ML20028D126

From kanterella
Jump to navigation Jump to search
Responds to IE Bulletin 82-04 Re Electrical Penetrations Using Hard Epoxy Module Design.No Bunker-Ramo Electrical Penetrations Installed or Planned for Use in safety-related Sys
ML20028D126
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 01/06/1983
From: Root L
IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
REF-SSINS-6820 IEB-82-04, IEB-82-4, NG-83-0001, NG-83-1, NUDOCS 8301170118
Download: ML20028D126 (1)


Text

Iowa Electric Light and Ibwer Company January 6, 1983 NG-83-0001

',' I f,'4"'

'ir. James G. Keppler Regional Administrator Region III U.S. Nuclear Regulatnry Commission 799 Roosevelt Road Glen Ellyn, IL 60137

Subject:

Duane Arnold Energy Center Docket No.: 50-331 Op. License No.: DPR-49 IE Bulletin 82-04

Dear Mr. Keppler:

Following a thorough document review, we have concluded that no Bunker Ramo electrical penetrations which use the hard epoxy module design are installed or planned to be installed in safety-related systems at the Ouane Arnold Energy Center.

This statemer.t is true and accurate to the best of my knowledge and belief.

IOWA ECTRIC LIGHT AN POWER COMPANY BY e OL

().3rryD. Root Subscribed and sworn to Before Me on this 6 @ day of O fa,n , 1988.

8301170118 830106 PDR ADOCK 05000331 i 8 26*/g! ll)- &Lk6D Noyary Public in and for the State of Iowa LDR/SS/rh*

cc: S. Swails S. Tuthill D. Arnold F. Apicella L. Liu NRC Resident Office T

' LI//

Ref: Commitment Control No. 820509 JAN 101983 Geru uni t!!fier

  • ID. lito 331
  • Cesler it.upiels. Ismin 52406
  • 319/398 4411