMIT I PEAK ACCELERATION l EQUIPMENT i l l  !

l MPL NO. DESCRIPTION IDENTIFICATION l f-b s-s v I f-b s-s v l REMARKS E51A-S09 i Switch 1 145C3040P013 1 20 1 20 1 20 1 11.7l 1.91 0.3 l See Note 3.1.3 E51A-S07 l l l l l l l l l E51A-S39 I I l 1 1 I I I I um E51 A-S40 l l l l l l l l l

$; E51A-S10 l I I l l l l l. I E51A-S03 l l l l l l l l l E51A-S08 l l l l l l l l. 1 E51 A-S24 l l l l l 1 l l l E51A-S38 l l l l l l l l l E51A-S28 l Switch l 145C3040P003 1 20 l 20 1 20 -l 11.7l 1.91 0.3 1 S27 l 1 1 I I l l l' l S11 1 I l l l l l l 1 S13 I I I I I I l l l E51A-S15 l Switch l 272A7689P001 l I - 1 - l 11.7l 1.9 I n.3 I Insuficient Data E51A-S1T l Switch i 145C3040P003 1 20 1 20 1 20 l 11.7l 1.91 0.3 l See Note 3.1.3 E51A-S?2 i Switch i 145C3040P001 1 20 l 20 1 20 1 11.7l 1.91 0.3 l See Note 3.1.3 E51A-S33 i Switch l 272A7561P002 l - l - 1 - l 11.7l 1.91 0.3 l Insuficient Data E51A-S35-1 1 Switch, Contact Block l 145C3040P018 l 20 1 20 1 20 6 11.7 l 2.0! 0.3 l See Note 3.1.3 E51A-S01 l Switch i 145C3040P007 1 20 l 20 l 20 i 11.7l 1.81 0.3 l See Note 3.1.3 S35 I l l l l l l l l E51A-S01-1 l Switch, Contact Block i 145C3040P018 1 20 l 20 1 20 l 11.7l 2.01 0.3 l See Note 3.1.3 S02-1 l l l l l l l l l

SEISMIC QUALIFICATION REEVALUATION 117.5 INCH WIDE CONTROL ROOM PANEL CLASS 1E EQUIPMENT Panel MPL Ref: H13-P601 System: Reactor Core Cooling Bench Board Location, Elevation: Central Floor, 166' Panel Dimension: 117.5" x 84" x 30" l CURRENT SEISMIC l l l CAPABILITY / l MAXIMUM EXPECTED l l HALF 1JNCTION LIMIT l PEAK ACCELERATION l EQUIPMENT l l  : l MPL NO. DESCRIPTION IDENTIFICATION l f-b s-s v l f-b s-s v l REMARKS E51A-S02 i Switch i 145C3040PO49 l 20 i 20 l 20 1 8.2 l 1.41 0.3 l See Note 3.1.3 C11B-S04 l Switch l 145C3040P017 l 20 l 20 l 20 l 11.7 l 1.9 l 0.3 l See Note 3.1.3 m

- S06 l l l l l l l l l E12A-S37A l Switch 1 145C3040P013 l 20 l 20 1 20 111.7 l 1.91 0.3 l See Note 3.1.3 S39A l l l l l l l l. l S40A l l l l l l l l l 4

4 SEISMIC QUALIFICATION REEVALUATION 117.5 INCH WIDE CONTROL ROOM PANEL CLASS 1E EQUIPMENT Panel MPL Ref: H13-P601 System: Reactor Core Cooling Bench Board Location, Elevation: Central Floor,166' Panel Dimension: 117.5" X 84" X 30" l CURRENT SEISMIC l l l CAPABILITY / l MAXIMUM EXPECTED l l MALFUNCTION LIMIT l PEAK ACCELERATION l EQUIPMENT l l 1 l

HPL NO. DESCRIPTION IDENTIFICATION l f-b s-s v I f-b s-s v l REMARKS E22B-S03 i Switch ' 145C3040P013 1 20 20 20 11.7 l 1.9 1 0.3 l See Note 3.1.3 E22B-S05 I l l l I E22B-S11 l l l l l l l l l l E22A-S03 l Switch 1 272A7561P002 l 1

l  : 1 11.7 l 1.9 1 0.3 I Insuficient Data _

E22A-S05 l Switch 1 145C3040P001 l 20 1 20 l 20 I 11.7 l 1.9 l 0.3 1 See Note 3.1.3 Y E228-S01 l l l l l l l l l U i Switch I 20 1 11.7 l 1.9 1 0.-3 E22A-501 i 145C3040P013 1 20 i 20 l See Note 3.1.3 O

i l

SEISMIC QUALIFICATION REEYALUATION 117.5 INCH WIDE CONTROL ROOM PANEL CLASS 1E EQUIPMENT Panel MPL Ref: H13-P601 System: Reactor Core Cooling Bench Board j Location, Elevation: Central Floor, 166' Panel Dimension: 117.5" X 84" X 30" i

l CURRENT SEISMIC l l l CAPABILITY / l MAXIMJM EXPECTED I I MALFilNCTION LIMIT l PEAK ACCELERATION l EQtIIPMENT l l l MPL NO. DESCRIPTION IDENTIFICATION l f-b s-s v I f-b s-s v i REMARKS

. E22B-S02 i Switch 1 272A7689P001 1 -

1 -

1 -

l 11.7l 1.9l'0.3 l Insuficient Data S07 l l l l l l l l l 29 I I l l l l l l l

! ,, - S10 l l I l l l l l l l 1 -

S15 l l l l l l l l .I l E22B-SO4 l Switch 1 145C3040P030 l 20 1 20 1 20 1 11.7l 1.6 l 0.3 l See Note 3.1.3 S06 l l l l l l l 1 l l - 28 l l l l l 1 1 I l S12 I I I I I I I I I S13 I I I I I I I I I S14 I I I I I I I I I E22B-S16 i Switch l 272A7695P001 l l

1 l 8.4 l 1.7 l 0.3 l Insuficient Data _

E12A-S43A l Switch 1 145C3040P004 l 20 l 20 1 20 1 7.8 l_ 2.0 l 0.3 l See Note 3.1.3 E12-R607 l Indicator Unit l 164C5288P261041 l 18 1 18 17 1 3.6 l 1.41 0.3 i See Note 3.1.2 E12A-S20A l' Switch 1 145C3040P001 l 20 l 20 1 20 1 11.7 l 1.9 l 0.3 i See Note 3.1.3 B21H-K031 1 Relay l 164CS258P001 l 17 l 17 l 10 1 11.7 1 2.01 0.3 l See Note 3.1.3 E12A-AT6-I I Isolator Card l 204B6208AAG002 l 10 l 10 1 28 1 4,9 l 2.01 0.3 i See Note 3.1.3 E12A-AT6-0 l Isolator Card l 204B6220AAG002 l 10 l 10 l 28 1 4.9 l 2.01 0.3 l See Note 3.1.3 I

! SEISMIC QUALIFICATION REEVALUATION 1 117.5 INCH WIDE CONTROL ROOM PANEL CLASS 1E EQUIPMENT 1

Panel MPL Ref: H13-P601 System: Reactor Core Cooling Pench Board l Location, Elevation: Central Floor, 166' Panel Dimension: 117.5" X 84" X 30"

! I CURRENT SEISMIC l l i

l CAPABILITY / l MAXIMUM EXPECTED l I

l MALFUNCTION LIMIT I PEAK ACCELERATION I EQUIPMENT I l l

, HPL NO. DESCRIPTION IDENTIFICATION l f-b s-s y 1 f-b s-s v l REMARKS I

E12A-AT/-O l Isolator Card l 204B6188AAG002 l 10 1 10 1 28 14.9.I 2.0 1 0.3 i See Note 3.1.3 i B21H-K032 l Relay l 164C5258P001 1 17 l 17 l 10 l 4.9. I 2. 0. l 0.3 ISee Note 3.1.3 l E12A-AT8-0 l Isolator Card i 204B6188AAG002 l 10 l 10 1 28 l 4.9. I ,2.0 l.0.3 l See Note 3.1.3

,[ E12A-ATI-I l Isolator Card i 204B6186AAG004 l 10 1 10 1 28 l 4.9-l 2.0 1 0.3 l See Note 3.1.3 t

  • E12A-AT8-I l Isolator Card 1 204B6186AAG003 l 10 l 10 l 28 I .4.9 I 2.0I.0.3 l See Note 3.1.3 l AE12A-PSO4 I Power Supply l 198B6203AAG003 1 10 l 10 1 28 I 4.71 2.81 0.3 l See Note 3.1.3 PSOS I l l l l l 1 l l

{ E22A-S06 l Switch l 145C3040P001 1 20 1 20 1 20 1 11.7 l 1.9 l 0.3 l See Note 3.1.3 l

S07 l l l l l l l l .I E22A-S14 l Switch 1-145C3040P006 l 20 l 20 1 20 l 7.8 l 1.6 10.3 1 See Note 3.1.3 i E22A-S14-1 1 Switch, Contact Block i 145C3040P010 l 20 l 20 1 20 1 11.7 l 1.9 l 0.3 I See Note 3.1.3 l F,22A-S02 l Switch: Pushbutton l 145C3230P004 1 10 l 10 l 10 1 3.61 1.6 1 0.3 lSee Note 3.1.3 l E22A-S08 l Switch l 145C3040P004 l 20 l 20 l 20 1 7.8 l 2.0 l 0.3 l See Note 3.1.3 l

E22-R601 l Indicator Unit i 164C5288P239012 l 18 1 18 17 1 3.6 l 1.4 1 0.3 1 See Note 3.1.3 l E22-R603 I Indicator Unit i 164C5288P162041 1 18 l 18 l7 1 3.6 l 1.4 1 0.3 l See Note 3.1.3 E22A-S01 l Switch 1 145C3040P013 1 20 1 20 1 20 1 11.7 l 1.91 0.3 l See Note 3.1.3 SO4 l l l l l l l l l S10 l l l l l l l l l S11 l l l l l .I I I I l

S12 l l l l l l l j 1 S15 l l l l 1 1 I I l S23 l l l l 1 I I I I A Readings from accelerometers mounted on the power supply.

COMPONENT LOCATION.AND "g" FIELD

, H13-P601 PANEL 3

A 3.1 5.1 7.1 INCLINE 9

0;  ; TOP SECTION -

0$

4.0 4.6 4.9 M

e^

a:'  : 8:8 VERTICAL LJH .C 1.2 3.0 3.6 MIDDLE SECTIC'

@ b C 1.1 1.6 1.4 G GB 0.3 0.3 0.3 i B -

7.8 8.2 8.4 0 1.6 1.4 1.7 F K MN 0.3 0.3 0.3 INCLINE

@ BO ROM SECTIOT

@ 11.7 11.7 11.7 A

ED E 1.8 1.7 1.9

.0.3 0.3 0.3

--l - 2__ . . 3

~

Order in each cell

= f-b s-s .

. V H12-P870 ,

Positiin ' - - -

Locator Part # Description "g

_ " Field Locator ~

A 145C3040 Switch E-3 & B-3 B 145C3230 Switch: Pushbutton C-2 & C-3 C 164C5288 Indicator Unit B-1 D 272A7689 Switch E-3 E 272A7561 Switch B-3 & E-3 F 272A7685 Switch D-3 G 272A8971 Switch C-2 & C-3 H 159C4486 Sq. Root Converter B-1 1 19886203AA Power Supply * (See Note 3.1.12)

J 163C1392 Controller B-1 K 204B6208AA Isolator Card * (See Note 3.1.12)

L 204B6220AA Isolator Card * (See Note 3.1.12) 3-20

i Position Locator Parts # Description "g" Field Locator M 204B6188AA Isolator Card * (See Note 3.1.12) 4 N 164C5258 Relay * (See Note 3.1.12)

~

0 204B6186AA Isolator Card * (See Note 3.1.12) 4

.2 r

3-20A

\

l

. . . . . . . - . - - , _ . _ . _ _ . _ , . , _ , - _ . - - . - . - _ _ . - . . . ~ _ , .- -.

~

t ,

4.1 RESONANCE SEARCH TEST DATA FOR VARIOUS TESTED CONTROL ROOM PANELS Table 1 Resonance (Hz) Panel faQ21 f/_B 1 f/_S }lidth (inches)

P H13P654 34 53 18 36 P H13P655 29 53 21 60 G H13P693 41 35 21 48 CL H22P028 34 60 14 36 C0 H13P628 36 -

19 48 L H12P661 16 32 11.5 96 CO C61P001 22 - 22 96 L H12P601 12 - 18 158 C0 H13P618 25 33 19 72

---+- *C0 H13P601 34 -

19 105

  • C0 H13P603 14 26 28 174 B H13P671 25 30 10 90 LEGEND CO - Cofrentes L -- Limerick P - Perry G -- Grand Gulf CL - Clinton B -- BWR 6 Prototype

= Bench Boards 1

4-1

, Table 2 .

CLASS 1E EQUIPMENT ON TESTED PANEL AND THEIR CURRENT SEISMIC CAPABILITIES

~

b Current Seismic! Tested Panel Accelerometer Equipment Capability Number on Tested Panel f-b s-s v f-b s-s v f-b s-s v 136B3127 3.7 3 2.3 I H13 P693 H22bP028 H2h-P028 4/5 4/5 145C3040 7.5 4.0 10.0 H13EP680 H133693 H139P693 7 7 7 145C3043 10.0 3.5 1.2 b H13k628 H12S028 E H13k628 5 5 5

~~ -

Co Co Co 14_5C3230 5.0 8.8 10.0 H13-P603 H13-P603 H13-P603 3 3 3 C C C i

! 159C4251 3.2 2.0 2.8 H22-P028 H22-P028 H22-P028 3 3 3 159C4486 10.0 2.1 1.5 b C61k001 C61h001 C61h001 6 6 6 3 Co Co Co 4 163C1392 10.0 2.1 1.5 C61-P001 C61-P001 C61-P001 6 6 6 163C1565 (same as Co Co Co 163C1566) 4.0 1.0 1.0 C61-P001 C61-P001 C61-P001 3 3 3_ _ . _

Co Co co 164C5150 5.0 2.5 2.3 H13-P618 H13-P618 H13-P618 2/4 4 2 Pe Pe Pe 164C5258 4.0 3.0 1.5 H13-P628 H13-P628 H13-P628 4- 4 4 Legend:

C: Clinton C0: Cofrentes

_ . _ _ G: Grand Gulf

, P: BWR Prototype Pe: Perry j __

4.3 REFERENCES

4.3.1 Seismic Test Reports, GE DRF A00-1138 4.3.2 GE DOCUMENT A00794-9 4.3.3 GE DRF A00-1084 -

4.3.4 MPL and Panel Reference for Device List:s ,

PANEL fEg ASSEMBLY DRAWING f H13-P601 386X400BA 865E617G001,2 H13-P618 368X526BA 865E516G1 H13-P621 368X528BA 133D9999G1 H13-P622 368X529BA 137D7213G1 H13-P623 368X530BA 137D7214G1 H13-P625 368X531BA 865E542G1 H13-P628 368X532BA 865E278G1 H13-P629 368X533BA 865E517G1 H13-P631 368X534BA 865E279G1 H13-P632 368X535BA 865E292G1 H13-P642 368X539BA 865E280G1 H13-P654 368X416BA 865E789G1 H13-P655 368X417BA 865E897G1 H13-P669 see Assy Dwg PL 851E919AA H13-P670 see Assy Dwg PL 851E920AA H13-P671 see Assy Dwg PL 851E921AA H13-P672 see Assy Dwg PL 851E922AA H13-P680 see Assy Dwg PL 386X545G1 H13-P691 386X224BA 865E520G1 H13-P692 386X245BA 865E521G1 H13-P693 386X246BA 865E522G1 H13-P694 386X247BA 865E523G1 4.3.5 Transmittal, Bechtel to GE, GET 80/0174, dated 12/2/80, Floor Response Spectra for Control Room Building Elevations.

4.3.6 GE DRF A00-794-5-1 4-3

_ _ _